executive
#1

Thanks, Operator. Hello, everyone, and welcome to Oklo's 2024 Third-quarter Company Update and Earnings Call. Joining us today are Jake DeWitt, Oklo's co-founder and Chief Executive Officer, and Craig Bealmear, Chief Financial Officer. Oklo's Q3 earnings were released after the market closed today. You can find the shareholder letter and supplemental slides on the investor relations page of our website. The information we discuss during our remarks and the Q&A session that follows includes forward-looking statements reflecting our current views of existing trends, and these are subject to a variety of risks, assumptions, estimates, uncertainties, and other factors that could cause actual results to differ materially from such statements. We ask that you review the forward-looking statements section of our shareholder letter and supplemental slides with care. A discussion of the risk factors that might lead to such differences appears in our latest SEC filings. Oklo undertakes no duty to revise these statements, whether because of fresh information, later events, or any other cause, unless the law demands it. At this point I'll hand things over to Jake DeWitt, Oklo's Co-founder and Chief Executive Officer. Jake.

Jacob DeWitte

executive
#2

Thanks, Sam, and I appreciate everyone being here today. We're glad to share this quarter's update and give you some perspective on what Oklo has accomplished during the past quarter. Oklo came into being in large part from the belief that advanced nuclear technology represents a major opportunity. What we saw was an industry that had become dramatically stagnant, and there was a huge need to reconsider how a company might go about bringing new nuclear technologies to market. Oklo has begun seizing that opportunity and carrying out our mission of delivering clean, reliable, and affordable energy worldwide. Moving to the next slide, slide four, over the last quarter big tech has made substantial and wide-ranging commitments to nuclear as the technology they choose to power their AI ambitions reliably and affordably. The agreements involving existing nuclear facilities — Amazon with Talen and Microsoft with Constellation — show the appetite for reliable power access. Such deals have been instrumental in setting a price for baseload low-carbon electricity, with some anticipated at or above $100 per MWh, which backs up our conversations with both current and prospective customers. The small reactor agreements announced by Google with Kairos and Amazon with X-energy likewise show that big tech is prepared to make long-term bets on new nuclear technologies to power future operations. Earlier this year Oklo signed a comparable strategic partnership agreement with Equinix covering 500 MWs of power. Equinix also provided a $25 million prepayment to the company for power. In our view, the Equinix deal along with other small reactor deals offer a helpful roadmap for how Oklo plans to partner with data center customers going forward. On slide five, Oklo stands apart from many conventional and advanced nuclear competitors, since our business model is to build, own, and operate our powerhouses and give customers what they want: reliable, low-carbon electrons. This graphic from the Department of Energy's Advanced Nuclear Liftoff report illustrates the difficulties involved in bringing large nuclear projects to market. Big projects carrying multi-billion-dollar price tags need risk and cost sharing among multiple stakeholders and customers who don't necessarily want to take on those risks. Reactor technology companies sell partially complete reactor designs and require others to finish the design for them, in addition to funding and constructing those assets. Oklo's technology is small and scalable, which lets us build, own, and operate the plants in a sequenced manner expected to lower risk for all stakeholders; this value proposition resonates strongly with current and prospective customers. It's worth noting that this graphic doesn't mean Oklo will handle everything on its own. The company is cultivating relationships with key strategic partners throughout our value chain so we can bring our product to market. Our deal with Siemens Energy is a good illustration of what our value chain partnerships can look like. Moving to slide six, the nuclear industry keeps getting robust backing from every level of government. During this third quarter, the nuclear fuel segment drew considerable funding to build out the infrastructure needed for supplying high-assay, low-enriched uranium, or HALEU, and at COP29 there was a heightened commitment, with 31 countries adopting goals aimed at tripling nuclear energy capacity by 2050. On slide seven, we spotlight our strategic approach. Three core pillars anchor our strategy, and we believe these put us in position to transform how nuclear power gets delivered to customers. We pursue a different path when it comes to the business model, plant size, and technology, since we view these as essential levers for unlocking an enormous share of nuclear's potential; on the business model side, ours is built so customers can easily purchase clean power at scale; we pair that with a small reactor size, which lets us achieve greater capital efficiency as a company and match customer demand incrementally, while providing resilient and redundant power solutions to our customers. And all of that is paired with our technology, which draws on centuries of combined experience in technology possessing economic and operational advantages owing to the characteristics of liquid sodium coolants. On slide eight, we present what we shared last quarter when we set out our framework for keeping the market informed about our progress, chiefly across six major areas. Those cover reactor licensing progress, project execution, fuel fabrication and recycling, customer pipeline development, strategic partnerships for corporate and business development, and financial updates. So moving on to slide nine, we'll show where we achieved meaningful progress during the third quarter. We carried on our NRC engagement for reactor licensing and locked in key DOE agreements for project execution at the Idaho National Laboratory, among them environmental compliance permits from the Department of Energy. Our fuel fabrication work got a boost from DOE's approval of the Conceptual Safety Design Report for our Aurora fuel fabrication facility. On the customer front, we signed letters of intent with two major data centers for up to 750 MWs of power. We additionally signed a letter of intent to acquire Atomic Alchemy for radioisotope production, and on the financial side, we carefully managed cash burn and operating expenses in support of sustainable growth. Going to slide 10. With respect to our regulatory and permitting progress, we aim to submit our Combined License Application for the Idaho project next year, along with several follow-on applications inside a year's time frame. To streamline licensing, we are front-loading NRC review via extensive pre-application work, targeting a review timeline of roughly 24 months once submitted. The ADVANCE Act delivers significant cost and time advantages for permitting, and we are actively engaged with the NRC to optimize our timeline and maximize benefits as the act takes effect. This includes refining our initial application to facilitate maximum carryover from our 15 MW to 5 MW designs. What matters greatly is that when several assets sit together at a single location, the ADVANCE Act speeds up deployment, and that fits nicely with how we aim to serve customers at one site. As I noted, we expect a 24-month review period with the NRC before securing approval for our first site. While that application is under review, we'll also push ahead with site preparation and probably kick off certain construction work at the same time. Our first reactor should come online in late 2027. Turning to slide 11, we lay out the regulatory advantages of our integrated build, own, operate model. In our view, this model and our licensing approach take advantage of a streamlined regulatory path toward a combined license, which lets us obtain every approval needed to construct and run a commercial plant in a single step. Some others in the space, including our peers, go after separate construction and operating permits, or design certifications followed later by combined license applications — we instead go straight for a combined license. That fits our ownership model, since we build, own, and operate our powerhouses instead of selling designs or licenses that are only partially complete. On top of that, the first combined license serves as a reference license for our COLA, so we can file later licenses, or S-COLAs, focusing only on what has changed from the original.

