Pinnacle West Capital Corporation (PNW) Earnings Call Transcript & Summary

November 6, 2024

New York Stock Exchange US Utilities Electric Utilities earnings 52 min

Earnings Call Speaker Segments

Amanda Ho

executive
#1

Thanks, Matt. I want to express my appreciation to each of you for joining this conference call and webcast, where we'll go over the results from our third quarter of 2024, along with recent developments and how we performed operationally. Joining us as speakers today are our Chairman and CEO, Jeff Guldner, and our CFO, Andrew Cooper. Also with us are Ted Geisler, who serves as APS President; Jacob Tetlow, our COO; and Jose Esparza, Senior Vice President of Public Policy. Before anything else, there are a few points I should go over. You can find the slides we'll be referencing on our Investor Relations website, together with our earnings release and related information. Statements made today and in our slides include forward-looking statements that reflect current expectations, and actual results could differ materially from those expectations. Our Form 10-Q for the third quarter of 2024 was filed this morning. For forward-looking statements, cautionary language, and the risk factors and MD&A sections — which lay out risks and uncertainties that might cause actual results to differ materially from what's contained in our disclosures — please consult that document. A replay of this call will be posted on our website shortly and will remain there for the next 30 days. You can also access it by telephone through November 13, 2024. At this point, I'll hand the call over to Jeff.

Jeff Guldner

executive
#2

Alright, thank you, Amanda. And I appreciate everyone being with us today. We keep performing strongly when it comes to running our operations and handling our finances. So in my operations update, I want to tell you about how we successfully got through yet another summer in the valley that broke records, and how we served our customers dependably at the moments they needed us the most. I'll also give you the latest on the regulatory lag docket, and after that Andrew will walk through how the hot weather and robust sales growth caused us to revise our 2024 earnings guidance, and he will also go over what we expect financially looking ahead. First off, I'd like to recognize the incredible work of our operations and field crews, who made sure our customers could count on reliable service throughout what turned out to be the hottest summer on record. On top of maintaining a dependable system for us here in Arizona, I also want to thank the 30 crew members who recently volunteered to leave their homes and head to Florida, answering the call for help to rebuild the grid and restore power to communities that Hurricane Milton had devastated. This was made possible by our industry's mutual assistance network, and it's a great example of how we live our APS promise — by doing what's right for others and delivering for our communities. This year, the warm-weather period lasted an unusually long time in our area—it didn't wrap up until the middle of October, which is when the Valley at last saw the end of temperatures reaching into the triple digits. All told, we racked up 70 days at 110 degrees or higher during the season, surpassing the prior year's mark of 55 days. We also set a record with a run of 113 straight days at 100-plus degrees, and on August 4, energy demand reached a brand-new all-time high of 8,210 megawatts. Because of the scorching days, the warm overnight conditions, and the heat island effect in the Valley, cooling systems frequently had to operate nonstop so that residences and commercial buildings stayed comfortable. During that period, our generating resources performed really strongly and delivered electricity at the moment customers urgently required it. The careful, far-ahead resource adequacy planning we do, paired with maintenance efforts on equipment and creative demand-side offerings for customers, delivered results all through the summer. Both our baseload units and our quick-start, fast-ramping assets performed well. Beyond that, we made use of our virtual power plant, which includes the Cool Rewards smart thermostat initiative. That initiative has more than 95,000 thermostats signed up, working in concert, and when activated they assisted in saving close to 160 megawatts. This summer, when a major storm caused an outage, we worked alongside customers taking part in our program in a way that was both unique and historic. On this earnings call, we want to note that members of our customer technology team collaborated on a particular, selected segment of the thermostat network — units sitting in the homes of customers who chose to take part — to support voluntary reductions in electricity use. That push, combined with operational fallbacks such as shifting power flows and breaking the system into sections, did manage to ease the pressure the storm damage had placed on the grid. Never before at APS had a smart thermostat initiative been deployed in this kind of focused way through this novel method. Looking well into the future is precisely what lets us keep providing reliable service. And I'm glad to share that we have secured a contract for the expansion of our Redhawk Power Plant, which should come online by 2028; that effort, together with what we told you about last quarter, will bring in excess of 800 megawatts of APS-owned generation and battery storage, making sure we possess the resources needed to deliver dependable, reasonably priced and clean power to our customers; since the 2023 all-source RFP is almost finished, our attention is shifting toward the following batch of resource requirements, and we intend to release our 2024 all-source RFP within the coming weeks. Given the severe weather we saw every summer, helping our communities stays as crucial as it has always been through our heat relief support programs, APS boosted both its energy support and crisis bill assistance. Keep the summer moratorium in place on disconnects for overdue bills and helped customers with payment arrangements, and we teamed up with over 100 local non-profit and community agencies to link the state's most vulnerable population to useful resources. Lastly, we keep concentrating on delivering the finest experience to our customers, and I'm glad to report that so far this year, our customer care phone center holds the top national ranking among our peers, as judged by our customers in the residential J.D. Power Electric Customer Satisfaction study. Overall, the satisfaction scores our customers give us through J.D. Power place this company within the top 10 utilities among our peers. Our employees make me extremely proud, I'm proud of the progress we've achieved so far, and I'm eager to close out this year strongly. Now for regulatory updates. A workshop focused on formal rates was held by the commission on October 3. Input came in during that workshop from the Federal Energy Regulatory Commission, consumer advocates and Arizona utilities. Recommendations on consumer safeguards and implementation options were offered by Staff. We remain dedicated to making progress on reducing regulatory lag, while still permitting continued expansion of a dependable electric grid. Obviously, yesterday was election day. Three Arizona Corporation Commission positions were part of those races. With about 91% of precincts counted as of this morning, if the current tallies stand, the commission's seats would go to Lea Marquez-Peterson, Rachel Walden and Rene Lopez. If you want to track the numbers yourself, the Secretary of State's site has both — that's results.arizona.vote. Heading into the finish of 2024, we remain focused on our mission and on giving customers reliable, affordable and clean service. Thanks for spending time with us today — over to Andrew.

