NKT A/S (NKT) Earnings Call Transcript & Summary
May 19, 2021
Earnings Call Speaker Segments
Operator
operatorHello, and thanks for being with us. Welcome to the NKT Q1 report for 2021. <<operator_script>> Please be aware that today's conference is being recorded, on Wednesday, the 19th of May 2021. At this point I'd like to turn the conference over to today's speaker, Alexander Kara. Over to you.
Alexander Kara
executiveYes. Morning, everyone, and thank you for spending the time to join this Q1 report from NKT. With me here today as a presenter in the room is Line, our CFO; and Basil, the CEO of NKT Photonics. So when we look at the highlights from the first quarter 2021, I think we can say 2021 has gotten off to a satisfactory start. All in all, we saw organic growth of 21% in Cables, and all 3 business lines were part of that 21% positive result. Operational EBITDA nearly tripled compared with the same quarter last year, going from EUR 10 million to EUR 30 million. And we delivered a record-high quarterly performance in Service & Accessories, plus good performance in Solutions, very positive. Worth mentioning too is that we have a good start in Photonics. Photonics is back on the growth path, mainly driven by the industrial segment and the medical and life, and we'll hear more from Basil a little bit later. So it was the highest ever Q1 in revenues in Photonics, which is good to be back here. If you look at the Q1 performance a little bit more in detail.
Alexander Kara
executiveLike I said, earnings and revenues rose across all 3 business lines within Cables, and each one contributed. Over in Solutions, we've got various activities — we make different kinds of cables at our Karlskrona and Cologne plants — and factory utilization was solid. Then, following the month — sorry, once the quarter closed, we were awarded Troll, the top project from Equinor, at EUR 95 million on market price, which is a nice order and notable too since it's an AC order. Moving on to Applications. Our turnaround continues and performance improved, going from EUR 3.5 million last year to EUR 5.5 million, plus organic growth of 2%. Service & Accessories, as I said earlier, had its highest ever quarter, helped by service repair jobs offshore as well as onshore and several other activities. All told, organic growth of 21%. And as you can see on the graph here, revenues grew nicely from EUR 240 million to almost EUR 300 million, driven by the metal price. And operational EBITDA, in round numbers, went from EUR 10 million to EUR 13 million EBITDA. If we turn now to Solutions. During the first quarter, we've executed — worked on various projects.
Alexander Kara
executiveDogger Bank A and B — Dogger Bank is the first DC offshore project in the U.K. We had worked on several other projects there: Moray East in Ostwind, which are three-core AC projects, and Viking, which is an MI project. That's a good mix of execution across different project types. Also, we have finalized Triton Knoll offshore wind farm in the U.K., with deliveries of export cables and inter-array cable; we used NKT Victoria for installation across various activities, and also for service work, such as the repair job for BritNed. So revenues rose to EUR 161 million, 27%, and EBITDA of EUR 19.5 million, or from 4.2% to 12.1% comparing the quarter — last year with this quarter. Looking at the high-voltage market this year, we have been awarded new orders in onshore segments, like the RP frame agreement, plus various variation orders. And as I mentioned after the quarter closed, we were awarded the table for offshore from Equinor, Troll West in Norway, at approximately EUR 95 million, standard market price. Overall, in Q1, roughly EUR 700 million was awarded, and we continue to be active on tenders around the world — meaning we are active in Asia, in Europe, and we're also seeing more and more activity in the U.S.
Alexander Kara
executiveLast year was a strong one for us at NKT, with a project in DC technology. Now we've secured our first order in AC, which is also positive for factory loading and balances out our portfolio. If you look at our backlog — it stands at EUR 2.95 billion, which is very high compared with historical figures. It's down slightly, by EUR 120 million versus the end of 2020, but it remains very high. We're active across all segments: offshore wind, interconnectors in oil and gas. And now we'll add Troll West as power from shore on top of that, and we'll see how the revenue backlog gets executed going forward. Applications — coming to applications, that was also a good start to the year. We're continuing our turnaround activities in applications. And there's one more activity involving distribution that we'd take on: moving the building wires from Asnæs, from Denmark to Poland, and concentrating the building wires in Poland. It's also worth mentioning here that we implemented the ERP system in Eastern Europe at the beginning of the year without any issues, I can conclude. Overall, a satisfactory quarter for applications, and we're continuing with our actions to further improve profitability in applications.