Jacob DeWitte

executive
#3

Keeping those differences to a minimum gives us substantial efficiency gains, which means faster licensing for every added plant. This approach doesn't just simplify things — it speeds up how quickly and effectively we can deploy plants. Turning to slide 12, we lay out our regulatory paths and where permitting stands. To recap, a custom combined license such as the one we're pursuing brings clear advantages when your business model involves building, owning, and operating the plant. Under this approach, every regulatory review — siting, design, financial, environmental, operational, and security requirements, plus state and local considerations — is expected to wrap up within one comprehensive 24-month application. After approval, you hold a full license to build and operate. By contrast, alternative regulatory pathways and business models call for multiple steps and take longer to reach operational status; a design certification, for example, only validates certain aspects of the design itself and still demands further multi-step, multi-year reviews before an operating license is granted, including considerable remaining regulatory work needed to obtain that license. Design certification also reduces flexibility — a challenge frequently raised in reviews of lessons learned from the Vogtle experiences. That can mean additional regulatory review through standard design approvals or comparable routes. Although a design certification can be helpful when customers are prepared to accept that back-end risk, it is wholly optional and functions mainly as a risk management step; it's worth stressing that a significant difference exists, then, between securing a design certification and obtaining an operating license; we keep making substantial progress toward receiving a combined license, and our customer pipeline development increasingly demonstrates the advantage of this approach. Next, on slide 13, we'll discuss our siting advancement for the Idaho powerhouse deployment. This slide highlights the multi-step regulatory process needed for siting approval with the Department of Energy at the Idaho National Laboratory for our plant there. As you can see, DOE permitting involves several distinct stages, among them environmental analysis, site preparation, and various agreements covering access and services. I'm pleased to report substantial progress this quarter on two key milestones. First, we finalized a memorandum of agreement with the Department of Energy, which grants us access to conduct site investigations. That's essential for carrying out assessments, environmental surveys, and geotechnical studies, clearing the way for smooth site preparation. Second, we secured an environmental compliance permit, confirming no significant environmental impacts exist, which lets us proceed with the characterization phase. These achievements represent critical steps on our journey toward full siting approval and bring us nearer to construction readiness for Oklo's first powerhouse at INL. Moving to slide 14, I'm also excited to share that the Department of Energy has approved Oklo's Conceptual Safety Design Report for the Aurora fuel fabrication facility. Getting this approval marks an important regulatory milestone for putting our fuel fabrication facility into service and for moving forward with our aim of using recovered nuclear material to fuel the first commercial Aurora powerhouse. Reaching this milestone brings us one step nearer to making our fuel fabrication capabilities a reality. With that, I'll hand things over to Craig for updates on customer development.

Craig Bealmear

executive
#4

Thanks, Jake. Turning to slide 15. In line with what we said last quarter, customer interest has risen considerably since we completed the business combination with AltC in May of this year, and all of that is feeding a growing customer pipeline. Oklo has kept advancing additional letters of intent with customers, among them new non-binding letters of intent signed with two major data center providers, covering as much as 750 MWs of power. For commercial reasons in this case, both counterparties view our stage of activity as commercially sensitive, so they have asked that we hold back their names until some future point. Now to slide 16. As a reminder, when we announced the merger with AltC, we noted that more than 700 MWs of business had been signed across a mix of memoranda of understanding and letters of intent. Since then, we have issued new announcements in the data center market sector with Equinix and Prometheus Hyperscale, plus an announcement with Diamondback Energy in the oil and gas sector. Together with the two LOIs I mentioned earlier, our total level of signed agreements now stands at 2.1 GWs. We are already working to put our first set of power purchase agreements in place. Although we are actively trading term sheets and PPAs, it is important to note that our focus is on the quality of commercial terms rather than speed, so we have optimized pricing that may be linked to fuel price, confirmed location given its impact on cost, partnered with the right customer as we deliver first-of-a-kind projects, assessed the opportunity for investments in Oklo at either the asset or corporate level, and ensured access to other intangibles, such as access to their supply chains to support asset deployment.

Jacob DeWitte

executive
#5

Thanks for that, Craig. Turning to slide 17, we're really excited to share that, with backing from our board of directors, we've made the decision to bring Atomic Alchemy fully into Oklo through an acquisition. The two companies share a long history. When Atomic Alchemy was founded back in 2018, I helped venture capitalists with due diligence so they could grasp what potential radioisotopes held. Over the years we kept in close contact with Atomic Alchemy, and we formed a strategic partnership announced earlier this year that focused on supporting technology and market sector advancements. That effort has shown us there are huge overlaps between our technologies and how we run the business overall, and we think we could gain more momentum on market and technical progress if Atomic Alchemy belonged to Oklo. Before I get into the deal's details, let me cover some fundamentals about radioisotopes. Radioisotopes are radioactive elements. These essential materials are being used more and more in cancer treatment, diagnostic imaging, space exploration, industrial processes, and even advanced semiconductor manufacturing and fabrication; even so, the U.S. does not have a strong supply chain to support these critical resources. Atomic Alchemy has created proprietary reactor and isotope production technologies for making radioisotopes, and these can use unique nuclei obtained from nuclear fuel recycling processes for fast reactors as well as from existing used nuclear materials. Electricity can be generated by Oklo's fast fission technology using recycled fuel, and that process can also yield valuable co-products like radioisotopes. With the proposed acquisition, Oklo intends to incorporate radioisotope production into its fuel recycling process, which would create an additional revenue stream and bolster the U.S. radioisotope supply chain. Our work completed under the previously announced MoU between Oklo and Atomic Alchemy has validated the technology opportunity here. Turning to slide 18, Atomic Alchemy is an innovative leader in radioisotopes. Atomic Alchemy came into being in 2018 with early backing from Y Combinator, and it introduced a novel method for making radioisotopes—one meant to tackle worldwide shortfalls and create a dependable homegrown supply chain for the isotopes that matter for saving lives, cutting-edge industrial uses, and national security. The company has created its own VIPR reactor technology, which is intended to establish fresh benchmarks in efficiency, scalability, economics, and ease of operation when it comes to producing radioisotopes. Atomic Alchemy has hit major milestones across design, engineering, licensing, and permitting on the path toward first deployment of its VIPR reactor facility. In addition, Atomic Alchemy has assembled a strong pipeline of suppliers and customers to underpin commercialization of its operations and products. An engineering group of high caliber located in Idaho Falls is leading this effort, and that group collaborates closely with the Idaho National Laboratory and the Department of Energy. Slide 19 shows radioisotopes becoming a strategic national priority across numerous nations. A growing number of countries now view radioisotopes as strategically vital nationally, because of how much they matter for medical, defense, aerospace, and semiconductor sectors. By 2026, China aims to generate $55.7 billion in economic output from radioisotopes, and the country is funding this strategically, in much the same way it did earlier with renewable energy technologies and rare earth elements. On top of that, the United Kingdom is taking steps as well to make sure its own domestic supply of radioisotopes keeps pace with demand. With that, I’ll go ahead and turn things over to Craig, who will discuss the specific transaction in more detail.

