Keel Infrastructure Corp. (KEEL) Earnings Call Transcript & Summary
March 27, 2025
Earnings Call Speaker Segments
Tracy Krumme
executiveThanks so much. Morning, everybody, and thanks for joining us for Bitfarms' Q4 2024 earnings call. Joining me today are Ben Gagnon, our Chief Executive Officer and Director, along with Jeff Lucas, our Chief Financial Officer. Before we get started, I want to point out that there's a webcast of this call along with a slide deck that goes with it. You can find today's press release and our presentation on our site, bitfarms.com, in the Investor section. Moving to Slide 2. I want to remind you all that during this call we'll be making certain forward-looking statements, and actual future results might not match what those statements imply. That forward-looking information rests on certain assumptions and carries risks and uncertainties, and I'd encourage you to look at Bitfarms' MD&A for the full list. Also note that we'll reference certain measures that aren't recognized under IFRS, so they might not line up with similar measures other companies present; listeners should check today's press release and our MD&A for definitions of those non-IFRS measures and how they reconcile to IFRS measures. Keep in mind that all financial references are in US dollars, unless we say otherwise. Now, moving to Slide 3, I'm happy to hand things over to Ben Gagnon, Chief Executive Officer and Director. Ben, go ahead.
Ben Gagnon
executiveThanks, Tracy, and I appreciate all of you being here today. During this call, I'll go over what we achieved in 2024 and so far in 2025, plus give you a picture of where the new Bitfarms is headed in 2025 and afterward. Let's move to Slide 4. Compared with where we stood at the start of 2024, Bitfarms is an entirely transformed business. On just about every measure, we've quickly remade ourselves from an international Bitcoin miner into a North American energy and compute company. The gains tell the story on their own. Within our Bitcoin compute portfolio, starting January 1, 2024, we've grown our hashrate to 18.6 Exahash Under Management, close to a threefold increase, and lifted our efficiency by 45%, hitting the Q2 2025 efficiency guidance of 19 watts per terahash a full three months early. Our fleet upgrade powered both of those gains, bringing the typical age of our active miner fleet down from roughly three years old to roughly one years old as of today. Over that same stretch, in our energy portfolio, we've grown energy capacity by more than 90%, reaching 461 energized megawatts a day. We've assembled an energy pipeline exceeding 1.4 gigawatts, with close to 80% located in US, and through our PJM portfolio we cut our projected average power price to $0.043 per kilowatt hour while gaining much tighter command over our energy expenses; combining greater efficiencies in our <<inaudible>> portfolio with cheaper energy in our energy portfolio, we've pushed our hash cost down by almost 50%, to about $22 per terahash. This mostly removes risk from our portfolio and gives us a base for stronger profitability and cash flow across 2026 and beyond, even as we direct the company and our capital toward fresh growth opportunities in the US and with HPC. Notably, for the first time in our eight-year history, Bitfarms is a US-focused company, with the bulk of our pipeline sitting in the US. The US accounts for 33% of the energized megawatts in our portfolio today, and that share should climb to close to 80% in the years ahead as we carry out our growth pipeline, virtually all of which sits in US. Our momentum has done nothing but build through the first quarter. We completed our transformative acquisition of Stronghold Digital Mining, the biggest M&A transaction ever between two public miners in our sector. We finished the strategic sale of our 200 megawatt Yguazu data center, the largest site we've ever built; we pushed our HPC and AI strategy forward by bringing on two new advisors. We brought in two new critical team members, an SVP of Infrastructure and an SVP of HPC and AI, and we sharply raised our hashrate, getting to 18.6 exahash under management, which, running at 100% 24/7, could generate over 10 Bitcoins a day under current mining economics and which we believe can compete in producing free cash flow through 2026 and beyond; we are a very different and far stronger company today than we were when we began or even closed out last year. I'd like to take a few minutes now to talk about why our two latest deals played such a major role in reshaping this company, and how they've positioned us so well for what should be an exciting 2025 and the years after. Let's turn to Slide 5. Only a week ago, we put out announcements on two fronts: the completion of our purchase of Stronghold Digital Mining, and the completion of the strategic divestiture of our Yguazu facility in Paraguay. These are distinct transactions, yet each sits within a single portfolio management approach, so looking at what they accomplish side by side makes sense. With both of them finished, our portfolio has been thoroughly reshaped — the result is that we're larger, improved, and more resilient. To begin with, our energy portfolio is bigger now and can expand further and more rapidly going forward. Even after selling Yguazu, our biggest build ever, we still grew our energized megawatts and locked in a pipeline of growth energy assets capable of scaling our Pennsylvania infrastructure portfolio beyond a gigawatt over the next several years. Next, we're generating improved operating economics throughout our portfolio. Thanks to shifting toward cheaper American power and to handling our energy expenses via PJM's strong power trading, curtailment, and demand response programs, we can bring down our top operating cost, which is energy. Keeping our energy costs in check matters enormously to keeping our future in check, and with our expanding PJM portfolio we can now accomplish that with far more scale, precision, and flexibility. Finally, these two accretive deals have left us better capitalized for 2025 and the years ahead, for these reasons. One, selling Yguazu cut our planned 2025 CapEx needs to under $100 million, which is 20% below what we told you at the beginning of the year, and it releases the invested capital and profits from that Yguazu sale so they can be reinvested into US infrastructure. Two, we sidestepped the substantial extra costs that finishing construction, energizing, and populating the 200 megawatt Yguazu site with new miners would otherwise have demanded. We put that savings at $325 million. And three, through Stronghold we picked up two sites that are fully operating, and our hosting agreements