Andrew Cooper

executive
#3

Thanks, Jeff, and I appreciate everyone being here today. This morning, we put out our results for the third quarter of 2024. I'll walk through those numbers, point out the main drivers, and give you an update on our guidance for the full year 2024. Then I'll share some perspective on 2025 and our longer-term financial outlook. For this quarter, we earned $3.37 per share, which is down $0.13 from the same quarter a year ago. Several things caused that decline: greater O&M and depreciation expenses, along with financing costs and the timing of income taxes. Working against those items were favorable effects from new rates that took effect earlier in the year. And, as Jeff noted, we had another summer of record-setting heat, which helped us relative to last year. Strong sales growth continues across our customer classes. In the third quarter, sales growth on a weather-normalized basis reached 5.9%, with residential as well as small and large C&I customer groups all contributing. Thanks to ongoing expansion among our C&I customers, C&I growth came to 10.3% this quarter. That makes three quarters in a row of growth above 10% in that sector. Also foundational to our sales growth has been steady, strong growth in retail customers, which registered 2.3% for the quarter. In light of these favorable growth trends and the sizable contribution from weather this year, we've revised our 2024 financial guidance. Our expectation for 2024 earnings is now a range of $5 to $5.20 per share, and we've changed our sales growth expectations to 4% to 6% for the year, which aligns with our long-term sales growth forecast. In addition, given sustained growth and recognizing that we can make use of some of the weather benefit, to reduce risk in both future operating expense and capital investment. We've raised our forecasted O&M for the year to a range of $1.01 billion to $1.03 billion, and lifted our capital expenditure plan for the year from $1.95 billion to $2.05 billion. Turning to 2025, we expect an earnings per share range of $4.40 to $4.60 per share. The expected drop in 2025 relative to the initial weather-normalized 2024 earnings guidance stems from added costs tied to regulatory lag, including debt and equity financing costs and higher D&A. Plus the conclusion of a positive OPEB amortization and a onetime gain from the sale of Bright Canyon in the earlier period. Continued customer and sales growth and O&M management partly offset these, which speaks to the strong core fundamentals of our business. Our service territory's growth outlook for 2025 remains robust. We anticipate customer growth in a range of 1.5% to 2.5% for 2025 and over the long term, as Arizona keeps drawing residents and businesses in large numbers. We're seeing a record number of new customer leader sets on pace to exceed 35,000 in 2024, the most since the great recession, and we expect this trend to keep going. In addition, we expect sales growth adjusted for weather to land between 4% and 6% for 2025 and over the longer horizon stretching to 2027, and within that, 3% to 5% should come from expansion in the extra high load factor C&I segment. That's where demand is still robust and where our current customers keep ramping up; in fact, Taiwan Semiconductor just restated its pledge to develop 3 fabs in Arizona before the decade is out. Engineered wafer production began at the first fab during this year, and volume production should kick off in early 2025. Peering further out, our confidence in the long-term path remains intact. We are restating our guidance of 5% to 7% EPS growth, anchored to the midpoint of the original 2024 guidance range of $4.60 to $4.80. This growth is meant to be underpinned by our financial strategy, which keeps attention on striking a balance among investment, cost recovery and what customers can afford. Spanning the period to 2027, our capital plan calls for $9.65 billion of investments — a 24% jump over the plan we laid out earlier this year. Strengthening infrastructure, boosting reliability and satisfying the needs of a service territory expanding at a rapid clip — that's what this plan targets, and it encompasses putting money into new generation resources as well as our strategic transmission plan. Rate base growth of 6% to 8% should result from these investments. Worth noting: more than 40% of the capital investments ahead under this plan should qualify for the system reliability benefit surcharge that was just approved in our most recent rate case, or else through our FERC formula rates, and either route permits better timeliness when it comes to recovering costs. To back the capital plan, we've likewise refreshed our financing strategy out to 2027. A blend of debt and equity sits inside our plan, supporting a balanced utility capital structure and aligned with how our spending unfolds. During this planning window, our updated equity needs fall below the 40% of new capital target we set on our Q4, 2023 call in February, and they amount to a very modest bump in the annual equity run rate we expect — from $200 million each year to roughly $250 million to $300 million each year. As we've said before, we still think an at-the-market equity issuance program would pair nicely with our planned accretive capital investment profile. We constantly examine other financing alternatives too, and we believe the approach described above gives us flexibility to employ least-cost best-fit financing methods while keeping a solid balance sheet and targeting metrics in line with our present credit ratings. As we carry out our capital and financing activities to serve our fast-growing customer base reliably, our commitment to running a cost-efficient operation stands. Reducing O&M per megawatt hour remains our long-term goal. And though the final scheduled major outage at Four Corners Unit 5 is set for spring of 2025, our wider emphasis solely on operations and efficiency will keep driving cost management going forward. Looking forward to 2025 and past that point, our confidence in the long-term financial plan stays intact, even as we acknowledge and keep working on the difficulties caused by ongoing financial lag. The substantial increase in customers we've seen across all classes, along with powerful sales gains—especially within semiconductors and the wider manufacturing industry—keeps underscoring what makes our service area uniquely advantageous. Combined with a regulatory climate that is getting better and prioritizes swift cost recovery, this points to a promising road ahead. What we're investing in right now builds the groundwork for lasting expansion and value generation over the coming years, and our attention remains on providing dependable, reasonably priced service while holding a solid financial standing. That brings our prepared comments to a close. At this point I'll hand the call back to the operator so we can take questions.

