Thank you, gentlemen. I appreciate everyone holding on, and welcome to the conference call covering NKT's Q2 Report 2020. Right now, every participant is in listen-only mode. Following the speaker presentation, a question-and-answer session will take place. If you'd like to ask a question during that session, you'll need to press star one on your telephone. Please be advised that this conference is being recorded today, Wednesday, the 19th of August, 2020. I'd now like to hand the conference over to today's first speaker, Alexander Kara. Please go ahead.

Alexander Kara

executive
#2

Okay, good morning, everyone. I appreciate you taking the time to listen to our Q2 report for NKT. Here in the room with me is Line Andrea Fandrup, my new CFO, who joined just a few days ago on the 10th of August, and in a few minutes she'll say a little about herself. Also here we have Basil Garabet, President and CEO of NKT Photonics, and Michael Nass Nielsen, Head of Investor Relations, who will handle the financial questions today since Line only came on a few days ago — and I'm glad she's here, it's good that she's here. With that, I'll hand over to her so she can share a few words about herself.

Line Andrea Fandrup

executive
#3

Thanks, Alex, and good morning to everyone joining us on the call and listening in. It's a real thrill for me to be here. Today is officially day eight on the job for me, so I'm completely new to NKT. Many of you, I'm sure, have read a bit about my background, but in any case, here's the short version: my career has spanned international companies in a range of businesses. I've been involved in shipping, in biotech, in innovation pipelines, in production, in professional services, and in large projects around the world, and most recently I was with Rockwool, a capital-intensive industry, covering its entire production chain. So I was glad when NKT came to me, having listened into the business here and the various pillars we have. Much of it closely resembles what I've done up to now. I have to say the first days in this job have left me encouraged, and I'm also very encouraged by the wins over the spring and summer. I'm happy to be aboard and to be working with Alex and the rest of the team. Thank you.

Alexander Kara

executive
#4

All right, thank you, Line. Moving on to the quarter's highlights: I'd describe quarter two as satisfactory and matching what we expected, though I have to say applications came in above our expectations. So overall, revenue growth was good — 15% organic growth, backed by every business line, which I think is a nice achievement — and 16 million EUR of operational EBITDA is satisfactory. On top of that, we landed a solid series of good orders. Our order backlog grew from roughly 1.2 billion EUR at the close of Q2 to approximately 2.7 billion EUR. That's more than doubling the backlog, thanks to some major wins, and I'll get to those shortly. I think that's a big achievement. Moving to the next slide now, here are the first two orders, SüdOstLink and SüdLink, which form part of the German corridor project. I think it's excellent that NKT can take part in a German energy venture, and as a German citizen I'm proud that we can carry on with — or take part in — this great project. Reaching that point was a big achievement and required hard work. We also succeeded in Greece with the Attica-Crete project, the interconnector linking the Greek mainland to Crete, where we are involved.

Alexander Kara

executive
#5

Following Q2, we secured additional orders for Shetland — interconnectors running from the Shetland mainland to Shetland — worth roughly EUR 235 million, DC extruded cable, and then quite recently from TenneT's BorWin5 for offshore wind, which comes in below EUR 250 million. That was also a pleasant beginning to Q3. Turning to the solution side, we saw solid growth of 21% there, organic growth, with projects executed well overall, and we wrapped up two AC projects: Gina Krog, an AC project linking two platforms for Equinor, and then Öresund, an AC cable connecting Denmark and Sweden. On both of those, the NKT Victoria was used to lay the cable, and beyond that, we also deployed the Victoria on a repair job for the Baltic Cable. Moving on, I'd say the first half of 2020 was overall a strong year for the cable industry, which benefits every cable manufacturer, with more than EUR five billion in orders awarded, and we captured our fair share at EUR 1.6 billion — the three projects I referenced earlier — followed by close to EUR 500 million with BorWin5 and Shetland. I'd call that a great achievement.

