Operator
operatorHello, and thanks for staying with us. Welcome to the conference call on NKT's Third Quarter Report 2022. <<operator_script>> I should let you know that this call is being recorded today. At this point I'd like to pass the call to today's speaker, Alexander Kara. Please go ahead.
Alexander Kara
executiveYes, good morning, everyone. Thank you for being on this call, where we'll be presenting the results for Q3. Joining me here in the room is Line Andrea Fandrup, my CFO. Let's move to the main takeaway from our Q3 results. On the whole, I'd regard these results as satisfactory. We provided some qualitative signals regarding our Q3 results at the Capital Market Day we hosted on the 22nd of September, so there are perhaps not too many surprises in the Q3 results, though we may return to that. So overall, organic growth came in at 8%, and that growth has also driven operational EBITDA. On the basis of the first 9 months and the outlook, we are updating our financial outlook, and Line will go through the details a bit later. Our high-voltage order backlog remains very high at EUR 4.5 billion, and we have some orders in onshore -- AC onshore -- plus variation orders on the existing projects. We issued a green hybrid bond of EUR 150 million to strengthen our financial position for further opportunities and to grow. We hosted a Capital Market Day on 26th of September, where we also announced our updated strategy, which we call ReNew Boost, where we gave an upgrade of our midterm guidance and outlined the way — what our plans are to go forward.
Alexander Kara
executiveLast week we got the chance to be in Sharm El Sheikh, taking part in COP27 along with a number of meetings such as Caring for Climate. And it's obvious that NKT, through our cable solutions, is able to play a part in the green transition — enabling and transporting power from offshore wind to shore for interconnectors and so on. And we at NKT contribute not just when it comes to Scope 1 and Scope 2, but to cutting Scope 3 as well, and I'll come back to that later. Participating in that event was quite interesting. And I think, as I mentioned, that NKT and the whole cable industry too are able to play a part in decarbonizing society, which is a key goal. At NKT Photonics, we're carrying on with the divestment process, and we're moving ahead here as planned, and it ought to be wrapped up by Q1 next year at the latest. If you look at the Q3 performance. We're growing in solution and with this underlying operational EBITDA. A year ago — in the same quarter — we had a onetime impact of EUR 20.7 million from an insurance claim that we settled, which naturally we don't have this year, and that affects the numbers, but on the whole we improved.
Alexander Kara
executiveOn applications, I'd call the outcome unsatisfactory. We managed to increase <<inaudible>>, yes, but that came purely from price hikes in the volume produced and cable we <<inaudible>> used. The cause was higher input costs, and we might return to that later in the presentation. In Service & Accessories, revenues and operational EBITDA leave me satisfied. Service delivered a good quarter, and accessories did too — on the high-voltage side we improved. So you can see the figure on the right, and we have already communicated that growth. Turning to Solutions in the third quarter, we carried out a number of projects, and through them we brought in revenues. That gave us growth of 10% along with improved EBITDA of EUR 24 million. Victoria <<inaudible>> handled several jobs — Shetland, Troll and others — and utilization was good. We've carried on expanding our factory in Karlskrona and Cologne, and on the 27th of October we inaugurated our extrusion tower in Karlskrona; now, in November, we intend to produce the cables using the investment we've made. We also turned out the first low carbon copper cable, cutting CO2 emissions by 23,000 tonnes for Dogger Bank C, the biggest offshore wind farm in the U.K.
Alexander Kara
executiveAnd that's the first DC. This matters a lot for cutting Scope 3, and we have to keep pushing forward on that journey of lowering Scope 3. As you probably know, 95% or more of the CO2 emissions come from producing copper, aluminum and so on. Just 25% or less sits within Scope 1 and Scope 2 of NKT auto cable production. So it's a very significant step as we engage the whole supply chain, starting at the mine with <<inaudible>>, to make it happen. So that's a big move forward then. Turning to the high-voltage market, we've booked several AC onshore awards and variation orders, and we were chosen as turnkey supplier for East Anglia THREE, which isn't in the backlog yet as a firm order. We're at the notice-to-proceed stage there until the customer reaches final investment decision, which is expected in Q1 of next year. In October we landed the HVDC onshore power cable Hertel-New York, the Canadian portion of the Champlain Hudson Express power project. Its total value is EUR 90 million -- roughly EUR 90 million at market price, and EUR 80 million at standard metal price.