Craig Bealmear

executive
#6

Thank you, Jake. Turning to slide 20, the biotech industry has seen a number of deals worth multiple billions involving radiopharmaceuticals, which shows there is market demand for radioisotopes — the main input used in radiopharmaceuticals. Atomic Alchemy and Oklo aim to become a leading supplier to this industry as other facilities that produce radioisotopes reach the end of their operational life, which cuts supply. On slide 21, I'll share some acquisition highlights. Atomic Alchemy will generate meaningful value for Oklo shareholders by increasing the worth of our technologies and by operating as an appealing standalone radioisotope business. We view this as a very appealing bolt-on purchase at a fair price, and it provides us with a distinctive enabler and launchpad for moving into the radioisotope sector, which is going to be a co-product of the fuel recycling operation we run. The deal's key points are these: technology that fits well together. Radioisotope technologies have the potential to greatly enhance the economics of nuclear fuel fabrication and recycling by generating co-product sales of radioisotopes with high margins. Vast market demand alongside dwindling supply. By 2026, the radioisotope market is projected to surpass $55 billion, and we think the sector could grow quickly; on top of that, aging radioisotope facilities are producing severe supply shortfalls for critical applications throughout numerous industries. Third, we see a varied set of revenue opportunities. Oklo's reactors are going to generate radioisotopes as a valuable byproduct of the process it uses to recycle fuel, which lets the company earn revenue from those byproducts as well as from existing used fuel. Fourth, growth opportunities. We're forming joint ventures with customers around radioisotope applications, and that includes radiopharmaceuticals and silicon doping for making next-generation semiconductors. And finally, we think this deal gives us an appealing transaction structure. The $25 million acquisition is going to be paid for with stock, priced off Oklo's 20-day average closing price most recently recorded. Every share issued to Atomic Alchemy carries lockups of one to three years, and there are no mechanisms for early release. We expect definitive agreements to be signed in early December, with a target close in early 2025. Oklo anticipates no significant short-term rise in operating expenses stemming from this acquisition. We're very enthusiastic about everything Oklo and Atomic Alchemy can accomplish jointly by advancing innovation across many areas in what we view as a highly synergistic deal. I hope it's evident that this acquisition will generate substantial value for Oklo's shareholders. Turning to slide 22, I'd like to go over lockup and earn-out triggers. Oklo has satisfied every triggering event we referenced on our prior quarterly call, and we'd like to spend a moment reviewing them. The first significant development is that on November 5, 2024, a 180-day lockup restriction was lifted for certain investors, allowing them to sell shares on the open market. Those investors were two early-stage venture capital firms that had previously served on our board. Their holdings came to roughly 13.5 million shares. The second significant development is that the time- and price-based lockup restrictions applying to the AltC sponsor and Oklo insiders have now all expired as of November 13, 2024. About 41.3 million shares had lockups tied to both time and price. As the table indicates, 40% of those shares unlocked after Oklo's stock closed at $12 on 20 of 60 trading days. There's also a second tranche: 30% became available once the stock closed over $14 across 20 out of 60 days, and the last 30% vested at the $16 threshold, again requiring 20 of 60 days. Additionally, as part of the business combination, roughly 15 million earn-out shares went to existing Oklo investors and employees who held shares and vested stock options at the close. Those earn-outs had price triggers too. According to the table, half of the shares vested after Oklo's stock closed above $12 on 20 of 60 trading days. Approximately 33% vested upon a close above $14 for 20 of 60 days, while about 17% vested at the $16 trigger, likewise over 20 of 60 days. Each of our two co-founders decided to give up 300,000 earn-out shares, and an equivalent count of restricted stock units could be granted to selected employees through our 2024 equity incentive plan. Looking at the table on the right, you can see how our capitalization overall has shifted. We ended the second quarter with about 67.2 million shares in our tradable float. When the 180-day lockup restrictions were lifted on November 5th, 2024, that added 13.5 million shares to the tradable float. Unlocked sponsor and Oklo insider shares brought 41.3 million shares into the tradable float. Earn-out shares added 14.7 million shares to the tradable float. With lockup expirations and earn-out shares combined, Oklo's tradable float and total capitalization come to just under 137 million shares. Now on slide 23, a financial executive summary. Year-to-date, Oklo's cash use and operations stand at $24.9 million, consisting of a net loss of $63.4 million, partly offset by $38.5 million in non-cash impacts. The year-to-date operating loss of $37.4 million included a one-time fair market value adjustment of $7.8 million tied to earn-out shares payable to Oklo staff who held vested options when the deal closed. At the close of the third quarter, cash and marketable securities totaled $288.5 million, mainly reflecting the $276 million in proceeds, net of fees, received at deal closure. For the entire year of 2024, we continue to anticipate an operating loss matching the earlier forecast of $40 million to $50 million that was shared in our Super 8-K filing. Turning to slide 24, once our third-quarter 10-Q has been submitted, we’re eager for a number of investor gatherings as the year winds down — among them Scottsdale, New Orleans, and New York, along with multiple virtual sessions. As a final point, why Oklo? In our view, six elements make Oklo an especially attractive investment opportunity. First, the technology it employs is built on a fast reactor design already proven in practice, and we intend to deploy it at scale, allowing us to reduce complexity, bring down costs, and compress delivery schedules. Second, we have an appealing business model, one that puts customers first and supports recurring revenue along with profits. Third, the economics are strong, with the goal of delivering power at a levelized cost of energy that is highly competitive. Fourth, our customer base is varied and expanding, with interest spanning six market sectors. Fifth, we take a streamlined path to regulatory approval, supported by our combined licensing application process, which draws on many years of experience from our work with the NRC. And last, a well-capitalized balance sheet leaves us positioned favorably to carry out our business strategy. During the last twelve months, the worldwide discussion appears to have moved through three stages: first questioning the rationale for nuclear, then wondering why it shouldn't be pursued, and at present demanding nuclear without delay. In our view, the six items I listed position Oklo well for this period in which nuclear is wanted immediately. Having said that, I appreciate everyone's attention. Jake and I will now take your questions.

Ryan Pfingst

analyst
#7

Hi, everyone. I appreciate you taking my questions. For my first one, I suppose: have the recent announcements from the tech giants led to greater customer interest in Oklo? And is it maybe accelerating some customer discussions? And when could we expect the first contract conversion from an LOI to a PPA? That's a few things in there, but I appreciate it.

Jacob DeWitte

executive
#8

Yes. Thanks. That's a great question; this is Jake, by the way. I believe it has sped up. I think we've witnessed a steady pace of acceleration—I should say a steady rate of acceleration—really for some time now. We essentially established the market benchmark with that announcement—or rather, through our partnership with Equinix for 500 MWs, which carried their $25 million prepayment earlier in the spring—and since then we've observed steady advancement. With the Microsoft-Constellation deal now announced, followed by Google and Kairos, and the AWS X-energy deal, there's clearly an accelerating pace and rate of growth taking place. What I believe is shifting the sentiment, however, is a growing acknowledgment that power ranks among the largest constraints on data center buildouts. Nuclear—particularly what we bring in terms of business model, our sizing approach, and siting flexibility—unlocks substantial capabilities and adaptability for data center development as companies consider their scale and their plans for scaling. Beyond that, if we consider one signal of what to expect going forward: there are plenty of striking figures regarding electricity demand, yet what semiconductor manufacturers are turning out appears to back that up, perhaps functioning as a leading indicator, correct? They perceive enough there to put money in and manufacture, and to sustain where these power levels are heading. So it's quite an exciting—I mean, honestly, it's just a wildly exciting period. Frankly, I doubt there's been anything quite this dynamic in electricity generation worldwide since electricity first came into use. That's clearly happening, and even so, all of it generates plenty of valuable momentum for establishing durable strategic alliances with the people we serve. We're watching that expand and develop. Because of this, when it comes to our Aurora design PPAs, speed isn't really the point — there's no need to hurry into them. What matters more is forging the appropriate partnerships and structures for those customers, and identifying the right ones to proceed with. On top of that, as things unfold, I believe we're gaining a clearer picture of what nuclear power's real market price actually is. As Craig mentioned during the presentation, clear signals are for $100 or more per MWh, and we anticipate that will persist and hold up moving forward. What we're deliberately doing is making sure we build the strongest possible partnerships with the strongest possible partners to advance that, rather than rushing straight into PPAs, especially given all the other factors at play around deployment, and also nurturing those relationships so they can deliver more potential added value to the whole business as far as we're able. So I'm not sure, Craig, whether you'd like to add something given a few of the factors surrounding that, but that's roughly how we see some of those factors developing.

Craig Bealmear

executive
#9

No, Jake, I think you nailed it.

Jacob DeWitte

executive
#10

Also, one point I’d like to make: as we said yesterday, we made those announcements about the agreements and the partnership deals. Folks are eager to move fast, and there’s plenty of exciting activity going on. One thing we’re really seeing is solid validation of our differentiated approaches, or of our business model, and our advantages in time to market. All of that is coming together to support those efforts in being more helpful for near-term power deployment, which is also quite exciting to watch fall into place.

Craig Bealmear

executive
#11

Jake, perhaps there's one thing I'd add. Having the data center customers in our order book is great, but we're also very glad that our order book is diverse across a number of other market sectors too.