Alexander Kara
executiveMoving on to Service & Accessories. In that segment, we delivered a solid result in service, with a range of repair orders both offshore and onshore. One example is the one you brought up — BritNed, the link between the U.K. and the Netherlands — but beyond that, on what you could call the base business, we also saw favorable progress on the service agreement. We did quite well too with accessories in Norderham for Service & Accessories. And in this area as well, we are adjusting our footprint: we will concentrate the high-voltage accessories in Alingsas, Sweden, and shift that work from Cologne to Alingsas. All in all, a record-high quarter, which is a nice way to begin the year. With that, I will pass it to Basil, who will walk you through the details of NKT Photonics.
Basil Garabet
executiveThank you, Alex. And the way to follow up a great quarter from cable is to try and catch up on our side and Photonics. Q1 was a good quarter for us. We hit the highest revenue, top line revenue in NKT Photonics' history, and the quarter got off to a very satisfactory start for us in both EBITDA growth and top line growth. Our organic growth came in at 26%, which is mainly driven by a broad-based comeback in the industrial segment, and all parts of the industrial segment were doing well. We also did well in the Medical & Life Science segment, where the growth continued from all the products that we launched in the middle and late 2020. With this higher revenue, our EBITDA has also increased. However, our earnings in Q1 were impacted by restructuring costs of EUR 1.2 million in the quarter. In the quarter as well, we recorded our highest ever order intake, which corresponded, again, to a 36% increase over the same quarter last year. And it's mainly due to the improved market conditions, again, mainly in the industrial side. If we move to the next slide on our business development. We, in Medical & Life Sciences, continued to perform well in the segment.
Basil Garabet
executiveThe primary factors behind this are our ophthalmology business, which is on the rise. We're adding more OEMs within that area. Plus, our microscopy OEMs have also climbed fairly strongly thanks to the shifts seen at the close of last year and carrying into this quarter. Within the industrial segment, Q1 showed a substantial rebound compared with 2020. That said, the research market's recovery remains somewhat soft, and we anticipate stronger performance there during the second half of the year. In aerospace and defense, activity remains at a very high level across both Europe and the U.S. This segment is expanding, and we look forward to new orders and further growth in this area. That wraps up my segment, and I'll hand things over to Line.
Line Andrea Fandrup
executiveThanks a lot, Basil. Now, to sum up how the business did this quarter on the income statement—this is on Slide 16. We saw better revenue and operational EBITDA, and that came from both the NKT Cables part and Photonics. For NKT Cables, the 21% growth this quarter came from the underlying business performance, as Alex mentioned. In the Solutions business, it was down 27%. The Applications business had 2% revenue growth; and Service & Accessories got off to a very strong start this year at 82%. And on an underlying basis, our business line within NKT Cables also delivered improved earnings versus last year. It's also encouraging that Photonics is back on a growth trajectory compared with last year, and we're cleaning up for the redundancies early this year at Photonics. We're also at breakeven in terms of original EBITDA. The cables part closed the quarter with a EUR 30 million operational EBITDA, almost threefold the prior-year quarter. On margin levels, I think it's worth noting that for the Cables division, a quarter like this actually lifts us to the 10% margin level. So we've had good utilization across our factories and also across the different cable technologies. At Photonics, excluding the redundancies here, you also see breakeven at the margin level.