Alexander Kara

executive
#6

Our teams remain occupied with multiple tenders across various market segments and geographies. The tender activity, in fact, hasn't decelerated because of the coronavirus pandemic. It's perhaps just somewhat harder to handle everything with Skype and Teams and whatever other meeting tools you can think of, but apart from that it functions fine. The medium- and long-term outlook therefore stays appealing, so nothing has shifted versus the prior quarter. Turning to the backlog, you can see how it's distributed — an all-time high of EUR 2.7 billion at the end of Q2, and by the end of Q3 we'll be above EUR 3 billion thanks to the Shetland and BorWin5 orders recently received. We're active across every segment — offshore wind, interconnectors, oil and gas — and with these new orders, we keep working on it. Moving to applications, as I said at the very start, applications came in above our expectation. 10% organic growth, I believe, is a remarkable achievement given these unpredictable corona pandemic times, so we've witnessed solid growth in Germany, Netherlands, Eastern Europe, but also in some countries that were tougher, such as U.K and France, which were closed, though others made up for that.

Alexander Kara

executive
#7

Revenues came in high, growth was solid, and earnings were good, so the steps we've taken on productivity and product mix are delivering results, and we also landed some attractive medium voltage frame contracts during Q2. In addition, I've brought in a new head of applications, Will Hendrikx, who brings a strong track record in the cable industry, and we'll keep moving forward on a good path with applications. Turning to service and accessories: accessories is progressing nicely, especially on the medium voltage side, and we're delivering across the various countries, including in the Middle East. Service also had a good quarter, though it was slightly lower against a tough comparison from last year. During the quarter, we repaired the Baltic Cable very quickly in 29 days, which of course matters because power needs to flow again as fast as possible. And here too, I've hired a new head of accessories, Fredrik Eskengren. So all in all, we're on a good track with growth, revenues, and orders. I'd wrap up then before handing over to Michael. I'd say we're on the way up. With that, I'll hand over to Basil, sorry, and he'll now give you insight into Photonics.

Basil Garabet

executive
#8

Thank you, Alex. Good morning. I want to extend a welcome to Line too — a great addition to the team. For us, Q2 was a quarter shaped strongly by COVID. Revenue landed at EUR 14.6 million, down from the EUR 17.9 million recorded in the same quarter of 2019. Once again, the primary impact fell on the industrial segment of our business. Organic growth stands at -20%, again chiefly caused by the effect on the industrial segment. That said, our medical and life sciences business and our aerospace and defense business both delivered satisfactory growth — in fact, very positive growth in both segments. EBITDA was -EUR 0.8 million, down from EUR 3.9 million in the same quarter of 2019, primarily because of the lower revenue. Ours is very much a high-margin business, so when revenue falls, EBITDA falls with it. Order intake this quarter, again hit hard by COVID, came in at -26%, largely because of the high intake in the same quarter of 2019, which was lifted by large aerospace and defense projects. Even so, orders in medical and life sciences and in industrial were actually on par with what we achieved in 2019.

Basil Garabet

executive
#9

The industrial segment is still our biggest business, making up 70% of revenue, and as I said earlier, it's been hit hard. Not every part of the industrial side has taken a hit, but some are at a very low level right now. We are seeing improvements come through, and have been since June onwards, but that quarter was affected because of this. Given these consequences, NKT Photonics has put several measures in place to keep costs down. Still, the company does prioritize growth at this stage. We remain in a growth industry, and most of what we're doing is there to enable that growth in the markets we serve. Let's go back to the next slide on business development. In medical and life sciences, which accounts for 15% of revenue, revenues grew satisfactorily, and the main growth drivers were on our bioimaging and microscopy side, as well as ophthalmology. We manufacture lasers for cataract operations and other ophthalmology applications. In industrial, which makes up 70% of revenue, we've been facing headwinds, and the coronavirus pandemic did make that worse. We're working with a number of customers to support future growth, and we see that turning around, particularly in areas such as Asia, turning around from the effects of the pandemic.