Ryan Pfingst

analyst
#12

Understood. Thanks for that, guys. Moving to my second question, I'd like to hear your big-picture view on how the shifting political environment could impact nuclear as well as Oklo's specific opportunities.

Jacob DeWitte

executive
#13

You mean the overall competitive picture for nuclear? Right. Nuclear clearly has solid backing from both parties, but with the administration changing, do you anticipate any extra advantages or shifts? Right. So here's what I think we're seeing — as you mentioned, support has clearly come from both sides, regardless of whether it was going to be a Trump or Harris administration and a Democrat or Republican Congress. What we've observed, I'd say, is that backing for nuclear keeps climbing across the board, honestly, from one administration to the next to the next. I believe there's considerable emphasis on ongoing regulatory modernization efforts ahead, which I'd expect to be especially helpful in enabling more new nuclear, and faster. I'd also expect some evolution. Naturally, that hinges on several factors, but among the various support mechanisms available, since nuclear enjoys strong bipartisan backing, I think whatever adjustments or changes come about with the Inflation Reduction Act or similar structures out there, that backing for nuclear will persist; having said that, it all depends on what unfolds, correct? Still, when you follow the news, it's conceivable that some of those benefits could be trimmed for generation sources that aren't nuclear. So I think that would somewhat reshape the implications and dynamics in response. Another piece of this, in my view, is that we're seeing some intriguing developments around gas-fired power generation. I genuinely believe there's substantial opportunity in pairing gas with nuclear that will come into play for data centers — essentially gas serving as a bridge to nuclear; so I think some compelling opportunities will keep surfacing there. Ultimately, though, we view nuclear policy overall as quite constructive right now, likely with a strong emphasis on regulation as well as on broadening and speeding up the support levels already established.

Ryan Pfingst

analyst
#14

Appreciate it, folks. I'll hand it back over.

Vikram Bagri

analyst
#15

Hello there. Good afternoon, everyone. Thanks for the detailed rundown of what's been happening at the company. I've got two questions — one about Atomic and one about Oklo. Could you discuss how hyperscalers have responded when it comes to reactor size, and your plans for scaling up to 100 megawatts and beyond? Great that you're working through that process; and do you see a chance to grow the pipeline substantially once you've got more specifics and a design finalized for a bigger reactor?

Jacob DeWitte

executive
#16

Yeah. On the size question specifically, I'd say it's fine; it's actually a rather interesting strategic edge thanks to how we've sized things. The way to look at this is that while there are those striking, huge figures out there like, "Oh, data center campuses at multi-hundred-MW." And I believe we'll keep seeing convergence toward the multi-hundred-MW data center campus scale. You have to consider how these facilities get constructed, and that's in a very modular fashion. And the data halls putting these together — what we're hearing from quite a few different customers, and seeing across quite a few different architectures — is a size range that aligns really well with what we offer. We're seeing more of it being offered and matching the 50-MW size; that's why we see that as fueling a lot of the growth here. But that matters because, when you consider these data center campuses as they're built out, it's great to be able to expand step by step alongside them as they scale up and outward on the power generation side. And beyond that, it lets us place multiple units to deliver the right reliability and resilience. That's ultimately pretty essential, particularly given the different dynamics after the FERC ruling and other implications that might exist within local and state-level energy market regulatory paradigms, which could heavily incentivize — really substantially incentivize — near-term deployment and more of an islanded mode behind the meter. Obviously, much of that is still evolving, but even so, having multiple reactors lowers single-shaft risk, and our deployment strategy lets us build up in parallel without having to hang all of that on a bunch of fixed capital to accommodate growing into it. So our sizing is actually very well matched to that, and if you look at the announcements in this space, they've mostly been constructive for new builds of plants in this kind of size range. The good thing then, of course, is our business model differentiation, which is extremely important, making it simpler for people to buy what we're offering. That said, we also see, as you point out, that there are some opportunities to get bigger, and that's always been on our roadmap. Counterintuitively, we don't see the same economy of scale drivers that exist in light water reactor pressurized system technologies. There are certain sizes where costs hit an optimum point—actually, I shouldn't use the term "optima." Instead, there are cost thresholds beyond which you start becoming marginally more expensive because of the bespoke and non-recurring engineering expenses tied to building larger and larger plants—the very issues that affect large-scale mega projects. So we identify a sweet spot that will likely sit above 100 MWs. That will roughly carry through. Still, we're seeing considerable traction. That's why what we've discussed and announced centers heavily on the 50 and also includes support for the 15 in terms of sizing; we therefore observe a fair amount of, I'd say, constructiveness around that size and the full-in power solution we provide. Because you have to consider the complete power solution, not merely the per-reactor power basis. And that's what we find to be quite constructive at the plant level.

Vikram Bagri

analyst
#17

Thanks — that's genuinely helpful. Now shifting to Atomic, I'd like to understand how big this business could eventually get; I realize I'm jumping ahead, but is there some formula per reactor linked to fuel recycling that we ought to bear in mind over the longer horizon, considering the way Atomic scales up with how many installations you have? And looking closer in, could Atomic contribute a standalone revenue stream ahead of the complementary fuel recycling growth with Oklo that you brought up? Related to that, assuming such a stream exists, when do you think we'll begin to see partnerships or a growing pipeline of orders on Atomic's side? Thanks.

Jacob DeWitte

executive
#18

Yeah. No, I appreciate those questions. Vikram, let me take that question. This is a thrilling topic for me, and it partly grew out of our lengthy history with the business. To be honest, it also came from helping many venture capital investors who were examining the company and wanted my perspective, plus the work I've done assisting several medical and radioisotope firms at various stages of maturity and growth. I've been enthusiastic about and interested in this field for a long time. Naturally, we're extremely excited about Oklo's fundamental vision. A technology that could genuinely serve as an ultimate answer for both energy and climate is hard not to find inspiring. However, as we invested more time with Atomic Alchemy, we discovered considerable synergy with our efforts to broaden the fuel supply chains. It's excellent that they can commercialize the co-products from recycling—we won't need to build those sales channels ourselves, and we can draw on their technologies to separate those materials into products we can sell. That removes a burden from us. So a natural alignment exists there, which in many respects is what really drew us in and made this quite compelling. What we view as further opportunities stems from broader developments across the radioisotope sector. The recent announcements we called attention to, from only the past week or two, concerning China treating this as a geopolitical priority and essentially forecasting an impact of more than $55 billion on its economy in 2026, give a sense that massive geopolitical—and therefore economic—implications exist in the radioisotope space. Domestically in the U.S., we are serving this far too poorly, since our dependence has rested substantially on Russia up to now. So a full reinvigoration is underway here. And that clearly shows up on the pharmaceutical side. There's a great deal going on in that space, and it includes some thrilling M&A deals from recent years involving highly promising therapies. On top of that, consider what we've observed from other players in this field, such as TerraPower and BWXT, which we see as opportunities for expansion. This is a large market. If you follow minerals and commodity pricing, this material may come across as fairly opaque, but it ranks among the most fascinating pricing to study, because a number of these elements within these isotopes carry market prices reaching billions of dollars for a single gram; obviously we don't produce that many grams—for some of them, not even 1 gram—yet it is unmistakably a high-value component. So what that looks like is quite exciting; what also matters to point out is that there are possibilities for radioisotope production of the kind we saw with Atomic Alchemy, and we’ll discuss that further, though only a short time after the transaction closes, assuming all of it happens. Certain of those elements are quite interesting in terms of, I’d say, chances to generate radioisotope sales before we have, for instance, our full-scale recycling facilities running and even before those have some of their other facilities running. There are therefore some near-term opportunities we’re quite keen to pursue and investigate, and they’re part of what we find compelling about possibly speeding up revenue streams; so that’s roughly how we view some of those elements. I don’t know, Craig, whether you’d like to add anything, but that covers a few of these points.