Line Andrea Fandrup
executiveThat one-off item—a smaller divestment, the plant in Stenlille—worked in our favor here. Then we close out with a positive net result for the quarter of '21, slightly positive versus last year. And one last note on the FTEs. You'll also notice a section on the Cable business, which we've ramped up to handle growing activity in the Solutions business, along with the adjustment we made in Photonics. So let's turn the page to the balance sheet highlights. Here you can see that we emerged from a very unusually low level of working capital in 2020. And this is—we're now at a different level, matching the same level as last year in Q1. Moving then to ROCE, return on capital employed, you again see the good—improved performance at the earnings levels here, feeding through to an improvement in our ROCE versus last year and even the end of '20. On net interest-bearing debt and the leverage ratio: we ended 2020 with significant cash at hand, and we still hold EUR 179 million in cash at hand. It closed in Q1, bringing NIBD therefore to EUR 31 million, offset by the mortgage cost and the lease.
Line Andrea Fandrup
executiveSo at present, the leverage ratio stands at 0.4x for the entire company. Now, on the working capital trend. As you're aware, the big swings we've seen across the years here tie back to the Solutions business, the timing of milestones and prepayments. We saw some quite low working capital levels in Q4 of '19 and even lower in Q4 2020. So Q1 2021 rose somewhat because of the timing of payments in the Solutions business, but also the seasonal working capital buildup in applications as we prepare for the high season. Also, what you're seeing here in working capital, particularly in Q1 '21, is actually the value adjustment of our hedging instruments. It's a noncash effect, but it corresponds to EUR 57 million and it's correspondingly adjusted on our equity. Moving to the cash flow highlights. So improved earnings were still offset by the change in working capital, but also, as you know, the CapEx level. So we're working through our investment activities in the Solutions factories in Karlskrona and Cologne, and you're seeing the pickup here in the first quarter of the year, as you saw it also in Q4 2020. It will carry on this way in '21 and also into '22 once we've finalized the full program.
Line Andrea Fandrup
executiveAs a result of that redundancy, net cash flow for the quarter went negative. Now, moving to the full-year outlook. NKT Cables keeps its revenue guidance unchanged for the year, at EUR 1.1 billion to EUR 1.2 billion. And for operational EBITDA, EUR 80 million to EUR 110 million. One thing worth flagging here: we do anticipate that the first half will be a very solid one for NKT's business, given the project mix in our factories. And the revenue generation we expect. So the second half should come in at a lower level than the first half. I'm sure we'll revisit this during the Q&A. Then for NKT Photonics, after coming out of a much stronger Q1 with high revenue, we're now tweaking our guidance for the year slightly, saying we'll land at the upper end of the 0% to 10% range for organic growth, and similarly on the EBITDA margin. Uncertainties around COVID remain, and Q1 was affected by this as well. So it's still a question of watching aggressively how this develops. Now, turning to the final slide of the presentation.
Line Andrea Fandrup
executiveTo recap, one standout is organic revenue growth of 20% at NKT, with every business contributing. Another highlight, naturally, is that operational EBITDA nearly tripled, with solid contributions from all business lines. And then there's NKT Photonics posting its highest ever Q1 revenue, so it's also in better shape than in 2020. With that, we'll move on to questions.
Operator
operator<<operator_script>> Artem Tokarenko from Crédit Suisse has the first question today.
Artem Tokarenko
analystI have 3, please. My first question concerns Solutions margin. Could you perhaps discuss a bit how we should think about whether this elevated margin level can be sustained through the remainder of the year? And also, maybe, I noticed in the report that you have been wrapping up some of the projects. If there were any positive provision releases, how much did those contribute to the quarter, please? That is my first question.
Alexander Kara
executiveAs I've mentioned on previous calls as well, when utilization in the industry rises, margins need to go up — they have to improve on the Solutions side. And we've had solid execution and a solid mix, meaning that in Q2 we saw some favorable loading at the factory across the various machineries. That translates into good income from the machine, and it was a help. So in terms of <<inaudible>>, it means there's nothing extraordinary in the <<inaudible>> results. As for how things will develop going forward, Line said the second half is going to be weaker than the first half, or that the first half is the stronger one. That also hinges on the product mix we have in the first half — the MI production from Viking, which won't be the case during the second half. What effect that has on revenue <<inaudible>> it's too early to draw a conclusion here.