Basil Garabet

executive
#10

In aerospace and defense, things are going really well. We're securing new contracts. Revenue and order intake are both improving dramatically in those areas, and we view that as a future performer on revenue and EBITDA that will help us move forward. With that, since I've finished my segment, I'll hand things over to Michael.

Michael Nass Nielsen

executive
#11

Thanks a lot, Basil, and I'd like to extend a welcome to everyone joining the call as well. As Alexander said at the outset, I'll be handling the financial part today, since Line has only been with us for eight working days, and I give you my word that she'll be prepared to give the presentation when we get together here again in November. Let's begin on slide 18, which shows a bridge of how revenue evolved in Q2. Revenue was pushed higher by the way NKT developed. The organic growth contribution of 15% far more than offset the headwinds we experienced at NKT Photonics in the quarter. Those really were the main events, while currency effects in the quarter itself were comparatively material. So let's go to the following slide, where we'll look a little at the other P&L line items. As I said earlier, revenue was lifted by NKT. That also produced an improvement in our operational EBITDA, with NKT's growth meaning our operational EBITDA for the group came in at EUR 15.2 million, which was essentially EUR 2 million above the same quarter a year ago. Moving further down the P&L, we can see an increase in one of the items versus last year.

Michael Nass Nielsen

executive
#12

Most of that rise comes from costs tied to the power cable matter you're likely aware of. NKT was fined by the European Commission back in 2014 for allegedly participating in price-fixing in the high-voltage market. At the time, NKT disagreed with that conclusion, and it still does. We have appealed that decision several times. In fact, earlier this year, we also partly got a ruling in our favor, meaning the fine from back then ended up slightly lower than the original amount set in 2014. Even so, customer claims connected to this matter remain, so we have booked provisions of roughly EUR 8 million for it. Given how we currently assess this case, we think we have provisioned the amount required to cover its cost. Moving down to the net result, it is somewhat higher than last year but still negative, and there we have seen, among other things, a favorable development in financial items thanks to some FX gains in the quarter. Turning to slide 20, this is our customary slide on how operational EBITDA for the group has developed, and you can see we are beginning to trend upward again following the 2019 development, so Q2 shows we are on the right path and are steadily starting to improve our EBITDA margin once more.

Michael Nass Nielsen

executive
#13

Now I'll turn to slide 21, which covers the balance sheet highlights, and the first thing I want to look at is working capital. If we compare with the close of last quarter, so the end of Q1, our working capital has gone up. That rise is mainly tied to how the power cables business has developed. I'll return to that on the following slide and explain what drove that development. In Photonics, we're slightly up, essentially just because of a receivable on corporate tax. Other than that, the remaining working capital items were roughly in line with the end of Q1. With earnings having improved, we're also seeing RoCE tick up a bit relative to the past couple of quarters, and obviously we intend to keep that traction going in the years ahead. Last, on the bottom line of the table, you'll notice that total equity is higher, which is obviously down to the new shares we issued in Q2, when we placed almost 5 million new shares in the market through the direct placement at that time, which gave us net proceeds of just around EUR 90 million.

Michael Nass Nielsen

executive
#14

Now let's move on to slide 22, which gives a little more detail on how working capital developed in the power cables business. As I said, it's up from Q1 and also up from Q4 of last year, when — as we mentioned at the time — the level was unusually low. Just like in the prior quarter, we clearly rely heavily on milestone payments in our biggest division, meaning the solutions business. And there, the inflow of funds from milestone payments tied to projects we've taken in has been relatively low. So in that sense, the phasing between Q2 and what we'll see in Q3 has been unfavorable. As a result, we anticipate some kind of reversal in working capital in solutions as we go into Q3. In applications, our working capital level has improved somewhat versus the end of Q1, driven mainly by a favorable trend in our trade payables. When it comes to the service and accessories business, there isn't much to note there — it's largely in line with Q1. So taking it all together, we expect the working capital position to get better during 2020. Let's turn to slide 23, which gives an overview of the cash flow statement. Certain parts of it are affected by some of the matters I just referred to.