Shar Pourreza

analyst
#4

Clearly, Jeff, given that it's election morning, that's the hot topic to kick things off with. Results aren't final yet, but it appears we might wind up with three additional Republicans on the 5-person commission. From a regulatory framework perspective, what do you suppose that might mean? You folks are achieving genuinely solid momentum on things such as the regulatory lag proceeding. So I'm wondering whether that momentum could shift either way — improve or deteriorate? One would have to assume some policy changes might be coming, but I'm simply interested in how you're looking at this?

Jeff Guldner

executive
#5

Yeah. Shar, I'd say broadly — and there are still some early — late early results, I believe, outstanding, with a few precincts left to report. However, the bulk of the votes have been counted, and you're right that as things stand, you have the three Republican candidates presently had; so clearly, that still needs to be finalized. I believe if you consider what was said during the campaigns, generally what you'd observe is that the Republicans, I think, showed a fair amount of alignment with the sitting Commissioner Myers and Thompson when it comes to concentrating on matters such as the regulatory lag docket; so I think it's — I think that should that outcome hold, you're probably going to see ongoing alignment with the present bench. So obviously, I think that points toward constructive efforts continuing to advance on the reg lag docket. Beyond that, this is something we involve commissioners from both sides with throughout the campaign. And I'm certain that whoever ultimately prevails is going to have differing issues and questions and want to grasp things a bit further, and we're eager to engage with every commissioner and keep that dialogue going and ensure they grasp the drivers and the requirements of the business.

Shar Pourreza

analyst
#6

Great. That's fantastic. So finally, regarding load growth. In the short run, you all basically project 4% to 6% for '24 and '25, and that, I suppose, matches nicely with your longer-term guidance too. Jeff, could you perhaps discuss how durable that is, and also I'm just more curious, considering the talks you've had with customers. Might there be chances for yet another step change rise in load, from a big customer becoming a hyperscaler?

Jeff Guldner

executive
#7

I'll — and I'll have Cooper chime in on this one. I mean, I believe it's durable. So something we've truly concentrated on in Arizona across recent decades — well, not exactly a decade, but from the last recession onward — was attempting to shift the economy here away from mostly homebuilding, sort of retirement-oriented, toward more advanced manufacturing. And I believe the state has performed quite well at that. Thus you observe plenty of manufacturing. I had just been on a call with the Commerce Authority, and they were displaying some projects that exist out there; and they do span from — you've got the large ones, the data centers, clearly, are examining Arizona closely. Yet you also observe many of these 5, 10-megawatt factories and manufacturing sites that are merely seeking to niche into whatever land can be found. And so I do believe the state remains appealing for that load. We're well positioned between Texas and California. We possess solid transportation. We truly don't have hurricane-style disruptive weather. However, you see, you get a hot summer, yet that's a dry heat, I suppose. And so I think we will keep seeing that sort of growth. It becomes somewhat tougher when you move into much larger. Since now you must contend with just the reality that we have to determine the power plants needed to serve that growth. And so we're collaborating closely with TSMC, and we would welcome the additions. We'll determine how to accomplish it, but it's — we have considerable pent-up demand arriving from both manufacturing and data centers. Did I overlook anything, Cooper?