Artem Tokarenko
analystAll right, that’s clear. For my second question, I’d like to focus on the project pipeline. You mentioned that tendering activity is healthy. I realize you prefer not to discuss specific projects, but a few of your competitors are quite vocal about Euro Asia and the TenneT projects, which may be awarded in the next quarter. So what’s your view on those 2 projects? And perhaps also on the U.K. CMD round — it increasingly appears that the cable awards will in fact come next year instead of this year under the CMD. So how significant a risk is it for you that this may take somewhat longer than people originally anticipated? That’s my second question.
Alexander Kara
executiveBeginning with the U.S.–U.K. CMD round — as you noted, and rightly so, it will most likely move into next year, early next year. That's a delay of, say, a quarter, which isn't a major delay given that we have a solid backlog. So it finally lands in Q1, or perhaps Q1 or even Q2. But overall, there are multiple projects we're working on in Asia. I don't want to name specific projects — interconnectors using a different technology — but also onshore wind and oil and gas connectivity in the U.S. So that should still be above EUR 3 billion. It depends; it could be even more if some of the other interconnectors get awarded. So we're busy. Our people in the TenneT team are busy. And I'd say the entire industry is busy working on projects in the U.S. as well, which is good — good for NKT.
Artem Tokarenko
analystAlright, my final question concerns what you said in the report about possibly returning to the strategic review of the Photonics business. I believe you noted that would happen as the COVID situation eases, yet elsewhere in the report you said you expect that — the COVID situation easing — to occur only in H2 this year. So what internal timing do you have in mind for that review process? And perhaps a related question: obviously, your peers have been announcing capacity expansions in the U.S., but I think you previously said there are no immediate investment needs on your side. So if Photonics were to be disposed of within the next 24 months, how would you assess the capital allocation on the back of that?
Basil Garabet
executiveAs we said, the strategic review of Photonics is scheduled to begin once operations return to normal. So once the problems stemming from COVID and the aftereffects of COVID are finished, we'll then be in a position to examine Photonics in a more holistic manner and establish a timeline for the <<inaudible>>. Right now, <<inaudible>> worldwide. So even though we're performing very well, we're not out of the woods, so to speak. And once we are, we will announce the strategic review. Nothing further has been done regarding any capital allocations or anything else.
Operator
operatorOur following question this afternoon is from Kristian Johansen, who is on the line from Danske Bank.
Kristian Johansen
analystI'd actually like to pick up right where we stopped. So maybe, once more, could you restate precisely what COVID-19's effect on Q1 was? Since from my perspective, it doesn't appear that the impact is really all that large.
Basil Garabet
executiveYes. I mean, there is an effect. A number of our businesses are performing exceptionally well, while others remain impacted by COVID. Certain businesses have experienced a knock-on effect, having been weak during the last 2 quarters of -- or last 4 quarters of 2020, and they are recovering this year. So it also is -- you need to factor in that Q1 is our smallest quarter. Generally speaking, it is a quarter that follows what typically is our biggest quarter. So at this stage, it's hard to basically draw a parallel from it or a trajectory from it. I think once you look at upcoming quarters as we move through this year, that's when we'll be able to make a better assessment of where we stand at the moment. It remains somewhat difficult to make that assessment. And COVID has affected certain things. It's -- obviously, we don't break down which parts of it have been affected in our shipments, in orders and everything else, but it has had an effect.
Kristian Johansen
analystAlright, got it. And based on what you know at this point, is there any worsening as we move into Q2 when it comes to the COVID impact?
Basil Garabet
executiveNo, we haven't observed anything like that.
Kristian Johansen
analystAll right, that's clear. Moving on to the Cable segment, I just want to verify those smaller onshore and variation orders. So doing a quick calculation from the backlog change and the revenue, I come up with roughly EUR 50 million in standard measure prices of orders booked in Q1. Could you confirm if that figure is right? And could you also speak to these smaller orders — are they AC, DC, MI, XLPE? Or what's included there?