Craig Bealmear

executive
#19

Yeah, Jake, the term I'd probably pick is standalone — Atomic Alchemy has capabilities to make isotopes that are near-term and possibly long-term too. And the other piece, I think, is quite complementary. Honestly, it's one of the things that made me excited about Oklo when I came on board at the company a year and a half ago. It's that we've consistently followed a customer-oriented approach when it comes to building and selling power to customers, since that's what they want. And what gets me excited about Atomic Alchemy, I think, is that if the production capability we may have in the near term means we'll have market access in the near term. And as those markets for these isotopes are developing — and I think we're in the early stages of that — with Atomic Alchemy, we can be part of that near-term market development. And then once our recycling business comes online and we'll have additional supply, we'll be positioned that much better.

Vikram Bagri

analyst
#20

Thank you.

Jeffrey Campbell

analyst
#21

I'm having a great time with it as well. Allow me to pose an AA question too. I've been curious whether Oklo's ability to recycle nuclear waste, subject to the dollar, might bring any boost to margin or advantage for AA and its assorted radioisotope uses.

Jacob DeWitte

executive
#22

Yes, I think I addressed a portion of that in what I said, and Craig, please do feel free to jump in too. What I'm getting at is that we see opportunities in how these pieces of the business complement one another when you think about what recycling involves—there are several, let's call them product streams, and in what I'm about to describe, products also cover services to some degree. From a recycling perspective on the business side, you can accept used fuel, and then, in recycling it, you separate it into various constituents. A lot of that material consists of fission products—the byproducts generated by fission itself—along with transuranics blended with some uranium. Those include elements such as americium, neptunium, plutonium, and curium, among others, which are located toward the bottom and right side of the periodic table, plus plain uranium. For each of those products, we see sales opportunities. The transuranic uranium and the uranium portions are what we feed directly as fuel into our systems. Some unused uranium will remain that potentially could be sold into the market, and regarding the fission product side, although many of those are frankly a waste stream, a few high-value radioisotopes are contained in that. So that was part of how the early partnership between us and Atomic Alchemy took shape, which in the end brought us to the question of how you extract those materials, separate them out, package them, and route them into the proper sales channels. The revenue opportunity there is fairly substantial for the recycling facility, and you also get the advantages of consolidating the waste along with everything that comes from shrinking its volume and the other benefits recycling provides. That creates multiple revenue streams. Co-product sales look like a particularly meaningful one to us, since that market is quite clear, right? Radioisotopes trade in the market right now. It's a fairly straightforward opportunity to capitalize on if the alternative is simply discarding this material. So that will certainly help out and bring in extra revenue streams. And look, as we expand further into the recycling side of the business while we grow, we'll be discussing more and more all the various revenue levers that might be available to pull. And what that effectively does is just further assist in bringing down the expenses at those facilities, so to speak, that we ultimately bear on the fuel side. So yeah, there's room to bring costs down even more. That's my somewhat indirect approach to giving someone an answer on that point. Craig, I'm not sure whether you'd like to add anything further there, or if there's something you're interested in exploring in more depth.

Craig Bealmear

executive
#23

Another aspect of the recycling operation I really appreciate—and the reason we say co-product rather than byproduct—is that it will yield materials we'll be pleased to have and to monetize, which is why it's a co-product. Back when I was selling asphalt for BP in Europe, though, that was unmistakably a byproduct sale. What else are we going to do with it? Still, I believe there's substantial margin upside once recycling is up and running. And I think that, now that our deal is complete, we'll uncover all kinds of extra synergy points between Oklo and Atomic Alchemy.

Jeffrey Campbell

analyst
#24

All right, great. That was really useful. Jake, you gave us excellent detail on the COLA licensing process. Just to make sure I understand: do you expect each Aurora application after the first to take that same 24 months, or might it go faster? And if faster, how fast? Also, once the first powerhouse is built and approved, do you think we could apply for several COLAs at once?

Jacob DeWitte

executive
#25

Yeah. Let me take your question in reverse order — we could actually have multiple applications under review at the same time. They don't have to wait for the first one. In fact, we expect to have several applications coming in fairly quick succession after our first one is submitted, and even before that first one gets issued. That's a key strategy for us, because it lets us scale up elements and scale up deployment across the business. So to put it simply, we don't need the first one approved before we submit more. And there's some timing advantage to having a staggered, parallel review running for those later applications. That said, the real benefit, getting to the first part of your question, is on those later applications; this is one of the features built into the regulations that's genuinely exciting, something that was kind of envisioned for this repeatable deployment model that we may be among the first to really take full advantage of. It's that reference license, subsequent license dynamic. In other words, the first plant you get a license for becomes your reference combined license. Your second, third, fourth, everything after that can become the subsequent license that references that actual first reference license; and the NRC, just within the last few months, put out a white paper laying out subsequent high-volume deployment pathways using this approach, where they projected total review times for those later licenses could come down to seven months. So from submission to approval in as little as seven months. I mean, that's a game changer, not just in nuclear, but that's faster permitting for pretty much anything in energy in many ways. And that's pretty dang exciting, frankly. And that's what we've been building towards; we'd heard numbers ranging in those levels, but it was really exciting to actually see some clear things come out about how that could be achieved. Again, I mean, there are aspirational aspects to that, and that's not what we're going to realize on our second wave of applications necessarily. But I think we expect significant acceleration in that second wave and maybe even hitting those numbers by the time we kind of hit our stride later in that second wave into the third wave. When I say waves, I'm referring to sending in applications once we've mostly had that initial one either approved, or approved along with the ones that sort of follow it; so we notice some acceleration gains fairly fast, and then some considerable acceleration gains further out.

Jeffrey Campbell

analyst
#26

That's genuinely excellent. It makes that huge pile of LOIs you're holding feel a lot more concrete, so I appreciate it. Thanks.

Max Hopkins

analyst
#27

Hi, everyone. A lot of my questions have already been covered, but on the construction front as well, what's the timeline for groundbreaking in Idaho, I suppose? Clearly, that was announced last week or a few weeks back. And along with that, are there particular siting concerns — earthquakes, water, accessibility, and so on — across all the sites you're considering that might end up altering how you site things?

Jacob DeWitte

executive
#28

Yeah. Broadly speaking, it hinges somewhat on different factors — the specifics of the regulatory review plan and all those other particulars. But we expect there to be chances to break ground as early as 2026 for that Idaho plant. It hinges on a few factors we'll need to optimize for, for all the reasons you have to do that from a project and asset management optimization standpoint. But that's when we'd anticipate being able to do so. Broadly speaking, one key point is that, given how we're approaching the plant and the nature of how you think about what falls inside the safety envelope and what doesn't, and similar matters, there are elements that let you carry out a great deal of parallel development and construction while the license is under review, within the proper scope and bounds, of course; but that's something we can leverage to deploy things accordingly. The other dynamic regarding where we stand in Idaho is — we laid this out in the slides — there are many steps to move this toward full build-out, since this sits on DOE land, which is great because it's well-understood land. We have access to it, and we get fuel with it, right, as part of — I mean, not with it, but we get fuel there too as part of what we received in 2019 through the site use permit as well as the fuel award. Having said that, we must follow, obviously, the DOE regulatory protocols for that facility to get the site ready, and then also the NRC regulatory requirements that are part of the ultimate license to build the plant and switch it on to operate commercially. That's how all these things are moving forward. Broadly speaking, just to return to that, these sites are extremely well characterized because this is on the Idaho National Laboratory. We're not far — frankly just down the road — from where there's already an operating reactor, or two operating test reactors, and where EBR-II ran before; so all this land is well characterized, and that's one reason we like it. Clearly, more effort is needed before we're fully into build and all the rest of it, yet that work keeps moving quickly, and we're quite excited about how far things have come, and we recognize that partnering with the government on land that is already well-characterized and understood provides some built-in risk mitigation.