have upgraded both of them during the past four months. Equity made up the bulk of the consideration for this deal, every Stronghold loan has been repaid in full, and that saves meaningful interest expense while keeping our financial flexibility intact to partner with strategic financiers on possible HPC and AI projects. In short, the strategic logic behind buying Stronghold while at the same time selling Yguazu amounts to two sides of one coin. These deals have rebalanced our portfolio toward the US, where we anticipate higher yields per megawatt. Our average power cost portfolio-wide has come down. We've trimmed our CapEx needs while boosting both liquidity and direct operating margins, which helps fund new infrastructure investments. And finally, we've obtained locations for HPC that we think are extremely attractive, allowing us to expand past Bitcoin mining into energy generation, trading, plus HPC and AI. A portfolio management approach like this simply doesn't exist within our sector. Completing a sizable public M&A transaction at the same time as a major strategic divestiture was a significant undertaking, and I feel tremendous pride in the Bitfarms team and everything we've achieved during this quarter; we've reshaped this business quickly, and it genuinely demonstrates just how much more robust the new Bitfarms has become and what lies within our reach going forward. Now moving to Slide 6. When we consider what's ahead, the picture is quite different from what it was 1 year ago today. Given that we've integrated vertically into power generation and locked in the biggest growth pipeline this company has ever had, we need to approach our megawatts somewhat differently than before. The easiest framework, I think, is to view it across three buckets. Bucket number one is made up of 461 energized megawatts and represents megawatts that are presently being monetized. At this point, that mostly happens through Bitcoin mining, but as we branch out past Bitcoin mining, it will in time encompass additional use cases such as HPC and AI.
Ben Gagnon
executiveIf you're an investor focused on Bitfarms' present-day operational footprint and the cash flow we're currently generating from operations, this metric matters most. Our second bucket is made up of more than 131 megawatts under development, and it tracks megawatts already secured for growth in the near to medium term; these are megawatts that have been approved for development and need no additional regulatory approvals or permits before development or energization can start. If near-term growth potential is what interests you as an investor, this metric captures it best. Bucket number three consists of over 800 megawatts within the megawatt pipeline. It monitors those megawatts currently being worked on that require further regulatory steps, approvals, certainty, or clarity prior to development over a span of multiple years. For those investing over the long haul with an eye on our growth potential through 2028, this metric provides the strongest picture of the company's long-term potential, direction, and strategy. Turning to Slide 7, this slide sets out the route to surpassing 1.4 gigawatts of power capacity and illustrates how our growth efforts transform our portfolio into one composed of close to 80% US megawatts and 90% North American megawatts. So right now, we've got 461 megawatts that are energized, and that number will climb to 500 megawatts by the time the year wraps up — that includes the planned megawatts we're developing at both Sharon and Panther Creek. Along those same lines, for 2026 we're projecting an additional 92 megawatts, bringing the total to 592 megawatts, with contributions from Sharon, Panther Creek, and Washington. Then, looking at the stretch from the close of 2026 through 2028, the added capacity should come from megawatts that are presently under study and application at Panther Creek and Scrubgrass, adding up to 1.4 gigawatts. As we set our sights on that future and work through our growth pipeline, we'll continue enhancing the makeup of our portfolio by putting the US and Canada first, along with those energy assets that offer opportunities extending past Bitcoin. We think that'll result in reduced energy expenses overall along with improved output for each megawatt, which builds enduring worth for those holding shares. Turning to Slide 8. The largest and most thrilling segment of the megawatt pipeline we have is that gigawatt of possibility sitting in the US. Our renewed emphasis on America, together with our energy holdings there, is attracting considerable attention from the investment community. By means of these holdings, we're unlocking fresh and compelling prospects for Bitfarms in fields outside Bitcoin mining — spanning power production, trading, plus HPC and AI — things that simply weren't achievable across Latin America and which will shape what this firm becomes over the coming decades. Breaking that gigawatt of capacity into the tranches we went over on Slide 6, and pulling out the generation piece the way we've shown on this slide, makes it much easier to grasp. Over at Panther Creek and Scrubgrass, we run two powerplants that can generate electricity and sell it into the grid. Those same facilities can also pull from and use an equivalent amount of power from the grid as what they're able to produce. Today, there's no way to capture revenue from all of the output from the power plants and the grid-based power at the same time. Achieving that means we'll have to put more money into the data center infrastructure and obtain clearer guidance from FERC; we're quite confident that this regulatory clarity is on its way and will back up our site plans; and as this approval process from regulators continues, it's up to us whether to deliver 142 megawatts of power to the existing data centers from the power plants or from the grid. At present, the power plants are what supply our data centers, since that's the cheaper route. Beyond that, there are six distinct power projects at the two locations, each progressing well and at various stages of the approval process, but combined they have the potential to grow both sites to between 400 and 500 megawatts by 2028. Last, Sharon, with 120 megawatts of potential, is the smallest Pennsylvania location, yet it remains bigger than any of our sites outside Pennsylvania. Sharon is operating at 12 megawatts today, increasing to 30 megawatts in Q2. In addition, Sharon has 80 megawatts in active development for 2026, plus another 10 megawatts in the pipeline that still requires additional reviews, studies, and approvals — totaling 120 megawatts. Combined, the three sites reach a cumulative 1 gigawatt of