Alexander Kara
executiveThis is going to roll into next — into Q4, into the backlog. Overall, in the first — if we take a look at the first 9 months, orders awarded total EUR 7 billion. Of that, NKT accounted for roughly EUR 2.1 billion, or in fact slightly above EUR 2.1 billion once you include Champlain Hudson Express at around EUR 1.4 billion thanks to the Ostwind second system. <<inaudible>>. That's roughly the same market share we've held previously and that we plan to keep as we move ahead. For the full year, we continue to expect EUR 8 billion in project awards. And looking ahead to next year and the year after that, we see a strong market of EUR 7 billion to EUR 8 billion, which we expect to carry on. We've disclosed here how we work through the backlog: 5% for the rest of the year in Q4, 25% for '23, and 74% for '24 and beyond. These figures are rounded. And to repeat, this is the backlog. It excludes East Anglia THREE or Hertel and so forth. And of course, I already read this morning the first report from the <<inaudible>>. So that's a rounded figure, 25%. A strong backlog at EUR 4.5 billion.
Alexander Kara
executiveSlightly lower than Q2 — EUR 100 million. Applications. As I already mentioned, application was a disappointing quarter, a soft quarter caused by higher input costs. Although we managed to raise prices, the tonnage of cables sold went down. There's plenty of room for further improvement there, and we've noted in our report as well that we expect some recovery in Q4, though the market remains dynamic. Just to give you one illustration: at the close of the quarter, we got, for instance, a huge price hike from a supplier taking effect on the first of the following month. So imagine receiving notices like that with only 3, 4 days' warning — you have essentially no opportunity to pass the increase on to your customers. So we are pursuing — in any case, we're pursuing price increases with customers and also examining how we can better the situation with our suppliers. So we're seeing a drop in construction-related business, meaning building wire and 1KV, mostly copper, which stems from the European economic downturn. So we genuinely feel the recession in that portion of the business. When we turn to medium-voltage, demand is strong, propelled by electrification of society, decarbonization and all these initiatives, so that's a positive.
Alexander Kara
executiveTurning to Service & Accessories. It was a solid quarter for that segment, with both revenue and earnings contributing. I'm especially pleased that we managed to grow revenues in high-voltage accessories. So that's a positive development. Something new, and something we're hearing growing concern about from customers, is critical infrastructure — whether we're talking interconnectors or offshore wind. We've all been following the news of the <<inaudible>> explosion. In fact, one of the explosions northeast of Bornholm in Denmark occurred less than 1 kilometer from an interconnector linking Sweden and Poland, which at the time was undergoing maintenance. Customers are becoming worried about critical infrastructure, and this is something the cable industry — and our company — must address: how can this be better secured going forward in the future? That's a new development in the market. So, good development. And we're continuing our activities to relocate accessories from Cologne to Alingsas. And as I said, we see good development there. With that, I'll hand over to Line, and she'll take you through the financials in a bit more detail.
Line Andrea Fandrup
executiveYes. Thank you so much, Alex. Alex did a solid job covering the quarter in terms of organic growth of 8%. And I can also mention that for the year-to-date, that corresponds to a 9% growth. So we're tracking well here. Every business line is contributing to this growth, which is also encouraging to see. On operational EBITDA, it's important to flag this insurance gain from '21, which adds on top of the EUR 45 million from Q3. If you actually strip that out, we have solid underlying operational performance as well as an improvement in margin. Looking at EBITDA and also the net result for the quarter, note the one-off, of course, from last year at the same time. So since we don't have the same here, we have a good level of -- on the EBITDA. And the net result is also quite a bit higher versus last year. Overall, we're still continuing to ramp up on the FTEs. We're driving footprint changes on an ongoing basis. We have announced both for -- we're approaching the end of the -- not quite there, but approaching the end of the Applications footprint moves at the factories. And then from Cologne to the Czech, we're also continuing that journey, meaning we ramp up FTEs to be ready at the receiving end and eventually, at a later point, will rent down.
Line Andrea Fandrup
executiveI believe that line was on the income statement. Moving on to the balance sheet highlights, you'll notice working capital—ignoring the hedges—has deteriorated somewhat versus the prior quarter. The main reason is an inventory buildup in the Applications segment and, more broadly, securing raw material stock so we're ready to produce. We also see some phasing of milestone payments in the Solutions business. Conversely, you're seeing certain accounts receivable improvements thanks to collection efforts in the Applications business. Turning to RoCE, across quarters it's been more or less stable at around 3% to 4%, and it was not 2 months ago that we held the Capital Markets Day, where we also shared that the ambition is to move into the double-digit space and beyond. So you'll see this gradually improving over the years. But of course it's very important that our expansions and our investments actually come online and begin contributing the earnings expected. Cash flow came in at a lower level, largely because of the investments as well.