Andrew Cooper

executive
#8

No, I'd simply add this, Shar — you can sort of observe from what's contributing this year that the 4% to 6% is fairly well spread as we head into '25, with TSMC starting to ramp up, which reflects that diversification across the service territory Jeff mentioned. But small business and residential have also been contributing. Our forecast is that customer growth will keep running at 1.5% to 2.5%. And this year we've come in above the midpoint of that range. You're seeing those contributions show up across customer classes, and that comes from the diversification on the large C&I side, which is driving some of that downstream growth too.

Shar Pourreza

analyst
#9

Understood. That's great. We'll catch up in 2 days — nice work on yet another favorable leap forward.

Jeff Guldner

executive
#10

Appreciate it, Shar.

Nick Campanella

analyst
#11

So I recognize a significant portion of this CapEx increase got absorbed into trapped capital. And when we consider that 9.55% ACC ROE, could you put a number on how far behind you are there in '25, percentage-wise? Then, regarding the present rate case projection, at what point would that ROE get better? Would it be a partial year in '26, followed by the full run rate in '27? Working through that schedule would be useful.

Andrew Cooper

executive
#12

Nick, this is Andrew. Like you said, we've raised the volume of CapEx being tracked, and we did that deliberately. Now, with the SRB, we feel more confident about advancing certain customer-focused generation projects that are reasonably priced and move through our All-Source RFP. Plus, we've considerably increased our transmission CapEx, and there's a formula rate within a transmission adjuster. So over time, that will definitely be beneficial. Granted, a number of those transmission projects. And clearly, the generation projects span multiple years. And — so there's — before those are placed in service and run through the trackers, some lag always exists. On the core lag issue, though, the CapEx and operating costs not included in those trackers, the reason we remain so concentrated on the regulatory lag docket and on filing a future rate case quickly is that the more distance grows from the previous rate case, the greater that lag becomes. You can observe it in the 2025 guidance; we face several of the same problems with interest expense and D&A as we put money into infrastructure, and on top of that are a few structural matters like the OPEB item. And so although we haven't put an exact figure on it, the reason we're so intent on, first, boosting the CapEx that goes to tracked items and then exploring fixes for the untracked items, is so we can earn as near to the authorized ROE as possible. Jeff, is there anything you'd like to include about how the rate case schedule will factor in?

Jeff Guldner

executive
#13

Right. And so, Nick, when you consider that, clearly the commission is sort of in the process of — they're examining what the structure might be if they proceed with the formula rate docket, which could alter how the case appears or the way you'd file it. But looking at the timing involved, the soonest you could actually move is really a filing in mid '25, since with a '24 test year, you'd be contemplating a mid-'25 filing. Nothing has been announced by us regarding that, yet that's simply the soonest you could realistically proceed, and after that it would likely require 12 months to litigate that case. So you'd be anticipating rates arriving in the middle of '26, or so, in the back half of '26. And that's regardless of what occurs regarding the structure of it, whether it's a formula or simply the standard traditional rate case. That genuinely is the first occasion when you'd then receive relief on some of those lagging items Andrew mentioned; that's the first occasion when you would have placed into the new rate structure items like that pension OPEB cliff issue — it would be incorporated into that structure. So the next occasion you're probably going to see that is likely in mid-'26, the back half of '26 timeframe. Hopefully, that's helpful.

Nick Campanella

analyst
#14

That answers it. I'm grateful for that; and then only one point of clarity regarding the financing plan. Since I realize you were somewhat emphasizing that you possess these forward draws accessible from the block you completed in February of '24. However, none of that offsets the $700 million to $900 million figure, right?

Andrew Cooper

executive
#15

Right, Nick. The $725 million we completed in the block last February, we have not drawn that as of yet; and that was really largely the catch-up equity to ensure we keep having the balanced capital structure down the utility. If you think back to the prior plan, about $400 million was earmarked as unidentified parent capital across '25 and '26. So in practice, that $700 million to $900 million gets carried forward, and on top of that, the $400 million is bumped up modestly by another $500 million. Our expectation is that equity will match our capital requirements throughout the '25 to '27 stretch. To date, we haven't drawn anything against the original $725 million block. That's more or less where we'd turn first for such equity. That said, vehicles like ATMs are certainly an option, and since we've already applied the forward overlay to the original equity, we could definitely look at doing the same for equity down the road. By combining these two instruments, we'll be able to align capital expenditures with outside funding on an ongoing basis.

David Arcaro

analyst
#16

Let me ask this — could you share a sense of what the pipeline looks like, meaning the megawatts of data center demand you have in that pipeline when it comes to the large load requests?

Jeff Guldner

executive
#17

Sure. I'll turn it over — maybe Ted can walk us through what we're seeing.