potential. Moving to Slide 9. I want to spend a minute now going deeper into our HPC and AI strategy and talk through a few important strategic steps taken in recent weeks that have put us in a great position to seize this enormous growth opportunity. Only last week, seven people from our team attended the yearly NVIDIA GTC conference in San Jose. Our team's schedule was packed back-to-back with prospective partners in the space across every angle, covering financing, development, infrastructure, and end use customers. The bulk of interest centered on three items, power, land and fiber, and we have those in abundance across all three Pennsylvania sites. We spoke individually with over twelve respected companies in this sector, and their feedback came back wholly favorable and thrilling. Each location provides near-term electricity access, room to expand over the long haul, and multiple supply options—including generation located at Scrubgrass and Panther Creek. Reliability improves when you have multiple power inputs, and anticipated capital and operating expenses for HPC drop, which renders these locations very appealing to prospective HPC clients, especially hyperscalers. Jensen Huang's GTC presentation underscored this reality, as available power is limited and stands as the primary constraint on expansion. For quite some time now, this has been clear to everyone at Bitfarms, and it stands among the key factors behind our team's confidence in the Pennsylvania locations. After shifting toward HPC, we added two critical team members: James Bond, appointed as our SVP of HPC, and Craig Hibbard, who joined as SVP of Infrastructure. James carries profound knowledge in both HPC and AI, with over two decades of experience in that space. He joins us by way of Hewlett Packard, spending 15 years there leading the North America HPC and AI infrastructure platforms category, which grew to $2 billion in 2024 — representing a 160% year-over-year increase. While at HPE North America, James oversaw every HPC and AI go-to-market initiative, and his track record of deploying HPC solutions at scale positions him perfectly to steer this new phase at Bitfarms. Our newly appointed SVP of Infrastructure, Craig, possesses broad experience directing large-scale digital infrastructure efforts and most recently drove the swift design and build of more than 200 megawatts of digital infrastructure for a US company focused on digital assets along with HPC and AI. Located in Pennsylvania, Craig will be essential in guiding the growth of our fast-expanding PJM portfolio. James and Craig will collaborate closely with our strategic partners, ASG and World Wide Technology, to finish the thorough feasibility analysis across all our North American sites and provide guidance on our worldwide HPC and AI strategy. Simultaneously, ASG and WWT will assist in crafting accelerated sales and development strategies and in promoting our sites to prospective customers on Bitfarms' behalf. Both efforts are already progressing well, and ASG has provided preliminary high-level feasibility reports covering our three PJM sites.
Ben Gagnon
executiveEvery one of the three reports backs the conclusion that our Pennsylvania locations are highly promising and fit well for conversion to HPC and AI. Each sits near other data center campuses and peering hubs, and all three possess the power, land, and fiber infrastructure required for HPC. Pennsylvania's colder weather ought to boost power efficiency and lower costs as well, which means that for HPC, a megawatt there carries more value than an equivalent megawatt in Texas. On these three maps you can see fiber connectivity across our Pennsylvania sites: Panther Creek, Scrubgrass, and Sharon. Robust fiber infrastructure exists within 10 miles of every one of these facilities. When we sit down with hyperscalers and other prospective partners, fiber infrastructure ranks among the very first things they ask about, if not the first. Close by, Scrubgrass has seven metro networks, Panther Creek has eight, and Sharon has nine; proximity of these PJM facilities to metro areas and long-haul infrastructure featuring peering and interconnection hubs also deserves mention. Roughly one hour separates both Scrubgrass and Sharon from Pittsburgh, while Panther Creek lies just two hours from New York City and Philadelphia alike. For our remaining North American sites, we anticipate receiving complete, detailed feasibility studies from our partners in Q2, and at that time we'll give an update on our HPC and AI plans. Thanks to these recent actions, we currently have the properties, the internal team, and the strategic engineering and marketing advisors in place, pursuing a holistic approach to growing our HPC and AI business. Moving to Slide 10. Changing topics somewhat, I'd like to cover a new strategy we kicked off recently: Bitcoin One. It continues our Synthetic HODL program, launched as a pilot in Q4 2023, with a handful of strategic adjustments. As a reminder, that approach entailed selling Bitcoin to fund OpEx and CapEx while keeping upside exposure to Bitcoin via long dated Bitcoin call options on between 10% and 20% of every Bitcoin sold. Through this program, we could take the excess Bitcoin produced monthly and finance our growth at a cost of capital far below what external or dilutive funding sources would demand, all while retaining Bitcoin upside. Low-cost capital from this program was key, delivering superior returns and outperformance versus Bitcoin. From the program's inception in Q4 2023 through December 31st, 2024, it beat Bitcoin's price, and we achieved a 135% return in US dollar terms, generating a trading profit of approximately $18 million. Building on that proven success, we created a more robust program and initiated it in Q1: Bitcoin One. It is a quantitative investment multi-strategy program that takes a disciplined approach to accumulating Bitcoin through diversification, strategic leverage, and market timing. When it comes to Bitcoin One, what we're doing is concentrating on managing an active Bitcoin treasury through trading algorithms that are both discretionary and rules-based, plus a program for actively managed volatility targeting that treats crypto volatility as an asset class and collects the risk premium stemming from it. This initiative is built for the digital-asset ecosystem's continued maturation, offering Bitfarms a scalable, risk-managed way to monetize Bitcoin's volatility. Our view is that pairing Bitcoin One with the predictable cash flow our mining operations generate from Bitcoin hands us a distinct edge across both markets, letting us achieve stronger probabilistic returns while accumulating Bitcoin