Michael Nass Nielsen

executive
#15

Working capital movement, then, more than offset the quarter's positive EBITDA. As a result, cash flow from operating activities came in negative at roughly EUR 12 million. Turning to investments, group CapEx was at a comparable level, about EUR 21 million, much like what we recorded in Q2 2019. Back in 2019, we likewise had a modest cash outflow tied to the Onefive acquisition within our Photonics business. On the CapEx line, I'd add that a couple of months ago we announced plans to expand capacity in the solutions business. Essentially, we're carrying out an investment program worth EUR 150 million across the coming years — running from this year through 2022 — as we position ourselves to deliver on the sizable backlog secured over recent months, and to get ready for orders we anticipate arriving in the years ahead, which we still expect to materialize given tender activity, as Alexander noted earlier, and also in light of what we're seeing at the public level supporting green energy transition investments, not only in Europe but essentially beyond Europe as well.

Michael Nass Nielsen

executive
#16

Now let's turn to slide 24, which gives you an overview of where we stand on debt and what our leverage ratio looks like. During the quarter, we're bringing our net interest-bearing debt down by slightly over EUR 50 million. What's mainly behind that move is the new share issuance I referred to earlier, which generated roughly EUR 9 million in proceeds for us in the quarter. We also noted back in May, at the time we launched the first equity issue, that we plan to issue additional shares. Those will carry preemptive rights for existing shareholders, and we still expect them to be issued before the end of 2020. We won't provide any further detail on that today, and we promise we'll clearly return to the market once we have more information to share on that front. Our net interest-bearing debt is made up mainly of our mortgage debt plus the draw we've taken on the revolving credit facility, where the draw net of the cash we hold at the bank stood at EUR 121 million as we exited Q2 under the revolving credit facility, which has total availability of EUR 300 million.

Michael Nass Nielsen

executive
#17

Overall, this gives us the financial flexibility required to handle the activity level we anticipate in 2020. And on this final slide, slide 25, I'll go over the financial outlook for both businesses briefly. Essentially, we are reaffirming what we communicated back in May. For the power cables business, revenue is still expected to come in between EUR 1 billion and EUR 1.1 billion at standard metal prices, and operational EBITDA should land between EUR 40 million and EUR 60 million. In the Photonics business, our guidance remains withdrawn. Given the developments we've observed during the first half of the year, we don't believe the guidance we issued at the start of the year can be achieved. And we've decided to keep it withdrawn at this point, in light of the significant uncertainties we see, particularly those tied to our largest segment, the industrial segment, and also because the biggest quarters of the year still lie ahead of us, especially Q4. So I think those were the main messages from our side, and we'll now move on to Q&A.

Michael Nass Nielsen

executive
#18

Operator, you can proceed.

Operator

operator
#19

Thank you. Should you want to pose a question, kindly press star and one on your phone's keypad, then wait until your name is called. To withdraw your request, press the hash key. I'll repeat that: to submit a question, press star and one and hold until we announce your name. Our first question is from Artem Tokarenko at Credit Suisse. Please go ahead with your question.

Artem Tokarenko

analyst
#20

Morning, and thanks a lot for taking my questions. First one relates to the equity raise plan for the second half. I appreciate that you said, Michael, there’d be no further color on that, but I just wanted to check something. When it comes to the size, given that you want so many projects in H2 along with all the prepayments tied to them, is there now scope for you to reduce the overall size of that second tranche?

Alexander Kara

executive
#21

Yes. I mean, I can add a little something on that. We're right in the middle of the process and examining it, and it's genuinely too early to draw a conclusion. We're in the process and looking at what we want to do, and it isn't defined yet. So we're working on it, and we really will come forward with details as soon as we're ready. So there's nothing more to say at this point in time, really.

Artem Tokarenko

analyst
#22

All right, thanks. My second question concerns the solutions backlog and Slide 11, where you indicate EUR 464 million of revenue is secured for 2021 in solutions. I suppose that compares with roughly EUR 700 million of revenue at full utilization of your plan. So looking ahead to next year, could you perhaps give us some color on whether you can pull any of the projects in the backlog forward to get nearer to that EUR 700 million revenue? And if not, what other projects are out there in the market that could contribute materially to next year's revenue?