Max Hopkins

analyst
#29

Thanks; and then I suppose a sort of follow-up to that is these announcements coming from competitors — they're sort of thermal neutron as opposed to fast, whereas you guys have fast neutron reactors. Are you seeing slower progress, or I guess customers raising questions, given your fast neutron reactor type and the potential, I guess, for greater proliferation from that technology? Is that something clients worry about? And it could be potentially dangerous in that sense.

Jacob DeWitte

executive
#30

Yeah. It is not. I mean, this is among the great things about fast neutron technology. So okay, let's just sort of go through a quick history on a few of these pieces, right? To start with, fast neutron reactors were originally looked at because they hold a lot of promise for fuel efficiency, right? With slow neutron reactors — that's just down to what takes place, right — neutrons come out of fission fast. That's simply how it is. So in slow neutron reactors, you make them slower so they're simpler to capture, meaning you need less fuel to keep running. Yet you can't get that much energy out of the fuel, since slow neutrons are much simpler for fission's own byproducts to intercept, such as those fission products, along with other materials inside the reactor and all the rest. They're also not particularly good at splitting very many isotopes — really just a handful of fissile isotopes. As a result, you end up with significantly less energy, and you become much more vulnerable to major challenges on the fuel side regarding your capacity to operate for longer periods and even to recycle. That is not achievable in a slow neutron reactor. Within a fast reactor, those neutrons are not decelerated. Although additional fuel is required, you now gain the advantage of enabling far superior material choices that cost less, perform better, and are simply more durable. You also possess the capability to be comparatively unaffected by these types of fission products, and to genuinely fission a considerably larger share of the actinide, which means you can truly recycle fuel and obtain substantially more energy overall, correct? To put it in terms of a single metric: consider today's reactors, or the majority of slow neutron reactors — how much energy do they actually extract from the uranium taken out of the ground? Since enrichment is required, and some uranium is left aside during that process, once you factor everything in, you end up capturing just 1% or less of the total energy contained in what was mined. A fast reactor, by contrast, lets you extract — you can access over 90% of that energy content. That means enormous fuel savings over the long term and economic efficiencies, plus it frees you from constraints on fuel availability. Turning to safety, there's another key point worth noting. Fast neutrons are systems that are tightly coupled neutronically. What this means is that you get systems that are very robust and very stabilizing, as long as you design them to take advantage of those characteristics. This has been accomplished before, and it's one of the only — really it's the sole technology in the U.S. that has genuinely demonstrated these capabilities in a comprehensive safety manner. Regarding proliferation, look, no commercial fuel has ever been used, nor plant fuel, from a proliferation standpoint. Fast neutrons are in fact much better at consuming things such as plutonium and transuranics than thermal neutron reactors are. So there aren't inherent proliferation-type challenges specific to fast reactors relative to other options, at least as I see it, just based on what the physics tells us. Honestly, those materials are quite anti-proliferative, and that's one of the appealing aspects of the kind of recycling we can perform — something only possible with a fast reactor. Specifically, we can keep every transuranic element, plutonium included, blended and commingled together, so it truly isn't usable in any direct way. Then you put it into a reactor and simply burn it like that, with no need for additional steps to further refine and purify pure plutonium — which is exactly what any thermal-reactor recycling approach requires. And even with all that, you still hit limits on what can be achieved. I've gone on at length here, but the reality is that from a technology standpoint, we believe ours is quite competitive — at a minimum, and frankly, it's simply a better solution on many fronts, backed by a long track record of maturity. That's the reason we're seeing so many opportunities: we have a flexible customer base and a varied customer order book that we've clearly talked about and disclosed, totaling 2,100 MWs so far. So there's a lot of exciting activity there, with solid validation on that side; but look, different kinds of technologies and approaches come with plenty of distinct features. And we think this market is enormous, so there will likely be more than one winner. What works in our favor is that ours is the sole non-light-water technology to have actually shown these kinds of traits and abilities. In many ways, it's also the only one with an operating track record that has beaten light water reactors in service — on capacity factor and availability factor. Every other next-generation concept still has much more to do before reaching that point, so we believe that aspect carries substantial value. And it isn't merely about reaching a stronger position a few years down the road — as if to say, "Oh, we'll build some plants, and that will be wonderful." Look, when it comes to the fast reactor and recycling side, this technology has already been demonstrated and proven at a fundamental level, and it can draw on known harvestable heavy metal resources on the planet and supply all of the planet's energy needs for billions of years. I mean, yes, actually getting there is going to require a lot of work and a lot of things, but we know the physics is on our side. It's easy to get excited by that and to feel pretty good about it; and that's part of why we like this approach.

Max Hopkins

analyst
#31

Great. That really helps a lot. I think it clarifies quite a few things for many of us. So thank you, Jake.

Craig Shere

analyst
#32

Good afternoon. Appreciate you taking the questions, and congratulations on those very positive announcements. First question from me — if I've got this right, when you look out toward the later portion of this decade and into the early 2030s, fuel recycling will ultimately require what could be a fairly sizable external capital raise to fund that work. Do you think the AltC acquisition combination helps boost prospective low-risk project finance for an effort like that?

Jacob DeWitte

executive
#33

Alright, I’ll begin briefly, and Craig, please jump in whenever you like. What we’re seeing with recycling is, first, that we view it as a major catalyst and enabler for growth and for margin improvement. It isn’t something we must do in order to survive. It’s simply that, look, if we’re able to cut our fuel costs by more than 90% or so, that’s quite compelling—not to mention adding further revenue streams and similar pieces. But as we structured things when the transaction, the SPAC process with AltC, went through, and in how we thought about the capital retained from that and everything else, the focus was on getting our first plant built and beyond, knowing that the recycling part of the story we really didn’t try to capture either in the valuation portion of it or really in the core elements of that, because you won’t see some of those benefits until a bit later. So we believe there’s a lot of upside still there to be, I’ll say, potentially tapped into. Accordingly, as that matures and comes together, yes, there may be opportunities where we return to market to support what that looks like, but that will be largely supported by the additional growth that comes from that accordingly. Part of why we see some synergies with, for example, Atomic Alchemy is that it helps prove out and verify some of those radioisotope sales channels accordingly, so that there are some offtake examples that can be used to help support the economic case for why we would do that and then the according value add that we think can be made accordingly. That’s how I think we think about some of those dynamics. I don’t know, Craig, whether you want to add anything on that front, but that’s kind of how I see it.

Craig Bealmear

executive
#34

Yeah. I guess the sole point I’d tack on is that, in my view, the recycling business carries essentially three value streams. First, there’s the benefit it delivers by lowering fuel expenses. Second, there’s a chance we could collect rent from storing the spent fuel that requires recycling. And finally—though by no means least important—there’s co-product manufacturing of the isotopes. And once we gain a clearer picture of how that recycling business would build up after all the effort we’re undertaking with the DOE, I believe it will be; we’ve consistently described that as a distinct fundraising event for the company, yet I think we’ll have plenty of value sources to cite that, hopefully, ought to provide considerable optionality regarding the fundraising, including possibly project financing. Great.