more quickly and at lower cost. Moving on to Slide 11, to sum up, our progress so far this year has been substantial, and we anticipate that momentum carrying through the remainder of 2025. Every strategic step taken over the last few months received careful consideration, guided by two primary objectives: expanding our US operations, and putting our megawatt to use in the most value-additive, cost-efficient manner available, whether that means Bitcoin mining or HPC and AI. What sets us apart is our ability to acquire and oversee valuable property assets while extracting maximum value from them via operational excellence. Before handing things to Jeff, I want to call out four key takeaways. To start, our position right now is exceptionally strong. Over the past 15 months, we have entirely reshaped our growth pipeline, shifting from Latin American energy toward a US-based pipeline that is cheaper, larger, and superior. Next, our Bitcoin business remains solid, and our outlook on mining economics for the fleet we run stays bullish. Thanks to lower hashcost coming from our competitive energy prices and substantially better efficiency resulting from the fleet upgrade program, we expect our Bitcoin compute portfolio to mostly derisk the business through 2026, delivering a robust cashflow and a low CapEx base for the company as we pursue diversification past Bitcoin mining. Crucially, given the new competitive fleet now in operation, there is neither a need nor any plan for a major miner purchase during 2025 or 2026; our focus and capital will instead go toward developing US energy and HPC infrastructure. Third, our approach to managing energy assets takes the long view. We stay bullish on Bitcoin mining and have confidence in our core business, particularly near-term. Over the long-term, though, we see HPC and AI as a meaningful chance to build lasting shareholder value, which explains the tangible steps we have taken to move our HPC business forward. At this point we have secured the properties, brought on the best internal team, and engaged the strongest external partners. Finally, I want to stress how important the substantial changes to our team over these past few months have been. With the recent additions of our SVP of HPC and AI and our SVP of Infrastructure, every key management position in the company is now filled. On top of that, we've overhauled how our operations are organized from the ground up, and you can see the proof in what we got done during Q1 — the payoff from the formidable group we put so much effort into assembling is starting to show. My gratitude goes out to each of our team members for how dedicated they are to the Bitfarms mission, and my confidence in this team and in what we can deliver has never been higher. Moving to Slide 12 — with that, I'll hand things over to Jeff so he can walk through the financial update.
Jeffrey Lucas
executiveThank you, Ben, and I appreciate everyone being here today. Before we go through what happened in the fourth quarter, I want to emphasize how much of a transformation the initiatives Ben described will bring to this company. To begin with, we head into 2025 and beyond in a stronger capital position. Equity made up the bulk of the consideration for the Stronghold deal, and the roughly $45 million of debt it carried was fully settled. By selling Yguazu, we cut what we expect to spend on CapEx in 2025 to under $100 million, which is 20% below our earlier plan, and that released invested capital from the divestiture can now go back into US infrastructure. Next, our Bitcoin mining operation is still performing well; thanks to the reduced hashcost of the new fleet, the risk profile of our Bitcoin mining portfolio has come down substantially, and that gives us a foundation to benefit from any upside in BTC. It's worth stressing that we intend to make no significant miner acquisitions during 2025 or 2026, and instead we'll direct our capital toward building out US energy and HPC infrastructure. Third, the high value of our North American assets, together with cash flow generated by mining, will let us tap debt financing to support our energy and HPC infrastructure buildout at a cheaper cost of capital and with far less dilution than raising equity would cause, which drives long-term shareholder value. If you'd please turn to Slide 13. We'll go through the financial results for the fourth quarter. During that quarter, we mined 654 Bitcoin, generating total revenue of $56 million, which is a 21% increase over the third quarter. Our mining activities brought in $55 million of revenue, while the remaining $1.6 million came from Volta, our electrical services subsidiary. Direct mining profit came to $26 million, which works out to a direct mining margin of 47% and an average of $39,000 for each Bitcoin mined. Cash, general and administrative expense, or G&A, totaled $14 million, and that figure included $1.3 million of unusual and non-recurring professional services fees during the quarter, mostly tied to costs we incurred related to the Stronghold acquisition. The operating loss for the quarter was $16 million. The company also posted net financial income of $22 million for the quarter, which includes an $18 million gain on derivative assets and liabilities, mostly attributable to our Synthetic HODL program, plus a $6 million gain from revaluing warrant liability tied to warrants issued in earlier financings. Consequently, net income for the fourth quarter reached $15 million, or $0.03 per share, versus a net loss of $37 million, or $0.08 per share, in the third quarter. Let's move on now to Slide 14. Our adjusted EBITDA for the fourth quarter came in at $14 million, or 25% of revenue, compared with $6 million, or 12% of revenue, during the third quarter. As we've mentioned on prior quarterly earnings calls, adjusted EBITDA for us is quite simple: it measures only the cash profitability of our mining operations and the profit contribution from our Volta subsidiary; we exclude mark-to-market adjustments on our Bitcoin holdings as well as any other balance sheet valuation adjustments from adjusted EBITDA. Now let's shift to operating performance in the fourth quarter and our per-Bitcoin metrics. During the quarter, gross mining profit came to $26 million, equivalent to 47% of mining revenue. For each Bitcoin mined in Q4, our direct cost was $40,800, while the all-in cash cost reached $60,800, versus revenue of $83,400 per Bitcoin, which left us with a cash profit per Bitcoin slightly above $22,600. Moving to Slide 15 now. I'll go over our liquidity position and what capital we expect to need. On March 26, our total liquidity stood at roughly $135 million, made up of cash plus