Alexander Kara

executive
#23

I mean, now that the project has been awarded, and with the orders we received in Karlskrona over the last two months, visibility has improved for us, and those will make a partial contribution in 2021. But as you may have seen, we have recognized all the projects that have been awarded, where DC projects, and ideally, you seek the optimal mix in the factory since you have different production lines. So that means a 3C, AC cable, DC, or MI, and this is the best optimal mix. You need an order backlog to execute across all these lines. So we still have capacity for 2021 and beyond. But as I said, we now have better visibility where we are.

Artem Tokarenko

analyst
#24

To expand on that a bit—if I’ve got the math right, I believe that with the new projects, your revenue next year is still roughly around EUR 500 million. So, to restate my question, is there any room for you to accelerate the projects in the backlog, or is that not something you can do?

Alexander Kara

executive
#25

No. What I mean is, when you look at the project, you've got what you have, and you try to carry them out according to plan. On top of that, you keep that in line with the payment as agreed upon with the customer. There's a certain amount of flexibility in what you call backlog, though it comes with limits. Since if you do build backlog, you also need storage space in the factory, which you might need for other things. You do have a few options to push some backlog forward, but only within limits.

Artem Tokarenko

analyst
#26

All right, thanks a lot. My final question concerns Photonics. Clearly, the PE valuation has returned to where it stood before COVID, so does that give you enough comfort to revisit looking at a possible disposal process, or given what's happening in the underlying markets, would you prefer to hold that until next year or perhaps even further out?

Basil Garabet

executive
#27

Our strategic review of Photonics is still underway, and we haven't reached any conclusion yet. As you can probably imagine, we're putting a lot of effort into tactical matters around day-to-day operations. Looking ahead, the outlook appears more favorable for us. In fact, our backlog is the largest it has ever been. That said, the markets we operate in are highly uncertain right now. A few are doing well. A few are entirely down. So concluding the strategic review at this point makes no sense.

Artem Tokarenko

analyst
#28

All right. Thanks so much.

Operator

operator
#29

Our next question is from Claus Almer at Nordea. Claus, go ahead with your question.

Claus Almer

analyst
#30

Thanks. Yeah, I've got a few questions of my own as well. First one's about the pipeline in the cable division. In terms of both large orders or projects and mid-size orders, how are you seeing progress, and what about pricing too? That's my first question.

Alexander Kara

executive
#31

I mean, what we've observed with the recent awards is that they were mostly large orders, and of course there's a trend toward bigger, larger orders with this interconnect connector. These are huge projects, and I think there's still a project in the pipeline to come, and where we're working on the different segments. So still, the outlook is positive. But Claus, what do you want to know here?

Claus Almer

analyst
#32

To the greatest extent we can, clearly, but.

Alexander Kara

executive
#33

Yes, I'm aware of that. It's a very particular question, and you're after an answer. That's right. Indeed, I do.

Claus Almer

analyst
#34

To start with, what's your view on the order pipeline for signings in 2020, and how much of it lands in 2021? Is a EUR 5 billion order market achievable in 2020, matching what we saw this year?

Alexander Kara

executive
#35

So I don't have that list right in front of me at the moment, but what I'd say is there are still projects being awarded in the second half. And on timing, there's some uncertainty as well. So it's possible that the decision on an award gets made this year, yet the award itself lands next year. So there are still some projects out there in the market that have yet to be awarded.

Claus Almer

analyst
#36

All right, then.

Alexander Kara

executive
#37

Just like on the market list.

Claus Almer

analyst
#38

Okay, on the pricing side, at least what we've observed historically is that when utilization rises and backlogs increase across everyone competing in the industry, that tends to be a healthy backdrop for pricing. So how do you expect that to unfold right now?