Ted Geisler

executive
#18

Absolutely, David — Ted here. We're still seeing a lot of demand, and that covers both projects we've been engaged with for multiple months or even as long as a couple of years, plus fresh requests arriving within the service territory. At this point, we have more than 4,000 megawatts of extra high load factor customers — mostly data centers we've made commitments to — and those are either under construction, in development and approaching coming online, or sitting in the earliest planning phases. Beyond that, though, we also have in excess of 10,000 megawatts of extra high load factor demand, again mostly made up of data centers, and with those we're in a planning process right now to figure out when we can commit to serving what they need, which depends on where they're located, what capacity they require, and how we make sure we satisfy their reliability requirement while continuing to serve all of our growth outside the data center segment. So that's the picture as we see it today, though it's fluid, it shifts often, and as demand keeps coming, the movement is usually upward.

David Arcaro

analyst
#19

Great, thanks. So would it be reasonable to describe 4,000 megawatts as already built into the existing plan?

Ted Geisler

executive
#20

Yes, that's right.

David Arcaro

analyst
#21

Sure. And clearly, that's a massive pipeline compared to the system you have now. I'm just curious — within it, are there any really big data centers that could fundamentally reshape your system? For instance, do you see gigawatt-scale data centers that, just by themselves, I'd expect to drive fairly significant impacts when it comes to CapEx investment needs?

Ted Geisler

executive
#22

What's been committed and is already somewhere in the development process is fairly spread out. There are a handful of bigger individual requests sitting in the 10,000-megawatt queue, and those remain in the early planning stage; however, what's presently under development and already reflected in our expectations is fairly spread out. I'll also repeat what Andrew mentioned before — beyond that 4,000 megawatts of additional high load factor customers, we're genuinely glad to see distributed demand arriving from manufacturing and from residential too, and that's not a small thing. Just this quarter, 1.7% growth, and we've hit the highest level of new meter sets in well over a decade, which is impressive. So that demand, along with the demand guidance we're providing, is spread not just among a number of commercial industrial customers but even across the broader segments of small business, large business, data center and residential.

Anthony Crowdell

analyst
#23

Nice work on such a strong quarter. Let me ask briefly about that 5% to 7% EPS CAGR — when I consider the top end, that 7%, what does it assume regarding regulatory lag? Does it presume lag has gotten smaller, or does the 5% to 7% leave out any chance the current regulatory lag dock is put into effect?

Andrew Cooper

executive
#24

Right, Anthony, this is Andrew. Regarding how we view the 5% to 7% and its relationship with better regulatory lag, the point is essentially to produce a smoother, more predictable form of that 5% to 7%, rather than letting outcomes tied to one rate case dictate step function increases of that kind. Our confidence in rate base growth is solid. We're also confident in — really, the substantial headroom available to keep these investments affordable for customers. What cutting the lag would accomplish, though, is to permit that smoother trajectory. Naturally, that also translates into receiving, from a cash flow standpoint, stronger credit metrics along with greater confidence in the plan overall. That, in turn, feeds into where you land within the range and how we regard it. In the end, though, what we're describing is making that range smoother; predictable and transparent each year, rather than leaning more heavily on these isolated events. That is truly where our attention sits.

Anthony Crowdell

analyst
#25

Great. And finally, there's been plenty of discussion about big loads on the system. We've observed other states pursuing adjustments to rate design, perhaps toward something resembling a take-or-pay arrangement, or a take-or-pay deal lasting 10 years. Is APS exploring that kind of approach?

Jeff Guldner

executive
#26

Yes. Anthony, one thing we're quite focused on when speaking with those customers is safeguarding the possible effects on the current customer base. So in many instances, what you're seeing is protection, meaning that if you make a significant investment and install a lot of distribution and transmission infrastructure for a customer, and then they don't show up, you need protection so that this doesn't then get shifted onto the remaining customer base. So there's a considerable amount of work underway. And we do it collaboratively; we're speaking with the large loads in the data centers and attempting to figure out what things we can do that mutually work for us; but I'd say the emphasis there is really on trying to protect the current customer base and while being fair to those new customers. Anything you want to add Ted?

Ted Geisler

executive
#27

Yeah. Jeff makes a great point. Something that works in our favor across the territory we serve is that we began energizing a number of those big data centers as far back as 2019. That means we've honestly had the good fortune to build up a fair amount of track record and hands-on knowledge, which lets us understand how they ramp up and figure out how to make sure we're doing two things: first, staying precise and prudent when projecting what they'll truly consume rather than what they might have planned to consume, and second, making certain that growth covers its own costs — the infrastructure required to serve those data centers gets funded by those data centers, and we stop any shifting of costs onto our other customer classes.

Paul Patterson

analyst
#28

All right, at this point I only have a single question remaining, and it relates to the election. I've been tracking that item on the site you mentioned. Forgive me, but what was the figure you gave for votes that hadn't yet been tallied?