Alexander Kara
executiveYes, your math checks out. We took a EUR 120 million hit on the backlog. And there's EUR 50 million coming from new orders. That's mostly AC onshore. We were also awarded the RP frame agreement, but that's the call-off, and it wasn't in Q1. So it's primarily AC onshore, with no DC and no MI. EUR 50 million would be a rather small — very small — no, you could almost say, not at all for MI. And that figure is small for NKT Cables. So it all falls under onshore AC on variation, or one of the sea cables, but then just some smaller changes.
Kristian Johansen
analystYes, got it. And could you also speak to the chances you still have to bring in orders that would move the needle on revenue for this year?
Alexander Kara
executiveOkay, we have these in-and-out orders along with variation orders, and those can shift things. As you've seen, we're seeing strong growth in service, which offshore repair is driving. So on that front, there remain chances to lift revenues in 2021. We've also now got Troll, which adds some contribution in 2021 — that's good — and it will keep contributing in 2022. So some possibilities are still there.
Kristian Johansen
analystI was really thinking more about the bigger orders, such as the Troll orders. Are there any additional orders <<inaudible>> that might have some impact on this year?
Alexander Kara
executiveRegarding large orders, the business would be granted them. As you'd expect, there's invariably a lead time involved for engineering work, type testing, and similar steps. Should any sizable order land in Q2, its effect on POC would be minimal — a very small figure, if anything at all. So the benefit would begin taking effect at the start of 2022.
Kristian Johansen
analystGot it. My final question is about the Applications business — could you give some color on low voltage and medium voltage individually? On medium voltage specifically, you noted some difficulties for your customers in Sweden during Q4; has that carried on? And regarding low voltage, we're hearing building material companies speak of growth picking up toward the end of Q1 and carrying into April. How much of a similar picture are you seeing?
Alexander Kara
executiveOkay, so in Q4 we did see somewhat softer demand — that's accurate. But at this point we're seeing demand pick up. In Sweden, Q1 got off to a somewhat sluggish start. Still, on the whole demand is on the rise, and we managed a bit of growth as well, 2%, even though the ERP implementation landed in early Q1, which can always have some kind of effect. So demand looks solid. The U.K. is also recovering on the demand side. France is recovering too. So all fine, I'd say, yes.
Kristian Johansen
analystTo clarify that, you're saying demand improved at some point in Q1. Is that what we're seeing?
Alexander Kara
executiveIt didn't happen in quarter 1. I mean, it differs somewhat by country. But on the whole, you could say there's greater demand, if you want to put it simply.
Operator
operatorThe next question in the queue is from Akash Gupta at JPMorgan.
Akash Gupta
analystAnd I’ve got a few follow-ups to questions that were already asked. So you mentioned that you expect a sequentially weaker second half compared with the first half in projects. Are there any projects out there? And depending on whether you win those projects, could this still change? Or is it just too far out, or simply not possible given the lead times you have in projects? That’s question number one.
Alexander Kara
executiveWell, no — it really depends. Should we get some variation orders in Q2 that move quickly, that would naturally assist in making things better, or something along those lines. Still, looking at where we stand right now with backlog — what's on hand plus what we've secured in orders — then judging by today's circumstances, we anticipate a stronger first half and, shall we say, a somewhat weaker second half. Naturally, we're working to make it better, but there also have to be chances to improve coming from the market. There must be short-cycle business available.
Akash Gupta
analystRight. And on your point about the second half being weaker — would it be fair to say that the second half still shows some year-on-year improvement? I mean, Q4 last year was pretty weak. So I'm just wondering whether it's fair to expect some year-on-year EBITDA improvement in the second half as well, and not just in the full-year guidance?
Alexander Kara
executiveAkash, I need to take a look at that Excel file now. Let me pull it up. Compared to — well, I don't have the breakdown in front of me at the moment. At the overall level, what we've stated still holds: our plan is to grow on average by more than 10%. That's our intention, and it holds for this year as well as next year. So — that should give you a sense of things.