Alexander Kara

executive
#39

I'd say the positive side is what I mentioned: EUR 5 billion during the first half. That's beneficial for the cable sector, for our company, but equally for rivals and peers, and it will push utilization industries forward and, in turn, assuming the economy follows, let's say, standard rules, that should lead to increased prices.

Claus Almer

analyst
#40

Alright, so my next question is for the Applications division, and first off, congrats on how the quarter went. For years, I suppose, that division had been delivering disappointing results. So do you see this as a new, more sustainable level now, or were there certain Q2-specific factors that lifted the performance?

Alexander Kara

executive
#41

No, it isn’t that specific. What I mean is, we had a solid Q1 — EUR 3.5 million — and now we’re at EUR 5.5. We’re seeing results from the actions we’ve taken, and I’ve got a seasoned senior cable manager who spent a long time in this industry, and our expectation is that we’ll keep going on this journey.

Claus Almer

analyst
#42

All right, and finally, Line, welcome aboard. We’re eager for your presentation in Q3. That’s everything from me.

Alexander Kara

executive
#43

Thank you.

Operator

operator
#44

The next question is from Kristian Tornøe Johansen at Danske Bank. Go ahead with your question.

Kristian Johansen

analyst
#45

Yes, thanks. My first question also concerns the project pipeline. Clearly, order intake on NKT's DC projects has been very strong, yet the report also notes that AC project awards have fallen short of expectations. So perhaps you could elaborate: have any particular projects in the AC segment been delayed, and how does the near-term AC pipeline look as well?

Alexander Kara

executive
#46

So what that means is, since the turbines are bigger and sit farther out at sea, DC becomes the natural economic and technical answer. We saw this on the last HVDC project where we did well — it was almost entirely DC, and things are shifting that way. AC projects still exist in the market, though only a handful. Part of it is technology too: in the past, wind turbines had an AC platform before going to DC via an export cable. These days you go from a turbine at 66 kV straight to the DC platform. So some AC volume essentially disappears and shifts to the array cable, as with BorWin5. Five, six years ago, you'd have had a 138 kV AC voltage cable. The upside is the move toward DC at the higher end, which benefits manufacturers active in that field. But naturally it's also good to have that AC so the mix stays optimal. That holds for us, and I'd guess for others in the market as well. There are some opportunities out there, but let's not get too specific here.

Kristian Johansen

analyst
#47

All right, so let me make sure I understand — the AC awards coming in below expectations isn't tied to particular projects slipping, is it? What you're describing is a shift in technology, moving from AC over to DC. That's the point you're making.

Alexander Kara

executive
#48

It's definitely more of a technology shift in offshore wind, and there may still be AC if you're closer to shore or, let's say, for connection from land to islands. If they're close to shore, there's simply a technical limit on how far you can go with AC because of the reactive power that's needed or generated.

Kristian Johansen

analyst
#49

Alright, so my second question concerns applications — medium voltage in particular, where you appear to be building real momentum. Could you give us more detail on the facility in Denmark and on whether we should expect that strength to carry on at the same pace we saw during the first half?

Alexander Kara

executive
#50

So, as we mentioned, we've gotten some orders under that medium voltage frame agreement. Depending on what the customer needs, this frame agreement can be called off, and we're seeing somewhat stronger demand there. Like I said during the presentation, especially in the Dutch region, Germany, the Netherlands, or Eastern Europe, visibility outside the frame agreement and the call-off is, let's say, limited, since this isn't a long-cycle business the way solutions is. It really hinges somewhat on how the market evolves and how investments get made.

Kristian Johansen

analyst
#51

All right, got it. Good. That's everything from my side. Thanks.

Operator

operator
#52

To ask a question again, please press star and one on your telephone keypad. Our next question is from Akash Gupta of JPMorgan.