Jeff Guldner

executive
#29

I believe it's somewhere around 120,000.

Paul Patterson

analyst
#30

and how much of the overall vote does that represent?

Jeff Guldner

executive
#31

my recollection is that it comes to 2 million.

Paul Patterson

analyst
#32

Alright. It sure seems as though the Republicans are, you know, clearly ahead in every race. It is — things are a bit close; so I just wanted to confirm that. Alright. When do you figure they'll be done counting the votes?

Jeff Guldner

executive
#33

I'd say they're — what I mean is, there are those late ballots, the earliest ones that have to be tallied, and after that you must go through the certification step. But then again, I think it's quite likely that you can watch by the close of today, the figure you'll see is going to move toward being smaller.

Julien Dumoulin-Smith

analyst
#34

I'd like to revisit something Nick was zeroing in on, which concerns earned returns. With CapEx rising, and clearly some of those elements being less closely tracked, how are you viewing that lag effect not only into '25, but really when you consider what lies past that in '26 and '27, given the revised forecast grade? Could you share any preliminary expectations? I recognize there are multiple moving parts, yet considering how CapEx is composed, setting aside shifts in the construct from this point, would you anticipate the lag speeding up? Or how do you weigh the offsets alongside possible load growth?

Andrew Cooper

executive
#35

Julien, this is Andrew. Sure, so load growth is certainly a tailwind, and that's the additional rationale behind examining O&M per megawatt hour, so that not just regarding capital, but as our footprint grows and we spend more on the O&M side, that too gets covered by the growth. Then regarding capital, at this stage it's above all a matter of capital allocation, ensuring we direct funds toward asset classes that will deliver suitable investment recovery, and that has meant transmission and, more and more, generation. We're boosting our distribution investments along with certain other core infrastructure investments; however, those are pursued prudently while we keep evaluating possible mechanisms that fix our capacity to bring that lag under control. Filing a rate case is necessary for us. Much of the lag present there stems less from capital and more from the income statement side. Consider our most recent rate case: its test year came before inflation climbed and interest rates climbed. So when you consider our O&M, our interest expense and our pension expense, all of those are scaled against what we're truly achieving on our income statement. Thus, the capacity to true up those costs via the upcoming rate case, since in that prior rate case we accounted for 12 months of post-test year plant in service. We're — and at this point we're moving further into certain of these trapped areas of capital. Looking at things through the lens of capital, we're sitting in a fairly solid spot. At the same time, we recognize that the capital plan has gone up. So if you were to layer some kind of construct on top of it — one that, say, handed you a formula rate — then certain other capital areas would open up more for us to put money into, and we'd feel more sure about earning something nearer to our earned returns. That means the top priority is to make up ground on a few of those income statement costs through filing another rate case, and after that, to be positioned so we can keep being smart and nimble about the way we deploy capital.

Julien Dumoulin-Smith

analyst
#36

Understood. That 5% to 7% figure — does it assume the regulatory docket gets settled, or not? Would that be an accurate way to put it at this point? Or is it more just a matter of evening things out across the plan's duration?

Andrew Cooper

executive
#37

A resolution on that docket would assist in evening things out. As I said before, I believe what's at stake is whether we rely solely on rate cases — and honestly, thanks to the SRB and the transmission adjuster, that isn't our situation. Rather, it's the contrast between heavy reliance on rate cases and having yearly true-ups, so that whenever we achieve greater cost savings, we're able to recover them; and whenever there's a chance for customers to save on costs, we return those too via that same mechanism, and essentially get as near as possible to our authorized return. Consistently, year after year, instead of — only following a rate case.

Julien Dumoulin-Smith

analyst
#38

Yeah, for sure. So, if I could just add a small follow-up to what you said. During the queue, someone brought up that inflation seems to be slowing down a bit at this point. Your O&M for '24 comes in a touch above what I saw in the previous deck. Could you share a bit more on what you're observing with inflationary patterns? In other words, is this one more factor we ought to keep in mind when it comes to the lag? And perhaps, since we're touching on net picking, with tax rates lower in '25, would you call that a solid structural level? Or do you also anticipate that increase returning to the plan?

Andrew Cooper

executive
#39

Yeah. Let me begin with O&M. We raised O&M for 2024. This is a practice we follow annually. We examine whatever weather-related gain might show up over the summer, move projects ahead of schedule, review the multiyear window for O&M, and determine what can be shifted earlier. So a portion of the O&M bump we recorded this year came from intentionally accelerating projects into this year. Then, as Jeff noted during his prepared remarks, we're funding certain customer assistance programs — once again acknowledging how intense the summer heat was. So part of the O&M figure you're seeing in '24 stems from that. We're definitely still encountering pockets of inflation across some of the — some of those line items. A greater share of it sits on the capital side. Still, on the whole, the O&M increase you're noticing this year comes from that. It set up a solid opening for next year, and in the '25 guidance you can see O&M declining. That reflects two things: the derisking we accomplished this year, and then, honestly, certain organic cost management chances that we chase hard through a lean operating culture; we've been collaborating closely with each of our operating businesses regarding next year's O&M profile. That's roughly what produces the outcome you're seeing — the rise this year followed by a fairly substantial drop next. Regarding the tax rate, the elevated rate this year compared with next year comes purely from greater taxable income, which lifts us on an effective basis. Our tax credit portfolio remains quite strong, and we're steering toward the lowest tax rate we possibly can, yet that mostly reflects what our pretax income looks like.