unencumbered Bitcoin; beyond that, $31 million in payments from HIVE are due across the coming six months related to the Yguazu sale, and buying our mining business stays solid, throwing off $8 million to $12 million monthly in cash from mining operations, which gives us more than enough liquidity to cover our identified CapEx for 2025. There are a few key things I want to stress regarding our financial needs ahead. First, 2024 was a one-time, fleet-wide upgrade plus investments in new miners. Second, selling the 200 megawatt Yguazu facility strategically cut our 2025 CapEx needs by more than $325 million, a figure that includes $85 million for building out that facility along with roughly $240 million more for acquiring and deploying miners. Third, now that the Yguazu sale has closed and our fleet upgrade is mostly finished, the company has no identified plans for major miner purchases during 2025 or 2026. As a result, for the remainder of 2025, identified capital expenditures—covering infrastructure development and the rest of our miner upgrade deployment—are expected to come in below $100 million, with the bulk of that money going into infrastructure so we can grow megawatts under management from 460 megawatts today to 590 megawatts in 2026. Finally, given that we carry virtually no debt and enjoy strong cashflows from mining, we see plenty of options for financing possible HPC and AI projects, and we're in active talks about developing our North American sites. Turning to Slide 16 now. Before we get to Q&A, I want to share Ben's enthusiasm regarding how strongly positioned Bitfarms is, along with some market commentary on Bitcoin mining economics. Although we acknowledge Bitcoin's price declined in the first quarter, we see today's mining sector as a possible opportunity for investors in most publicly traded miners, Bitfarms especially, and here's the reasoning. This hashprice sensitivity table reflects our best current estimate of mining economics for 2025 and 2026. Bitcoin price sits on the Y axis. Current network difficulty and our forecast of network hashrate at the close of each quarter through 2026 sit on the X axis. Using those two variables, we can build a hashprice sensitivity table. To make the chart hit harder, we overlay an implied direct mining margin against a hashcost of $22 per petahash, plus our best forecast for expected Bitcoin price ranges per quarter through 2026, shown by the highlighted sections outlined in black. What this chart illustrates is that new-generation mining equipment, when paired with electricity priced as competitively as Bitfarms secures it, is mostly shielded against Bitcoin downturns and should still produce free cash flow even under tough macro circumstances across 2025 and 2026. Take Bitcoin at $80,000 right now, 20 watts per terahash efficiency, and $43 per megawatt hour for power — under those assumptions a miner gets a direct margin of about 50%, with considerable room to benefit if Bitcoin climbs. Should Bitcoin remain above $100,000 or $125,000 for the bulk of 2025, direct mining margins ought to land somewhere between 50% and 75% that year; this is a sector positioned to do rather well in 2025; so with that, I'll hand things over to Ben ahead of starting Q&A.
Ben Gagnon
executiveAppreciate it, Jeff. I want to restate for everybody that the thesis we started with regarding Bitcoin hasn't changed at all. Our view is still that 2025 looks bullish for the economics of Bitcoin mining, and there's strong potential for that to generate substantial shareholder value during 2025 from the fleet and footprint we already have. Looking at 2026, we anticipate a likely correction in mining economics, caused by hashrate across the network continuing to climb along with a pullback in Bitcoin's price from a fresh all-time high that we think gets set at some point later in 2025; that lines up nicely with a more grounded timeline for HPC revenue coming in during 2026. Should a 2026 correction play out along those lines, it would probably take us back to hashprice economics and direct margins resembling what we're seeing right now, and those are healthy. That's our base case, and there's considerable upside potential plus exposure to Bitcoin prices moving higher, particularly in 2025. Thanks. With that, I'll hand things back to the moderator for the Q&A.
Brett Knoblauch
executiveHey everyone. I appreciate you taking my question, and congratulations on bringing in those 2 new people. That's good to see. So when you look at the Stronghold locations, it seems like there's obviously a strategy where you might repurpose them for additional AI/HPC capacity instead of Bitcoin mining. I suppose — could you just update us on the timeline from a regulatory perspective regarding what's required, and when you anticipate receiving those approvals? Also, how interested are potential partners in the site as it stands right now without those approvals, or do we have to secure them first?
Ben Gagnon
executiveThanks, Brett. Sure, so at the Stronghold site there are a few distinct categories of energy, as I mentioned on an earlier slide; when it comes to the generating capacity that already exists and the grid import capacity that already exists, neither requires any additional regulatory approval to run. At present, we're able to either supply power straight from the generating assets to a data center, or pull an equivalent amount of power off the grid. Regulatory approvals only enter the picture when we try to examine a configuration covering all of the megawatts at those sites. So the additional megawatts we're evaluating and processing—those could require anywhere from roughly a year up to three years, and they're spread across six separate applications at two separate locations. Still, what I find genuinely persuasive when it comes to the HPC <<inaudible>> is this: we've got power capacity ready right now in 2025, and <<inaudible>> that would become usable during 2026. On top of that, there's potential to grow over multiple years. And whenever many of these hyperscaler or HPC customers consider putting money in, 100 megawatts <<inaudible>> what they're weighing is, I will commit capital to a site across a multi-year horizon. I'm trying to figure out what I'll be able to do with those 100 megawatts.
Brett Knoblauch
executiveGreat, thanks so much. And Jeff, I've got something I'd like to ask you. It's about capital expenditures. You folks mentioned that for this year, CapEx should come in under $100 million. Would you mind breaking that down for us? How much of it, roughly, is going toward Bitcoin mining, and how much is going toward infrastructure that might eventually be leveraged or used for AI, as you see it?