Line Andrea Fandrup
executiveAs you can see, net interest-bearing debt went up, with leverage at 0.6x EBITDA. As Alex noted too, we issued EUR 150 million of green hybrid securities, roughly replacing the hybrid we currently have in place. Moving to the highlights from the cash flow statement. Cash flow from operating activities came in slightly negative, since the earnings contribution was offset by working capital changes. And the ongoing investment flows shown here, on the year-to-date figure, were EUR 144 million versus EUR 123 million <<inaudible>>. So we're wrapping up the investment — the expansion in Cologne. We're carrying on in Karlskrona, as you'll recall from the Q2, the new child that we inaugurated recently, now a second <<inaudible>> coming there, and you'll see more of those investments through '23 as well. And moving to the next slide, a recap of what we announced this morning and an update to our financial outlook for the year. On revenue, EUR 1.4 billion to EUR 1.45 billion. And for operational EBITDA, we're dropping the lower end and saying we expect to land within EUR 140 million to EUR 155 million for the year.
Line Andrea Fandrup
executiveNaturally, unexpected events can occur, as we've witnessed at least across the past 3 years. Still, this aligns strongly with the fundamental premises of the business as it stands today, which we anticipate <<inaudible>>. To restate the main points: organic growth is continuing and is expected through the remainder of the year. Our order backlog is solid, and we also hold a healthy share of this year's awards. That gives us greater visibility now into how much of the backlog we expect to convert in '23 from the recall. There's the green hybrid security issuance and the rollout of the refreshed strategy, ReNew Boost, together with medium-term ambitions. Let me restate those: we anticipate averaging above 12% growth across the horizon through '25. Operational EBITDA is expected at 12% to 16%. And we anticipate reaching and exceeding 12% RoCE by the close of that period. So we're very much seizing the green transition opportunity. With that, let's move into the Q&A session.
Operator
operator<<operator_script>> We're now ready to take our first question, and it comes from Massimiliano Severi of Credit Suisse.
Massimiliano Severi
analystThere are two divisions for me. First, on Solutions, margins this quarter came in fairly weak even though Victoria ran at full utilization. My question is whether that's simply a matter of project phasing, or whether you're also seeing margin pressure from inflation and from the difficulty of passing higher inflation through to customers on projects?
Alexander Kara
executiveRight. When it comes to the Solutions margin, 12.8% to 12.9% is below where we were last quarter. That's down to project phasing. We still carry some lower-margin work in backlog that has to be executed — for instance <<inaudible>>, where we're currently in an installation phase. And naturally, most of the costs in Solutions we're able to hedge, though we can't cover every cost — steel cost in Solutions, for example, and steel prices have also gone up — but it's mostly phasing, plus a few other effects.
Massimiliano Severi
analystAlright, and my second question relates to Applications and those price-cost challenges. Roughly speaking, when should we expect things to normalize in terms of timing, since you're trading prices? And do you believe the 7% to 9% margin range we discussed previously can still hold once price-cost issues settle down in the division?
Alexander Kara
executiveOn cost, as I mentioned and as we stated in the report, we are seeing improvements, and obviously the October figures are already visible. That gives us a degree of confidence. Still, input costs continue to move in a very volatile way. As I noted a moment ago, just a few days before month-end one supplier sent us a letter announcing a substantial price rise effective at the start of the following month. When an increase of that size lands with only 5 days' notice — effectively 4 days, an extremely short window — you basically have no opportunity to pass it on to your customer. That is one instance. What lies behind us, I would say, or what we have handled up to now, is the first round of price increases. It cannot be ruled out, though, that a second wave of input price increases will arrive, driven by energy prices, transport premiums on metals, higher premium costs on plastic stemming from elevated energy prices, and so forth. So we do see improvements — for Q4. Is that stable? That is hard to say — difficult to say. Things are very dynamic, and I would not go out on a limb at this point and declare that we are out of the woods.
Alexander Kara
executiveRegarding that 7% to 9%, I believe the market and input prices need to settle down first. Once things stabilize on that front, you can see where that lands you — though unfortunately, this is a very fluid situation.
Operator
operatorAnd our following question is from Nancy Ni at Goldman Sachs.
Nancy Ni
analystI wanted to pick up on Applications, if I could. You mentioned that European construction is softening, along with the broader macro picture. So I'd like to get your view on where Applications might go as we head into 2023, assuming the macro keeps deteriorating.