Craig Shere

analyst
#35

Thanks. My next question is a bit compressed, but it has three parts. When you look across data centers, oil and gas, industry, and military, how are you thinking about the blend for your first 5 to 10 powerhouses? Do you want to deliberately diversify that mix rather than concentrate on any one industry or counterparty that might currently be paying a higher PPA price? And last, how do you picture the mix across the first 5 to 10 deployments, roughly as you see it today, between the 15 MW and 50 MW applications?

Jacob DeWitte

executive
#36

Yeah, as I was beginning to say, I believe having that diversification is a valuable asset. I think there are three big macro trends, right, that are fueling all this enthusiasm around new nuclear construction. AI and data centers clearly are the dominant one. But even prior to that, there were actually, I think, a couple of significant macro trends that were kind of driving things as well; and all of them reinforce one another and work together. But the broad push on the energy transition — you hear people say we'll need two to three times more electric generating capacity simply to serve electrification as we pursue that across transit and household use and all these other areas; so that's one major force, of course. I think another force is what's taking place from a reindustrialization standpoint. There are a lot of factors that I think have shaped where we saw electricity usage and demand, as a result, kind of growing relatively slowly for a couple of decades in the U.S. But one contributor there was the sort of offshoring of a great deal of manufacturing capacity and the jobs tied to it. As we see growing dynamics pushing that back into the country, factories require baseload power; they require 24/7 power, and across all the various verticals, ranging from semiconductors to, I mean, well, paper mills, oil and gas production, all these different industrial use cases, and so that's another major force as we watch that happening, kind of supportive of this as well, and we see that as something that will continue, and we think from various market perspectives, those are enormous markets too; in some cases, they aren't moving as quickly as data centers, and I would argue that in some cases, some of those are a little bit more better. I would say the 15 MW solution better fits a number of those, not all of them in its mix; that's why we see the need for both of those, whereas we see on the data center side a lot more pull on the 50 MW piece. But yeah, we think it's fairly important to kind of support those things; but we also recognize that data centers are going to move faster. And so some of the near-term deployments are likely to be sort of more focused on data centers; but from developing relationships and developing business partnerships, we see a lot of support on the sort of diversified deployment by customer models. And that's why we've tried to do that and will continue to build that up accordingly.

Craig Shere

analyst
#37

Thank you.

Ivan Feinseth

analyst
#38

Hi there. I appreciate you taking my question. And congratulations on the excellent progress and the acquisition announcement today. I'd like to focus on the opportunity to get into other industries, and maybe there are opportunities for co-R&D development partnerships? And if so, what do you feel your value proposition would be for working with some companies in biotech or pharmaceutical or semiconductors?

Jacob DeWitte

executive
#39

Yes. I definitely think that's a possibility. One enabler we see is being able to share some of the capabilities we have to help Atomic Alchemy move faster, and likewise what they contribute that helps speed things up on their end, so that ultimately they can scale into these markets and deliver — which opens the door to a lot of different things. At present, I think we're seeing across the radiopharmaceutical value chain a great deal of attention on what these radiopharmaceuticals could do. We're very early in the game on this. Supply has been such a severe bottleneck that as this market pull keeps expanding and speeding up—with more of these drugs reaching the market—you're going to see a substantial upward pull on supplies. I think that's one of the aspects of the Atomic Alchemy play we genuinely appreciate: a diversified strategy across radioisotopes, rather than concentrating only on the headline names such as lutetium, actinium, or moly. We're examining quite a few different isotopes that they are able to produce well and supply. If you make it possible for a larger number of those to get started, then I think additional pharmaceutical development will follow, since the shortage of available capacity is currently among the major bottlenecks—R&D included—and much of what we're seeing stems from that. Beyond that, strategic partnerships emerge from an entirely separate group of players, driven by what you're able to provide here, which I find pretty neat. You also raised a point about the semiconductor side, and that remains genuinely exciting to me because it's substantially underappreciated—specifically, some of the advantages neutron transmutation doping offers for doping silicon in semiconductors. From a silicon-ingot standpoint, doping them to improve semiconductor fabrication and manufacturing, reactors are the top method—in many respects this is a gold standard. So when we consider the most advanced, highest-quality semiconductors, or really silicon feedstock for semiconductors, that space presents a fairly compelling opportunity; there are, yes, some dynamics developing there. That returns me to a point—I'm aware a question came up earlier that I likely handled less than adequately—regarding where we anticipate pipeline announcements and similar items to fall as the transaction proceeds. I think we'll watch how those things unfold and how that keeps unfolding as well; and I think some offtake developments will take place over roughly the next year with the Atomic Alchemy offtake streams.

Ivan Feinseth

analyst
#40

Slide 20, after all, makes clear that Bristol Myers Squibb, Novartis, and Lilly have put substantial investment into this space.

Jacob DeWitte

executive
#41

Right. What I believe we're seeing is that as this keeps maturing and developing, it will reach the point where you can draw those partners in very attractively and in the right manner, so they become even more constructively involved. From my own experience on the diligence side, having served as a reference point for Atomic Alchemy and a few others in this area previously, I've spoken with people at the large pharma companies who are looking around and monitoring the space, yet I think they're waiting for a couple more pieces to arrive before they begin to jump into partnering. Still, it seems largely a matter of development and inevitability that brings them to the table, and that is partly what planted the seed that this could make a great deal of sense for helping accelerate into those opportunities potentially.

Ivan Feinseth

analyst
#42

Well, that seems really exciting. Congrats once more.

Jacob DeWitte

executive
#43

Thanks.

Pavel Molchanov

analyst
#44

Appreciate you fitting that in. I want to go back to something raised earlier about how the SMR field is shaping up competitively. Given the sheer number of newcomers crowding in, do you see potential buyers becoming puzzled or overwhelmed just from how many options exist and from trying to tell them apart?

Jacob DeWitte

executive
#45

At moments, I'd say yes. But what we've observed is that plenty of these people — plenty of the buyers out there — have grown quite knowledgeable about the various possibilities, and they're engaging with plenty of different players. I'd say it's a blend. It's a range, wouldn't you agree? So I'd say ultimately there's a bit of froth in this area, if you will. To my mind, that signals innovation well and mirrors it nicely. Still, this is precisely where, across several angles, we find differentiation working in our favor, and we've had that confirmed by customers. Weren't we among the earliest to launch? In fact, we launched ahead of everyone with the data center agreement involving Equinix—several months in advance of the rest—which somewhat captures that confirmation. We're quite fond of that strategy and framework, since it preserves adaptability and room to maneuver for our partners—thanks to the colocation setup and the customers they cater to. So picture this: hyperscalers occasionally recognize they wield considerable bargaining power in a given situation and may prefer to cement certain terms that would restrict your capacity to stay nimble. There are avenues through which you can locate partners offering greater flexibility. That's among the aspects we found especially appealing regarding our arrangement with Equinix, along with the additional ones we've disclosed and discussed. Even so, a few signals stand out to us as quite strong. These were designed from the start around how we founded and expanded the business, and they center on our capacity to establish ourselves among the first to move and, for the most part, to make things simple for prospective clients. We don't require a tangle of intricate partners, teams, and arrangements that customers must engage with, nor do we shift much of the burden onto them — all those other elements that only complicate getting things deployed. Rather, we handle that ourselves. We handle that ourselves, which means extra effort on our side, though it simplifies things for our customers. In my view, a company ought to aim for that—making its offerings a bit simpler; it's funny. When customers are eager to buy what you're selling, but the process becomes so complicated that they either can't sell it or can't buy it—completing a purchase turns difficult for them—it seems like there's a lot of opportunity for straightforward disruption there. And I mean, it isn't easy, but disruption that makes things easier—that's what we've concentrated on. So I believe the business model is a major differentiator. Our scale and how we approach technology are major differentiators. We aren't burdened by extended research and development commitments, nor do we run into massive obstacles in sourcing materials like nuclear graphite and similar components. Every one of us deals with challenges in the nuclear fuel supply chain, though clearly there's substantial work being done to advance that. Even so, because our design is a fast reactor, we're able to expand into recycling—which is great—and that means widening the range of fuel sources. Beyond that, we've also hit certain milestones to date, right? For instance, in 2016 we became the first non-lightwater company to formally take part in the NRC's pre-application processes. We've built considerable regulatory momentum from that. We are the sole firm possessing a site use permit for a commercial facility at a national lab, and we are also the only one that has secured fuel for an advanced reactor via that partnership—working with the National Lab and the Department of Energy too. Those are pretty robust positions we've invested considerable time in establishing, so we're well-positioned to capture the opportunity. I won't stand here and say, "We knew the timing would line up exactly this way." I'd like for things to arrive sooner than they currently will, for example. We've held the view for a long time that the underlying physics of energy renders the growing embrace of nuclear and fission unavoidable; it's simply accelerating right now at a truly opportune time, when we happen to be strongly placed as one of those out in front on this. I'd say those factors have done a good job of setting us apart. Even so, confusion still crops up now and then regarding licensing, readiness to market, and similar considerations, along with how the various stages of the permitting process differ—or the permitting journey, as I should call it—everything from construction permits for test reactors or for commercial reactors to design certifications, combined licenses, and so forth. So clearly there's still space for more education on all fronts, and that's one area where we find the picture to be reasonably clear. That said, this is exactly where our approach pays off: we move directly to the license that truly enables commercial operations, then expand from there and gain repeatability accordingly.