Jeffrey Lucas
executiveAlright, happy to cover that. As I noted earlier, our capital expenditures come in under $100 million — closer to roughly $95 million for the year. Honestly, Brett, just a modest share of that total is earmarked for miners, and really it's more about logistics costs tied to rolling out and finishing the upgrade program we kicked off back in 2024. So of that $95 million, about $7 million goes toward that. The rest of the funds are largely being directed at infrastructure build-out, mainly at the Stronghold and Sharon facilities, with a smaller piece taking place in Baie-Comeau, in the Quebec region, plus some final work underway in Argentina too.
Brett Knoblauch
executivePerfect. Thank you, guys. Really appreciate it.
Mike Colonnese
analystMorning, Ben, Jeff, and everyone else. Nice work on everything you've accomplished during these past few months. Starting with the HPC/AI piece — Ben, you mentioned a timeline tied to approval and available energy. Still, the initial results coming out of the HPC/AI feasibility studies sound quite encouraging. I'm wondering, given the discussions you're having with potential customers, whether hyperscalers or other AI players, what do their due diligence schedules tend to look like? Also, how would a customer probably make use of your energy assets at those sites? Would that lean toward something like a public shell arrangement, or a data center that's fully built out? I'm just hoping to understand better the path to monetization if a deal got signed in the near term.
Ben Gagnon
executiveAppreciate that, Mike. Yes, that's a solid question. When you're evaluating possible deals with hyperscalers — these aren't Bitcoin miners. They don't operate with that same kind of aggressive growth posture where a deal could close within a couple of days; these firms truly invest a great deal of time in their due diligence. And I'd say a fast timeline would be six to nine months. A more realistic timeline, I think, is nine to 12, and it might stretch past that too. That said, the conversations with a hyperscaler work such that you'll find out pretty early if the site doesn't interest them — they won't devote six months to a quick evaluation; they'll do a quick evaluation and determine whether the site merits investing time. But to finish the complete due diligence, it's likely a nine to 12-month estimate. Now, regarding how you construct the timeline and what an actual structure looks like, the opportunity here is that particularly with the powered land and powered shell pieces, those are items you can begin before a deal happens. That's going to help move the deal forward while it's working through due diligence, and also speed up the timelines and the anticipated valuation, since the timeline to energization is really what drives value in HPC deals this year. As for the possible CapEx and possible returns across these scenarios, you can picture it as a spectrum, and they aren't truly mutually exclusive — you begin at the lowest CapEx end, which is simply powered land, where CapEx needs are fairly modest and you can get a reasonably decent <<inaudible>> the end-customer lined up to begin work on a powered shell. Past that, you have full build-to-suit. So really, you have a range of options. The way we see it, we'd begin with powered land, and building on powered land could get underway before the deal is even signed, and that would help move a deal forward with a hyperscaler client we might work with.
Mike Colonnese
analystUnderstood. That's really useful, Ben. Thanks for that. Now, regarding the Bitcoin mining operation, I recall you all set out the 21 exahash goal a year ago. I'm just wondering when you think you'll get there? You said 18.6 is what's running right now. And beyond that, is there a chance — or is there a market condition where you might grow past that figure? I know your team is heavily focused on building out the power assets and infrastructure. I'm just wondering whether, hypothetically, if Bitcoin and hashprices really climbed sharply, you'd be willing to push past 21?
Ben Gagnon
executiveYeah, fair question; we've made substantial strides on our hashrate, particularly during this quarter. As of yesterday we stand at 18.6, and that figure keeps climbing. We anticipate further gains in our operational hashrate across the second quarter. The substantial distance between our current position and 21 exahash mostly stems from minor repairs, the RMAs, and the upgrades that have been underway. We signed a modest upgrade agreement recently; roughly 4,000 miners are being upgraded, and that should wrap up in the second quarter. So really it comes down to when the RMAs finish and when those upgrades conclude, which will let us drive that figure as near to 21 as we can. On the subject of buying miners down the road, as I mentioned during the call, we currently have no intention of purchasing additional miners; we're quite pleased and assured by the fleet we currently possess. We believe it sets us up nicely for 2025 and 2026. There are possibilities for us to potentially grow our exahash under management. Should other firms or clients want to fund the miners via hosting, and we can secure, in my view, stronger returns on investment with prospective hosting clients in Bitcoin mining. However, our priority is placing capital into <<inaudible>> longer — those stickier, long-term assets such as the energy infrastructure and the HPC infrastructure. And we simply believe that represents a superior use of capital for 2025 and 2026.
Mike Colonnese
analystExcellent. I appreciate you answering my questions, Ben.
Ben Gagnon
executiveI appreciate it, Mike.
Mike Grondahl
analystHi, thanks everyone. Ben, there was a comment you made during your prepared remarks, and I'd like to confirm I understood it correctly. Regarding those sites in Pennsylvania, I believe you mentioned that 142 megawatts are available right now, and that clarity from FERC was still needed for the rest, sometime within the next 12 to 36 months. Is that right — those 142 are usable as of today at all three of those locations?