Julien Dumoulin-Smith

analyst
#40

Understood. So what I'm taking away from your answer is that the rate ought to remain fairly steady there, correct?

Andrew Cooper

executive
#41

That's right — thanks to the tax credits, we're holding fairly steady.

Sophie Karp

analyst
#42

I'd like to ask about the All-Source RFP. Could you remind me — or maybe remind all of us — what portion of those 8,500 megawatts you've procured since 2020 were you actually able to construct on your own via the system reliability surcharge mechanism? And in the upcoming rounds of this RFP, how do you anticipate your win rate, so to speak, will take shape?

Ted Geisler

executive
#43

Yes. Sophie, it's Ted here. I believe we've made it fairly clear that we consider an equal split between ownership and third-party owned or PPA projects to probably be the correct long-term blend; since SRB, we've managed to more than double the successful ownership projects, in fact, from the prior RFP, we have roughly 800 megawatts of projects that right now are contracted and under development. We'll be getting set to put out the next RFP probably later this year. So a fresh batch of projects will move through that process over the course of 2025; we're not yet at the, I'll call it, 40% to 50% mix between ownership and PPA, but we've more than doubled the ownership projects. And as we keep processing RFPs, we'll aim to keep raising that ownership share.

Sophie Karp

analyst
#44

Okay. Understood. That's useful. Perhaps I could ask something broader regarding inflation, building on what you were just discussing — specifically how it affected the regulatory lag you experience. As you prepare for your upcoming rate case, what inflation assumptions do you hold at present? I realize it may be premature to say, but considering possible policy shifts in Washington, how do you evaluate the range of inflation scenarios ahead, since clearly it matters for you to soften the impact of new rates?

Andrew Cooper

executive
#45

Yes, of course, Sophie. This is Andrew. A central element of this — of this upcoming rate case is that the O&M costs we locked in during our prior rate case, using the historical test year, stretch back to July of 2021; consequently, the rates customers currently pay did not reflect any of the inflation we have observed across the past couple of years. As a result, our capacity to reflect the present cost environment — which is steady, perhaps costs are not falling right now, yet they are steady — and should we stay at the cost level we see today, while being extremely disciplined about managing O&M to get there, we will be in a position to true up to the current cost environment in the upcoming rate case. That said, a fairly large increase would be required in this rate case, purely because, if you strip out res and DSM and similar items from our O&M at the start of 2020 — hard to believe we are now in the middle of the 2020s — but at the start of the 2020s, it was $850 million. And for next year, our O&M guidance falls in a range in the high $900 million. So the lag is significant. Part of that reflects a service territory that keeps growing, yet much of it reflects acknowledging the actual cost conditions we face at present.

Steve Fleishman

analyst
#46

I'm sorry if this was already covered. But you brought up using under 40% equity to finance the extra CapEx. Is that simply because you're receiving more cash flow via faster recovery, or is there another reason?

Andrew Cooper

executive
#47

Yeah, Steve. One factor is that, looking at what we did regarding the summer benefit this year, it wasn't only some O&M derisking. It was also having extra retained earnings that bolster our credit metrics, which means we can feel more assured about our capital plan. And when you look at that top-line sales growth, that too comes from a — even though we still face a notable lag from a credit metrics standpoint, as we reduce our deferred fuel balance while we keep seeing top-line sales growth. It bolsters the credit metrics in a manner that lets us be somewhat more judicious regarding both the — what that additional equity requirement is; and the fact that we removed $725 million upfront provides us with some flexibility to act opportunistically on when we pursue that equity. However, if you examine the rise in the CapEx plan and our capacity to execute it, remain inside our credit metrics, keep a balanced equity cap structure at the utility and be judicious about how much parent company we're assuming, that $700 million to $900 million of extra equity across '25 to '27 is a figure that aligns with the capital plan and enables us to kind of remain where we are from a metrics standpoint. And that represents under 40% of that additional need.

Steve Fleishman

analyst
#48

I believe you brought up other ways to raise money too. Could you expand a bit on what you have in mind there?