Alexander Kara
executiveYes, I mean, we’re seeing a clear drop — I mean, in terms of the effect on building buyers and 1KV copper. So demand is weakening, and it’s substantial. So we see an impact on revenues, but also on output and, as a result, on tons of cable produced and building wire in 1KV. So it’s — I don’t expect this to be over soon, this little recession. And I assume it will continue into ’23. But I’m also not an economist, so I can’t predict the future. But I doubt that it will be — or that we’ll see a recovery soon. I think we need to live with this situation of lower demand for buildings. Yes.
Operator
operatorMoving on to the next question now, which is coming from Claus Almer at Nordea.
Claus Almer
analystI've got a couple of questions too. First one's about the order intake you booked this quarter in onshore wind, plus the variation orders. What should we expect for margins on those orders? That's my first question.
Alexander Kara
executiveWhen it comes to margins — take offshore, for instance — typically valuations come in at equal or stronger margins compared with the project's original margin. On the onshore side, we're seeing a trend toward improved margins on projects that are coming in, though those are partly being executed, let's say, somewhat further out. We have a fairly solid backlog in AC onshore. So what we observe is greater improvement in AC onshore as well, and that's also driven by higher demand.
Claus Almer
analystAnd Alex, are you generally seeing more of these variation orders? In other words, you get the order into backlog, and then as the project moves along, do you see additional variation orders coming in?
Alexander Kara
executiveNo, I wouldn't describe it as more — what I mean is that variation orders offshore come primarily from installation, from changes to the installation spread. That can shift at times from one year to the next, but it isn't the case that it's climbing substantially or falling substantially. It also hinges on how much offshore installation work you have. I mean, if there's more offshore installation work, then the likelihood of your variation order rising goes up as well. Onshore, you typically see fewer variation orders on the existing project while installation is underway. So it fluctuates a bit, depending on how much installation you have, Claus.
Claus Almer
analystSure. All right. My next question is about production quality and efficiency across the Solutions division as a whole. Perhaps you could update us on how you see that progressing, both on the existing lines and with the capacity ramp-up?
Alexander Kara
executiveYes. I mean, in terms of ramp-up capacity, as I mentioned, our revenue growth is relatively moderate, as the figures show. And we only just integrated the Karlskrona tower on the 27th of October <<inaudible>>. It wasn't ready before, and now in November we're beginning to produce the first cable in Karlskrona. And in Cologne we're a little bit earlier. So we've seen a rather slow start and then also a slight delay, to be honest. And -- but these extrusion lines are also even the supplier deliver -- produced several of those. It's not the machines, you press the button and then boom the cable comes out. So a lot of adjustment. So the ramp-up will happen now gradually, and we should see it in full in 2023. from the expansion. Meaning the expansion, what we did with EUR 150 million investment, the EUR 90 million will come the year after. And efficiency improvement, we work, of course, on efficiency improvement and we have moved one extruder from Cologne to Velke Mezirici. And obviously, during this move, you cannot produce a cable so you missed that volume from this extruder. This has now been completed, the installation of this extruder in Velke.
Alexander Kara
executiveAnd at this point we're beginning to make the initial cable. After that, a tight test has to be run. As soon as those tight tests are finished, production can begin in Velke Mezirici. That's going to take place in Q1 of next year. After that, we again have the transitions from AC over to DC. In Cologne, that work is continuing as well. So it's somewhat of a dynamic process, and next year we ought to see improvement — mainly, though, not too much <<inaudible>>.
Claus Almer
analystOkay. That said, with this additional capacity coming online, I realize it's still quite early, but would you say you're satisfied with what you've seen up to now?
Alexander Kara
executiveYes, I'm satisfied — I'm satisfied. That said, whenever you bring in new equipment, there are always a few hiccups, so to speak, but that's normal. I mean, I've had <<inaudible>> before, and we sort these things out together with the supplier. Then too, at the end of the day, we have to make sure the cable we deliver is of the right quality — meaning the roundness, the waviness, the precision — and in this case that applies to 2 different extruders, with a difference, since we have different suppliers. So there's plenty of fine-tuning needed to make sure quality reaches the level you're aiming for, especially when it comes to DC, which is very sensitive, and you have to stay within the limits of what you've got, particularly across this design, to get the performance.
Claus Almer
analystAll right. So it sounds like you're set for 2023.
Alexander Kara
executiveYeah, we’re set for ’23.
Operator
operator<<operator_script>> Our next question is from Akash Gupta at JPMorgan.