Ben Gagnon
executiveSure, let me go into that with a bit more detail. Today, we have 142 megawatts of active data center capacity spanning Panther Creek and Scrubgrass. That 142 megawatts is capable of being supplied, or energized, either through the power plants or through the grid. We make that call ourselves — whichever option costs less is the one we go with, and we're able to alternate between them whenever it becomes needed over time. Growth past 142 really hinges on two factors. First, putting more money into data center infrastructure, which would let us use, or power, beyond 142 megawatts of compute at those two locations. Additional power exists at both of those sites for expanding data center compute during 2025 and 2026, and reaching 500 megawatts before this year ends is included in the plans — that involves building out extra power and capacity specifically at the Panther Creek location. Regulatory approvals enter the picture around a setup in which the grid connection serves as the main power supply for the data centers while the power plants act as a backup power supply. This is the kind of thing moving through the regulatory approval process at many large scale data centers. Amazon and Microsoft, I believe, are the major players pushing this effort forward with FERC. That's roughly the situation there concerning regulatory approval processes for operating both at the same time. As for the six power applications, that involves less of a regulatory approval process and more of a routine applications process. Power applications along with these large interconnection agreements require time to move through the system, and a bureaucracy exists there that simply takes time. So the quickest timeline we could anticipate — for any of these applications to get approved and shift from the megawatt pipeline into the megawatts under development — would be roughly 12 months. At the far end, for all six applications at full scale, it's roughly 36 months.
Mike Grondahl
analystUnderstood. Thanks. You brought up a feasibility study for Q2 as well. My assumption is that this concerned different locations — not Panther Creek, Scrubgrass, and Sharon — but could you shed some light on that as well?
Ben Gagnon
executiveSure. We have brought on our two strategic advisors, and they are assisting us in carrying out feasibility assessments at every one of our sites in North America. Their initial focus was the Pennsylvania locations — Panther Creek, Scrubgrass, and Sharon — yet Washington and our Quebec portfolio are also being covered. So during Q2, we anticipate getting all of those reports covering every site from both partners. That will truly be an essential milestone and step for us as we push our HPC and AI strategy ahead, since at that point we ought to possess the complete set of information needed to proceed more aggressively.
Mike Grondahl
analystGot it. Okay, great. Thanks, guys.
Ben Gagnon
executiveThanks, Mike.
Brian Kinstlinger
analystHello, excellent. I appreciate the thorough information regarding the updated approach to deploying capital; now that the important personnel are onboard, and perhaps I overlooked this, could you give us an update regarding the high-performance computing trial initiatives you mentioned back in November, along with the anticipated schedules for those endeavors?
Ben Gagnon
executiveWell, indeed, that's a solid inquiry. We have not issued anything publicly concerning the HPC trial; the explanation for that stems from having a single prospective client who showed significant interest in a modest pilot effort sized between 1 megawatt and 2 megawatts, especially at the facilities we operate in Washington. Furthermore, that trial initiative would have been mostly propelled by the requirements of that particular client. As we continued those discussions, the magnitude of what they wanted and their level of interest shifted away from something resembling a trial initiative toward the possibility of an entire site. Consequently, the scope grew from roughly 1 megawatts to 2 megawatts up to perhaps 8 megawatts to 15 megawatts of possible capacity. However, it requires — it will require additional time to determine whether that represents a workable option for those locations and whether they possess the necessary funding on their side to proceed. Thus, at this moment, we lack any schedule or any blueprint concerning the trial and when it might be constructed or brought online, and our attention and our financial resources will be directed toward what you might call the powered land and the — likely the powered shell opportunity at the sites here in Pennsylvania.
Brian Kinstlinger
analystThanks, Ben.
Nick Giles
analystHi, thanks, operator. Morning, everyone. Ben, you mentioned that hyperscalers take longer with due diligence. Could you elaborate a bit on what customers prefer? Should hyperscalers be viewed as the very top tier? And would that mean a greater need for the build-to-suit approach? That's where I'd like to begin.
Ben Gagnon
executiveSure, it really comes down to each hyperscaler individually. Some of them have a strong preference for build-to-suit. Others would rather take powered land and handle everything on their own. It all hinges on the particular hyperscaler and what their strategy is. That said, my sense is that going with a hyperscaler tends to be the better route. Dealing with a client that isn't a hyperscaler involves something of a trade-off — chances are you'd be able to capture better margins, yet the credit quality of that counterparty would be weaker. Financing a project whose tenant isn't a hyperscaler means your cost of capital is going to run higher. So if you weigh the margin benefit against the cost-of-capital penalty on a project of that sort, my view is that the blended, all-in number comes out in favor of the hyperscalers rather than some other counterparty — though it truly depends on the particular site, the particular deal, and the particular counterparty. Because of that, making any kind of definitive statement in either direction is difficult. Broadly speaking, when the customer is a hyperscaler, both their stronger credit profile and the cheaper funding available for backing their infrastructure tend to translate into improved returns and greater shareholder value.
Nick Giles
analystThanks for that. You mentioned there are no significant capital expenditure plans for Bitcoin mining in 2025, yet your team has historically made some well-timed miner acquisitions. So, if machines were available at a reduced price, might you take advantage of that, or should we assume that possibility is no longer being considered?
Ben Gagnon
executiveYes, that is a very good question. Our method for acquiring miners is, I believe, quite distinct from how much of the industry operates. Growth purely for its own sake has never been our focus; we have always concentrated on returns from invested capital and on securing a stronger outcome for shareholders by avoiding the priciest or most efficient miners and instead targeting those where we can obtain a slight advantage and improved returns. As for current miner pricing, we have yet to observe any real correction at all across roughly the last 15 to 18 months, with prices holding steady while Bitcoin has risen and fallen and mining profitability has shifted around. Should the economics shift, that is definitely something we would—we might consider. However, we do not anticipate that occurring, and we continue to believe that throughout 2025 and 2026, our fleet remains strongly positioned in terms of efficiency and cost. We anticipate that the Bitcoin price and the trajectory of network hashrate growth will mean those sites produce solid margins and free cash flow for a considerable period. Therefore, we will face no financial strain to update the fleet; instead, we will simply concentrate on maximizing fleet performance, operating as effectively as possible, and reaching those diversification beyond Bitcoin goals we have set out.