Line Andrea Fandrup
executiveNo, I just believe it matters that we stay with ARPU in some way here, correct. That's what we expect. So now new Q1 and then a bit of an assumption where I think you can use that to arrive at the quarter's norms. So we shared that the first half beats the second half. I don't think we should leap to saying it will beat EUR 82 million to EUR 100 million on EBITDA.
Akash Gupta
analystYeah. What I’m wrestling with at the moment is this: in Q1, EBITDA rose EUR 20 million versus a year earlier, and you’re guiding to a strong first half, which suggests Q2 should also show a solid gain. Then, when we turn to the full-year guidance, the implication is an improvement of EUR 23 million to EUR 53 million. And I think we’re already at the bottom end of that guidance range in terms of the improvement required to get there. So yes, I just wanted to ask whether that guidance is conservative. And should we expect that you could deliver more than EUR 110 million in full-year EBITDA? Or is it too soon to discuss that?
Line Andrea Fandrup
executiveI'd say it's too early. A modest amount of growth in the second half — that's probably fine, I think.
Akash Gupta
analystNow let's shift over to the Applications segment. I mean, in this area, you've witnessed a solid margin recovery following several quarters where results fell short of what was expected. And was there anything out of the ordinary in Q1? Or should we anticipate that the 5% to 6% margin run rate from this Q1 can hold up as we move ahead?
Alexander Kara
executiveQ1 held no surprises—we simply carried out the initiatives we'd laid out for strengthening the business. And you can count on that carrying on.
Akash Gupta
analystMy last question concerns depreciation for the Cables business. In Q1, you recorded a EUR 25 million D&A charge. Should we simply annualize that figure and assume roughly EUR 100 million of D&A for the full year? Or do you have any thoughts on that?
Line Andrea Fandrup
executiveYes, that’s something you’re able to do.
Alexander Kara
executiveAbsolutely.
Line Andrea Fandrup
executiveYou've essentially got that right.
Operator
operator<<operator_script>> Today's next question will be from Claus Almer at Nordea.
Claus Almer
analystBasil, the first question is for you. You said you observed this negative effect from COVID during Q1. I just have to say, if that's true, then the underlying performance has to be quite impressive and promising for the remainder of the year. So perhaps you could shed some light on what you're seeing in order intake? Which kinds of clients are placing orders with you?
Basil Garabet
executiveClaus, I believed you had already heard back from me on this. Yes. What I actually said was that COVID hit certain parts of our business negatively, not every part. So in some sectors — for example, industrial, manufacturing, say, in Europe, anything tied to automotive or large-scale manufacturing — COVID is still having a relatively significant impact. Our research and development business as well, which remains a meaningful portion of revenue at roughly a 1/3, is still fairly shut down, since most establishments continue operating on reduced hours or have closed entirely. Those, then, are the segments. They tend to be the smaller segments within what we do that COVID is affecting. And they're also less expected in Q1. Q1 is typically our smallest quarter. So these segments have usually contributed more in the other quarters. What we're looking at — what we're telling you here is that COVID is still having an effect. And if it keeps affecting these sectors, for instance, it will have an impact on the rest of the year.
Claus Almer
analystAll right. So then you're shifting how the guidance is phrased, putting it at the upper end of that range. What's the thinking there? Does that assume COVID remains a headwind through the rest of the year, or just in Q2? Or yes, how should we frame that?
Basil Garabet
executiveWhen we put together the guidance for the year, our assumption was that COVID would affect the first half of the year, and that business would gradually get back to normal in the second half. That's the picture we saw -- and it basically shaped both our budgets for the year and the forecasts.
Claus Almer
analystSo now you're anticipating landing at the top end of that range. Does that imply the COVID-19 impact will end up smaller than your original estimate? Or is it unchanged? Or what's driving that upper-end finish?
Basil Garabet
executiveTo put it another way, what we meant was that you can't simply take Q1 and multiply the effect or the increase times four. The reason is that we're in too many businesses, and there's too much push-and-pull coming from a lot of these different segments. So I expect — obviously, we would be — we anticipate landing at the top end of the range. If that changes, we will change the guidance.