Akash Gupta

analyst
#53

Okay, hello and good morning, everyone. I’ve got a few questions too. First one is about the capital increase. I realize you won’t go into the fine details on that, but I was hoping for some high-level perspective. Basically, if I compare NKT with the two big European peers, your mix is weighted heavily toward solution business, which means the proportion of project business or turnkey projects is significantly larger at NKT than at those peers, and we can also observe that in working capital, where you sometimes run negative working capital, meaning there’s no need for heavy leverage on the balance sheet. And to return to the capital increase point, obviously there are multiple moving pieces when it comes to securing down payments on these projects, a possible divestment of Photonics since peers have re-rated. I just wanted to ask whether you can offer any comments on the kind of balance sheet you’re aiming for as an outcome of this capital increase process, because my assumption is that this would be your final chance to request additional funds from shareholders.

Michael Nass Nielsen

executive
#54

Michael here. I believe we've laid out a target leverage structure for the company of 1.5 times debt to EBITDA. That clearly remains in place. We haven't specified an exact timeline for when we expect to reach it. So no specific date has been communicated on that. Beyond that, it is what we're aiming for. But I think you're correct that we also noted during the first equity increase back in May that we currently have a substantial portion of solutions business, and that share will expand further through the investments we're making. As a result, we'll be more reliant on bigger projects involving larger working capital swings and milestone-type items, so to speak. That's another reason we want to fortify ourselves for that, in addition to the fact that we're going to make investments basically to grow as we intend in the years ahead. So I think that's likely as much color as we can offer at this point.

Akash Gupta

analyst
#55

Thank you. My second question concerns margins. Looking at your backlog, could you offer some commentary on how backlog margins compare with pre-2018 levels, when we experienced a lengthy stretch of very weak order activity that affected pricing? And clearly, since that time, there has been a shift in mix, with offshore wind taking a larger portion of backlog than previously, when you had more oil and gas projects plus interconnector in backlog. So how does that mix affect margin? Then, perhaps staying on the same subject, you mentioned before that utilization of all the units, vessel included, is required. So if you could say when we might reach that point of full utilization across all assets — could that be 2021, or would it be more like 2022?

Alexander Kara

executive
#56

On margins, what I'd say is this: the margins we've seen in the project are satisfactory. Broadly speaking, margins on DC projects tend to be better than on AC ones, generally in wind terms. Of course, these large projects carry both opportunities and risks, and you have to manage those; if you manage them well, you may improve. So that's that. And then on the vessel side, with this recent award, Shetland and BorWin5 will add some vessel capacity going forward, which is positive, and I hope that answers your question.

Akash Gupta

analyst
#57

Thanks. My last question is about expanding production. You announced a EUR 150 million investment in the Cologne factory. Will that be only for land-based DC projects, or could this new facility also be used for submarine? And I just wanted to know what the limitations are, given that this factory would sit right beside the Rhine River — can you bring your vessel in, let's say, to use this factory for submarine projects?

Alexander Kara

executive
#58

So, what they mentioned was roughly EUR 150 million. We're going to put money into two plants — Cologne and Karlskrona — and part of the equipment works for both land and sea cable at either site. That gives us some flexibility. Naturally, in Cologne we've got the Rhine River, and the weather isn't something we can control — thank God we can't do that. Still, with barges that have a shallower draft, we can also boost the load out when the Rhine's water levels run low.

Akash Gupta

analyst
#59

I appreciate that.

Operator

operator
#60

Just a quick reminder to ask a question — please press star and one on your telephone keypad. Our next question is from Casper Blom at ABG.

Casper Blom

analyst
#61

Yes, thank you very much. Really, these are mostly follow-ups. Regarding the application where I also chart the rebound and profitability, can you verify that you still essentially maintain a medium-term goal of reaching a 7%-9% EBITDA margin? Second, some housekeeping. Since you caught me somewhat off guard with the provisional one-off in the quarter, might you offer any form of guidance concerning the one-off levels we ought to anticipate in the second half of the year? That is everything from me, really.

Alexander Kara

executive
#62

I think I can take the first question. Look, we communicated 7%-9% for 2017. And as I said earlier on previous calls, we're now focused on making the application business better, and that improvement is happening gradually. So it won't be quick — it won't be a fast one — but we're on a good path. And of course, we're ambitious. We should be ambitious too and work toward being, let's say, equal to our peers. That ought to be our ambition. But we won't hit those levels this year. And I also can't say exactly when we'll get there, but we're working toward being equal to our peers.