Nick Giles
analystI genuinely value the detail you provided today. So, to you and everyone on the team, continue the strong performance.
Ben Gagnon
executiveI appreciate that.
Jeffrey Lucas
executiveThank you, Nick.
Bill Papanastasiou
analystMorning, and congratulations on everything you've accomplished lately. To kick things off, could you maybe walk us through what terms you anticipate locking in from AI/HPC hosting deals, and perhaps compare those with what some of your competitors have agreed to? There seems to be a great deal of uncertainty in the marketplace right now. And from what you've heard in your conversations with these counterparties, I'm wondering whether you expect any significant shifts in economics or demand in light of the recent news stories. Thanks.
Ben Gagnon
executiveYeah. Appreciate that, Bill. It doesn't surprise me that investors feel somewhat unclear, since not many figures have been put out there during the past few months. My view — or rather our stance — is that the typical core scientific quarterly agreements probably won't happen again. Particularly when you consider possible hyperscaler clients, the way deals get structured can differ enormously depending on how you wish to position yourself, or how the hyperscaler chooses to position itself. Triple-net leases, in my view, are fairly standard arrangements and quite appealing arrangements from where we sit, given our desire to concentrate on infrastructure and energy components. However, it's somewhat early and premature for us to give any kind of details regarding what those economics might look like, beyond saying that thanks to the cheap energy and the size of our footprint in Pennsylvania, plus the different geographic and infrastructure characteristics of those 3 sites, interest in those sites is plentiful. And I believe if you examine how this industry has truly operated, many sites are under development, yet there's also a quite solid proportion of sites getting leased out. The market appears not overheated whatsoever on the infrastructure front, at least according to what we've heard from numerous strategic advisors; it looks like a highly healthy and strong market; and provided you have a solid site and can build out the infrastructure for it promptly, chances are — chances are you'll be able to secure a tenant for that site within the coming 1 or 2 years. That appears to be the broad agreement on the market's current state. I'm aware the market grew somewhat worried about Microsoft's remarks, but honestly, I consider that to be a single participant among numerous others, and the actual opportunity in HPC and AI infrastructure hasn't decelerated whatsoever.
Bill Papanastasiou
analystThanks for that explanation. Regarding my second question, clearly there's been a change in where the company is focusing, moving toward the North American portfolio with intentions to build out energy and HPC infrastructure. Maybe you could address what's left in the South American portfolio. Could there be more divestment there to help finance expansion in Pennsylvania?
Ben Gagnon
executiveYeah, so the sites we operate in Latin America are currently operational. Those are profitable locations producing free cash flow. The situation with our Yguazu site was somewhat different, correct, since it was not operational and wasn't producing free cash flow. Miners had not yet been secured for it. Consequently, significant expenses were involved in getting miners under contract and developing that location to its full 200 megawatts. That represents a very different scenario compared to maintaining an online site that is profitable and produces free cash flow. My view is that we hold no unhealthy emotional ties to any specific site. If the economics made a strong case, we would clearly evaluate it and consider every opportunity to generate shareholder value that presents itself. However, evaluating an operating site that produces free cash flow is a somewhat different category than evaluating one that isn't operating and carried substantial expenses related to getting it operational.
Brian Dobson
analystHi, I really appreciate you giving me the chance to ask something. From where we sit, people mining Bitcoin bring great know-how to HPC work. Still, when you're in conversations with prospective customers, how are you presenting that — and what kind of response are you getting, Ben, regarding what this company has done before?
Ben Gagnon
executiveYeah, that's a fair question. Look, if you're in Bitcoin mining, you're accustomed to getting deals done fast and with real aggression. You operate opportunistically. But HPC is an entirely different world. Folks put in far more work, far more hours, and conduct far deeper due diligence prior to signing off on anything. That thoroughness matters a great deal, since these projects demand way more capital than mining Bitcoin does. During 2024, roughly speaking, getting a megawatt of miners plus infrastructure up and running cost us around $1 million per megawatt, while with HPC and AI, the figure likely lands somewhere from $30 million to $40 million, all depending on which GPUs, servers, and other gear you decide to run. Given that kind of capital demand, you obviously need a tougher review process. My sense is that if you walk into these talks lacking proper resources on hand, lacking expertise, things can easily stall out, and prospective hyperscalers may simply quit returning your calls. That's exactly why bringing in the right strategic advisers matters so much for us, along with hiring the right talent in-house to oversee these efforts and put us on solid ground when facing possible HPC clients. Thus far, things have gone quite smoothly with our strategic advisers and our team. They're closing the knowledge gaps and getting us educated and up to speed fast regarding what actions to take, what lessons to absorb, and the way we can bring our strengths as a Bitcoin miner into this fresh sector—HPC and AI—achieving maximum efficiency and the best possible result.
Brian Dobson
analystGreat. Thanks very much.
Ben Gagnon
executiveThanks, Brian.
Ben Gagnon
executiveAll right, and thanks to each of you for being here today. I want to emphasize once more just how important the strategic actions we've taken during the past few months really are. In almost every respect, we've quickly reshaped this business, and today we are a US-centered energy and compute firm built on a solid Bitcoin mining operation, with compelling opportunities to grow into HPC and AI across 2025 and afterward. We're eager to continue sharing updates on how things are going. Thanks so much.
Operator
operatorAppreciate it. That wraps up our call. We're grateful you joined us. You're free to hang up at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Keel Infrastructure Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Keel Infrastructure Corp. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Keel Infrastructure Corp. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.