Claus Almer
analystAll right, that's fair. Now let's go back to the Cable division and that first-half versus second-half seasonality — maybe I missed part of it, because I couldn't quite make out what you said. So could you walk through it once more: why exactly should the second half be notably softer, or weaker, than the first? My impression was that a number of those low-margin projects sitting in backlog were slated mostly for delivery in the first half of the year.
Alexander Kara
executiveNo, the margin isn’t really the main factor there. It’s more about the mix. If you look at the presentation, you’ll see what we executed in Q1: a mix of DC cable, DC extruder, three-core AC, and MI. And in the second half, the mix in production and the overall composition is a bit less favorable, put simply. That makes it somewhat weaker.
Claus Almer
analystOkay. But is it right that, when you consider the particular projects you'll produce or deliver during the first half, some are among those you took on where margins faced somewhat greater pressure?
Alexander Kara
executiveYeah, that's fair to say. Still, if you carry them out well, the outcome can improve.
Claus Almer
analystRight, okay. So with the Applications division, has that trend now been put behind you, or are there still things left to do — and would that lift your profitability?
Alexander Kara
executiveThat still has room to keep going, and we still expect it to get even better.
Claus Almer
analystAll right, and for my last question, I’d like to ask about the new capacity being added. Could you provide an update on whether everything remains on schedule? Is there anything we ought to know about?
Alexander Kara
executiveNope, all of it remains on schedule. The factory expansion in Cologne is moving ahead, and so is the work in Karlskrona. We've only just begun constructing the <<inaudible>> using the slip form. That will carry on for the coming 2 months. So around May, June, or early July, a building 150 meters tall will be visible in Karlskrona — the third-tallest structure in Sweden. Everything there is proceeding according to plan.
Operator
operatorThere's one more question coming in from the online queue. It's from Artem Tokarenko at Crédit Suisse.
Artem Tokarenko
analystI've got a couple of questions. First, on that H2 versus H1 message, can I just confirm whether it's specific to Solution, or does it apply to other divisions too? And the second part: I think earlier you were describing more of a sequential improvement as the quarter went on. So what's changed, I guess? Is it simply the phasing of Viking Link now being weighted toward H1? Or has something else shifted?
Alexander Kara
executiveNo, Viking — that was during H1. And my apologies, could you repeat your question? I just...
Basil Garabet
executiveConcerning the sequential shifts from one quarter to the next?
Alexander Kara
executiveNo, no. It hasn't shifted across the quarters. I mean, we enjoyed a robust service quarter driven by repair, though that repair was accidental. We've also been in touch with BritNed. So you — this is something you're able to plan for. It may or may not occur. So that made a nice contribution in Q1, but so did the underlying sustainable business in the third quarter. And nothing has really changed. I mean, I'd say that in Solutions, utilization is good and execution is good. The service order is sustainable and growing nicely. We'll keep going with the footprint changes, as mentioned, the accessories and building wires. On Application, we're sticking to our plan. So purely as a result of the mix, H2 comes in a little weaker than H1.
Artem Tokarenko
analystUnderstood, and sorry to jump in, but that's how I'm reading it. Is this mainly about the Solutions business, or are you speaking about all 3 divisions within Cables?
Alexander Kara
executiveThat ties back to Solution and Service. Solution carries a somewhat different mix than Service, and we have a figure from Q1. We're actually carrying on with <<inaudible>>. So Service & Accessories probably hinges on whether a repair shows up in H2, though that isn't something we can forecast — it ought to come in below the first half as well.
Artem Tokarenko
analystAll right. But let me just verify that on Solutions. So this simply mirrors a somewhat different mix phasing across the quarters? There aren't project delays or cost of runs or anything of that sort that we should know about?
Alexander Kara
executiveNo, no.
Artem Tokarenko
analystAlright, that's great. Now, two more things from me. Regarding the U.S. — with your rivals growing, and BritNed having just announced possible plans to build some capacity over there as well, plus high voltage — in that kind of scenario, do you feel it's now a necessity for you to put out U.S. capacity build-out plans of your own within roughly the next 2 to 5 years? Or how are you thinking about that?