Akash Gupta
analystMy first question concerns awards for offshore wind projects. What I'm really asking about is how quickly decisions get made, given the potential windfall taxes we're seeing in both the U.K. and Europe. I mean, here in the U.K., I think there will be a provision <<inaudible>> on whether windfall taxes will appear and what the threshold level for those windfall taxes would be. I'm just wondering whether you're talking with your customers about whether there could be any potential delays when it comes to closing orders or awarding firm orders, based on what kinds of surprises might emerge from this announcement in the coming weeks, which could shift from time to time given the situation in both Europe and the U.K.
Alexander Kara
executiveNo, what I'm saying is that we aren't seeing any delays here. I mean, East Anglia THREE has been announced. And we're also pursuing other opportunities where no delays are showing up. But as I said at the start, this came up at COP27, and one of the subjects was permitting and the delays of the — or how long a project takes from start <<inaudible>> until completed. I was in a session on Dogger Bank, and it took 10 years from start before it finally came into service. That's too long, and a number of participants at COP27 said the duration is too long. And on the financing side as well, certain parts are quite complex in this project. More than 30 banks were involved, in particular. So permitting as a whole has to speed up so we can handle the large growth that the companies are committed to managing. But to answer your question, we do not see any delay in the project we have on hand that we expect to become an order.
Akash Gupta
analystMy second question concerns the capacity picture for next year in the Solutions business. Thanks for including that chart showing how the backlog phases. I believe you mention there that roughly 1/4 of the backlog — around EUR 1 billion in standard metal — has already been secured for 2023. I'm just wondering how much additional flexibility you have to take orders for next year's capacity, or for next year's production and installation, given that from a backlog standpoint you already appear to be in very good shape at this point in the year?
Alexander Kara
executiveYes. Thanks for the question. We'd say 25%, EUR 1 billion, that sits in backlog. What isn't in there is clearly East Anglia THREE Hertel order, in and out order, which adds its contribution, and beyond that we can also book further orders — the question being whether something is coming that generates revenues for next year. Still, we have room to take additional orders, especially on the AC offshore cable side. But coverage is good so far.
Akash Gupta
analystMy last question concerns cash flow. If we examine the first 3 quarters, cash flow has indeed been negative, though I suppose that isn't a big surprise. Still, as we look toward the remainder of the year, and particularly regarding milestones or down payments on projects, what net debt level ought we to aim for by year-end? If you could provide any ballpark range, that would be great.
Line Andrea Fandrup
executiveMy suggestion for assisting you is to examine Q4. Historically, correct, and typically we witness stronger results, and that certainly also applies, shall we say, to how we handle the cash collection milestones, all of it and even more aggressively as the year draws to a close. So that, I believe, is the approach to take regarding the cash.
Operator
operatorAnd our following question is from Massimiliano Severi, who is on the line from Credit Suisse.
Massimiliano Severi
analystThat's more of a general question. So what are you seeing, and when do you think the first 525 kV submarine extruded orders might come through, particularly given that TenneT has launched the <<inaudible>> for this technology?
Alexander Kara
executiveRight, as you mentioned, and in fact TenneT has ended up with 5 offshore wind projects in the Netherlands. So in all likelihood this will be the first — one among them will be the initial offshore wind that we see. A tender process is currently underway. And yes, we have to wait and see when the award happens. In the Netherlands there are certain questions regarding environmental impact, which raises some concern over whether that could cause a delay in these orders, but we will need to find that out — this arose only recently, so it is too early to tell.
Massimiliano Severi
analystAlso, on the interconnection side, do you typically see interest there as well? Or at this point is it mainly TenneT, with its 5 offshore wind projects for the 525KV technology?
Alexander Kara
executiveNo — interconnectors exist in the U.K. as well, and a number of them are under discussion. To be more precise, we are tendering for 525KV Western aisles, which was initially 300KV DC and has been changed to 525KV on the East Coast, and in the U.K. several projects are under discussion at 525KV DC. So this will come — it will come soon too — I mean soon in the sense of an award, not necessarily in terms of production and execution.
Operator
operator<<operator_script>> To the speakers: we have no more questions at this time. At this point I'd like to turn the conference back to your primary speaker for today, Alexander Kara, so he can offer closing remarks.
Alexander Kara
executiveYes. All right. Thanks a lot for those excellent questions, and I hope everyone has a great day. We'll speak with you again shortly. Goodbye.
Operator
operatorThat brings today’s conference to a close. Thanks for joining us. At this point, everyone may disconnect. Have a good day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete NKT A/S transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to NKT A/S earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in NKT A/S or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.