Casper Blom

analyst
#63

Appreciate the response. Still, to circle back to what was asked, can you verify that this target remains in place?

Alexander Kara

executive
#64

No. No. Take a look at where our peers stand, and those are the ones we aim for.

Casper Blom

analyst
#65

Alright.

Michael Nass Nielsen

executive
#66

Kjell, on the subject of one-offs for the rest of the year, I'd say that can be fairly brief, since at this point we anticipate just limited one-offs during the second half of the year.

Casper Blom

analyst
#67

So, low single digits, is that right?

Michael Nass Nielsen

executive
#68

Yeah. Yeah.

Casper Blom

analyst
#69

Alright, thanks, Michael.

Operator

operator
#70

The following question is from Artem Tokarenko of Credit Suisse.

Artem Tokarenko

analyst
#71

Thanks so much for taking my follow-up questions. Regarding the applications business, in Q2, could you give us some detail on what portion of the EBITDA improvement came from internal efficiency measures versus simply better revenue mix?

Alexander Kara

executive
#72

I can't be completely certain that I'm right about this. So we did see some profitability gains coming from mix. A larger share of medium-voltage, where demand is stronger and pricing is better, which helps. And on top of that, we've been working on factory efficiency, and that work is ongoing. So those are the two factors, without going into more detail here.

Artem Tokarenko

analyst
#73

Let me try putting it another way. From the stronger orders and medium voltage, I get the impression that part of this stems from you gaining market share during COVID, since some of your competitors can't reach the markets where your share is high. Do you view those share gains as something that will hold up going forward, or should the results from the first two quarters mostly be treated as a one-off tied to this situation?

Alexander Kara

executive
#74

As I see it — and I did note that both the U.K. and France were shut — clearly we haven't taken share in those markets when we weren't able to deliver. Our belief is that share gains did come our way, yet with low voltage, medium voltage, so many customers and so many deliverables, working out market share against the solutions is not such a simple matter. Still, in our view we did pick up market share, and that is something we must defend as we move ahead.

Michael Nass Nielsen

executive
#75

And I think it's worth noting too that these are clients we've partnered with over several years to grow our share with them. So it isn't as though they reached out simply because no one else was available. There's also the matter of our sales team, which has genuinely done an excellent job of locking in these orders across the markets, including before COVID arrived.

Artem Tokarenko

analyst
#76

Thanks so much. My final question goes to Line. Congrats on coming aboard. I'd imagine you might have some thoughts or insight into what your main areas of focus will be over the next six months?

Line Andrea Fandrup

executive
#77

Thanks for the question. Since I'm still fairly new, I should probably give myself some time before I jump to conclusions. But of course, carrying out the big corridor project is a key priority, and it's investment-related here too. So that's what I'm really looking to get further into and understand better, also from a financial angle.

Artem Tokarenko

analyst
#78

Thanks a lot. Appreciate it, everyone.

Operator

operator
#79

Akash Gupta from JPMorgan has the next question.

Akash Gupta

analyst
#80

Yeah, hi. A quick follow-up about working capital. So you mentioned there was some impact, or essentially lower milestone-based payments, in Q2, and you said you expected improvement in Q3 and after that. Just checking, since we're already halfway through Q3, have you gotten some of those milestone-based payments, or do you expect to get them in the rest of Q3?

Michael Nass Nielsen

executive
#81

Regarding Q3 and that month within it, we're not going to comment, but we do feel comfortable saying working capital will improve in Q3.

Akash Gupta

analyst
#82

Thanks, Michael.

Operator

operator
#83

That brings us to the end of the question-and-answer session. Please go ahead.

Alexander Kara

executive
#84

All right, if nothing else is coming in, then many thanks for those great questions and for joining us. We hope everyone has a nice day, and we'll be speaking with you again before long.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete NKT A/S transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to NKT A/S earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in NKT A/S or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.