Alexander Kara
executiveNo. What I mean is that we've only just <<inaudible>> enrollment in Karlskrona, and we need to digest that as well as the lease on the backlog. So as things stand right now, that's our plan, and there's nothing more beyond that.
Artem Tokarenko
analystAll right, and the final thing I want to ask about is how much room you have to put in bids for big efforts such as Euroasia and TenneT. And I suppose this partly ties back to what I asked earlier — from where you sit, do you lack production but instead have more in the way of financial and management capacity to take on those efforts? And what discussions are you having with customers when they worry that you already hold one large project, and because of that, having you take part in something like Eurasia could be too much of a risk?
Alexander Kara
executiveNo, what I mean is that in the past we've handled big projects. We've just finished NordBalt. On the corridor project we took on EUR 1.5 billion. So absolutely, we're able to take large orders. And we've got both the capability and the capacity to do that <<inaudible>> no communications. Also, last year there were some worries about whether we could succeed on the corridor projects. And as you've seen, we secured roughly EUR 1.5 billion. So -- and there are a number of large projects where we're currently active in tendering, in the next large offshore wind. So yes, and we wouldn't bid on them if we saw -- if we didn't have a chance of succeeding.
Operator
operatorThere's another question still waiting on the line, and it's from Prathamesh Saygaonkar at Goldman Sachs.
Prathamesh Saygaonkar
analystI've got two questions. To start with, I'd like to ask about the NKT Victoria. Could you help me get a handle on how that vessel is utilized? Also, does that same ship handle both installation work and repair jobs, or do you bring in other vessels under subcontract for certain of the other installations? I'll save my second question for after this.
Alexander Kara
executiveAs you can broadly see, with our expansion and with the rise in turnkey jobs, the revenue we bring in from using NKT Victoria is going to increase. During Q1, we were occupied with both installation and a repair job involving NKT Victoria. Specifically, you can see that the repair treatment happened in February in the channel, where conditions can be harsh, with an 8-meter base, for instance — for that kind of repair job you need a vessel such as the Victoria. In fact, we had 2 vessels out there handling this repair work. It really hinges on what type of repair you're dealing with. If the repair is offshore — or, say, nearshore — then a barge or a third-party vessel might get the job done. For smaller repairs, you may not require a vessel like NKT Victoria. So in this respect, we have the flexibility to deploy either our own assets or third-party vessels, whichever suits the job best.
Prathamesh Saygaonkar
analystAnd for my second question, I wanted to ask about margins across the different kinds of repairs. Could you help me get a sense of how those margins differ? I mean, which factors determine the margin on a repair job? Does it depend on the depth, or the kind of cable you're repairing, or how urgent the job is? Would you help me understand what drives that?
Alexander Kara
executiveNo. The margins on repair jobs differ, obviously, depending on which repair job it is. But you can imagine that a large repair is appealing, though you still have to stay competitive since our competitors also do repairs and bid for repair work. So you need to be competitive for TenneT too. The bigger the job — and, you could say, the more complex it is as well — the higher the reported margin.
Prathamesh Saygaonkar
analystOkay, just to get that cleared up, is there any distinction at all between AC repairs and DC repairs?
Alexander Kara
executiveWhat? I couldn't...
Prathamesh Saygaonkar
analystDo margins differ at all? Sorry—I just wanted to see whether AC and DC repair jobs carry different margins.
Alexander Kara
executiveAC and DC. No, no — there isn’t any — no. So 3 phases, so no.
Operator
operatorThanks. That wraps up the Q&A — we have no more questions right now.
Alexander Kara
executiveAlright, since nobody has anything else, I really appreciate all of you taking the time to join the call, and thanks for the great questions. I hope you'll also be on the Q2 session. And we'll see what the results look like at that point. Thanks so much. Have a good day, and we'll talk soon.
Operator
operatorThat brings our presentation for today to an end. Thank you all for joining us.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete NKT A/S transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to NKT A/S earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in NKT A/S or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.