Pavel Molchanov

analyst
#46

Thanks for all that detail. Let me also ask a follow-up about the recent politics. Could you just remind us, in the economics — or the indicative economics — of your project that you laid out more than a year ago, was any assumption included for either ITC or PTC for nuclear?

Jacob DeWitte

executive
#47

Those aren't directly included in the models we put out. I don't know, Craig, whether you'd like to add any commentary on that, but yeah.

Craig Bealmear

executive
#48

Right. I mean, we've consistently seen that as potential upside. I believe we actually included some levelized cost of energy figures in our most recent 2Q update, in the presentation for investor day. It displayed a range of $90-$40. And that $40 figure did factor in the advantage of ITCs, though we've consistently regarded that as not necessary in order to produce a suitable return.

Pavel Molchanov

analyst
#49

Understood. Many thanks.

Jacob DeWitte

executive
#50

Thanks. At this point, I'd like to hand the call back to Oklo's Director of Investor Relations, Sam Doane, who will present a couple of questions from retail investors.

Sam Doane

executive
#51

Thanks, Marjorie. Yeah. We've gotten quite a few questions coming in from retail investors. I'd like to raise a couple of them here. First, when can we expect Oklo to have a physical plant up and producing? And does that timeline hinge entirely on legislative changes?

Jacob DeWitte

executive
#52

Right, so it doesn't hinge on legislative changes. We view legislative changes as potentially speeding things up and helping this along. But I think in a lot of ways, we see much of the legislative activity probably being more oriented toward the following units — to be, I guess, more constructive in accelerating those units, just given all the other factors that kind of set the timeframe for that first plant. But we're aiming to start initial operations at that plant in late 2027.

Sam Doane

executive
#53

Excellent. Moving on to the next question: could you describe the competitive moat that Oklo is constructing to guard against rivals, and explain why Oklo is positioned to supply a growing portion of the AI market that runs on nuclear power?

Jacob DeWitte

executive
#54

Sure. I think we’re seeing that show up in several ways, and honestly it runs pretty broadly across the whole business, right? First, there’s the business model itself. We sell power rather than using the usual approach, and that lets us bring deployment partners together under our umbrella—partners such as Siemens and Centrus and others—so they can help us actually deliver the plants and, in turn, the power. On top of that, the scale we have creates value because it gives us room to offer redundancy—shaft redundancy, frankly—by having more than a single plant available to supply power, which matters especially for industrial assets that need highly reliable electricity. That size also lets us approach markets from a somewhat different angle, and we think that’s quite important. Then on the technology side—it may sound a little odd—but starting from a very mature technology foundation and tuning it for operations and deployability rather than for a lot of fundamental R&D work that would still be needed before delivery gives us certain advantages there, because we design the technology around cost and around the supply chain capabilities that are available today, which helps us avoid some of the substantial supply chain investment that other design choices could require. So we’ve tried to steer clear of those. As a result, we get supply chain scalability that is faster, frankly, and less limited by volume. I’d say that’s a differentiating factor, right? We don’t have to construct a factory just to produce a bunch of reactors and get out there. Arguably, that approach is constraining, because you need all the capital upfront for the factory. And then inevitably you’ll have to retool that factory, since it’s quite difficult to get it right before you actually begin. So you’ll need capital for that, you’ll be bandwidth constrained, and you’ll need still more capital to scale that capacity. Instead, we try to make use of existing supply chains, existing suppliers, and manufacturing capabilities so the supply chains can actually be used—so that we’re less constrained. That means our unit costs will probably be somewhat higher than if we fully internalized everything; but that’s fine for now; we can clearly get support to pass those costs along and still be quite competitive. And later, if we decide there are things worth internalizing for margin control or improvements or whatever, then sure, we can take those steps. But we’ll be in a different position with cash flows in terms of what financing that kind of growth looks like. So at the moment, I think we’re pretty excited about how those positions look. But I think another point is really our capital efficiency. What we spent during the most recent quarter is substantially lower than the amounts you typically observe across the nuclear sector. That reflects a culture of cost discipline, which ties back to the point I made earlier—an emphasis on operating efficiently, moving these projects forward, and building on work already completed. It's very much a demonstration of the sort of culture we've established since day one, and it matters that we keep that up as we expand. Naturally, as we expand, our spending will rise, and that's just what happens when you grow. But beginning from that foundation is a strong position to be in, as opposed to beginning with an extremely high cash burn, which is far too frequently what the incentives push you toward in nuclear before you've shipped anything—in fact, long before you've shipped anything. So that gives us certain advantages in that respect; so on many fronts, those things serve us quite well; and then I believe the other really significant one is the timing edge we hold, since we're the only company with our combination of timing and maturity on the site use permit, on having fuel secured and water available to us. Every one of those factors delivers a huge advantage to us in reaching the market as an early mover and then having the chance to scale and learn across our fleet in that regard. And under our business model, because we take on some of the owner-operator role, we remove that owner-operator risk. You don't get many customers saying, "Okay, we're interested, but we'd like to wait and see a couple of years of operation from your first plant." Instead, people say, "Okay, well, you're supplying the power. Great. We're comfortable doing that." And then we're able to speed up the lessons learned across our fleet as we expand and scale. So that gives us plenty of benefits in that way.

Jacob DeWitte

executive
#55

Great, and thanks to everyone for being here today. I really appreciate the attention and engagement, as always. I think this is a particularly exciting moment for nuclear, especially over the last month, month and a half, given all the activity in the space. All these announcements we're seeing are, in our view, extraordinarily constructive and validating of the opportunity that nuclear is well positioned to meet — the opportunity to deliver abundant, affordable, reliable, and clean energy. And I think we at Oklo are pretty excited about the position we hold in the market to do that, validated by our customer partnerships and our general traction toward deployment. So we look forward to keeping you all updated next quarter, and thanks again for the time.

Operator

operator
#56

Thanks. And everyone, that brings today’s session to a close; we appreciate your taking part. You’re welcome to log off now.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Oklo Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Oklo Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Oklo Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.