Andrew Cooper

executive
#49

Sure. We're willing to consider anything across the board. Take debt, for instance — we constantly evaluate options such as the DOE initiative currently available under the IRA. Hybrid securities have consistently been on our radar as something the parent could use to help handle certain credit metrics along with a portion of the equity requirement. Up to now, our preference has consistently leaned toward keeping the capital structure as simple as possible, along with a few central principles, namely maintaining balance in the equity capitalization at the utility and avoiding excessive leverage at the parent; and whenever equity was required, we went to the market and issued it. So the most basic approach is likely what matters most to us, though our door stays open at all times. Do other equity forms exist? Are there inventive methods to fund certain of these assets? Are some asset classes better suited to one approach rather than another, and are there methods to keep those off the books; the DOE loan program illustrates that well. We also booked $70 million in DOE grants during this year, which assists in offsetting the financing costs too. So we'll stay opportunistic, examining possibilities in the capital markets and elsewhere as well.

Steve Fleishman

analyst
#50

All right, and for the final question — regarding the nuclear PTC, once those specifics eventually arrive, my understanding is that it isn't reflected in your results. So would you continue to approach it as something you'd perhaps prefer to postpone? Or what's the right way for us to view the nuclear PTC?

Jeff Guldner

executive
#51

Yeah. What I'd say is that we continue to await the shape of that guidance.

Andrew Cooper

executive
#52

Yeah. And I mean, when you get right down to it, that's something owned by the customer. Given every one of the capital requirements we're facing, and the fact that we need to handle them in a way customers can afford, the path for that PTC is that it's the customers' to keep. There's a stretch of time ahead of our next rate case during which we need to work out, structurally, how this functions. And my view is that holding off until we see the guidance matters for that. That said, you're right — as of today, it isn't factored into any guidance we've given. In the end, though, it serves as a mechanism to push out, for customers, what the capital investment plan costs.

Dylan Lipner

analyst
#53

I just had a question, and I want to circle back to O&M for a moment. How much of that O&M spending got accelerated out of 2025 into the current year?

Andrew Cooper

executive
#54

Yeah. The way we approach it is by thinking about our multiyear plan and the whole set of O&M projects in our portfolio. When you look at the revised O&M guidance we put out, we did not separate it specifically between '25 and '24, since we're simultaneously in the middle of the '25 budget process; what we focus on is derisking opportunities across that multiyear horizon. Our view extends beyond a single year, because we've built up this capability within the organization; at the start of each summer, we examine how the summer is shaping up weather-wise and what possibilities that opens up. There are some excellent instances of projects we've undertaken. We have an IT infrastructure project that we're certain will ultimately become a capital project. But during the planning phase, a portion of it gets charged to O&M. Well, when we saw the weather developing, we decided, let's begin planning that project in the current year, rather than pushing it to the following year; and there are plenty of excellent instances similar to that throughout the company. We don't really separate that from the broader long-term derisking effort. We have specific projects that we shift, but we also do it within the framework of '25 budgeting. So there's somewhat of a gray area between what has genuinely been accelerated versus something that, yes, we'll schedule it for '24 and essentially the '25 budget. But in the end, we're always hunting for those opportunities. We also consider capital as a means to capture some of that weather benefit too. And we understood that we needed to examine '25 O&M on its own terms. And so I believe one of the crucial points for us was, how could we lower the '25 O&M figure, given that we had that OPEB amortization and the Bright Canyon gain disappearing in '25; so for us, we've spent the entire year thinking about how to budget for '25 considering some of those structural shifts. And so we've been collaborating very closely throughout the business to accomplish that. And one of the excellent instances there involves the OPEB item. We knew that fell within the scope of our overall employee benefits and retirement benefits portfolio. And so we proactively pursued opportunities in that area; and so we put our primary health insurer out to bid. We generated some substantial savings in '25, anticipated for '25 as a result of switching our health insurer. For 6,000 employees and their beneficiaries, that's a pretty substantial opportunity too.

Dylan Lipner

analyst
#55

Understood. Turning to the regulatory lag docket, is it possible for you to submit a rate case before the ACC issues a policy statement?

Jeff Guldner

executive
#56

Well, yes, that could happen. Once more, I believe what we're seeing is that they are working their way through that process. I think I noted earlier during this call that the soonest you could realistically file anything is the middle of '25. So we're — they're proceeding on the regulatory lag docket. My expectation is that it probably will — it's difficult to say. I mean, new commissioners are joining, so there might be some postponement if they don't wrap it up by the close of this year as it carries into next year, but we'll simply monitor all of that.

Dylan Lipner

analyst
#57

Great. And let's say the commission issues a policy statement. Would you anticipate that the ACC might then pursue something like a rule change in response?

Jeff Guldner

executive
#58

I mean, that could happen. Policy statements do exist, and they're fine serving simply as statements of policy. So I think we'll more or less keep an eye on things as that process unfolds.

Ted Geisler

executive
#59

Dylan, this is Ted — here's another angle we're considering too. If they put out that policy statement, the main point is really to get the commission and stakeholders on the same page that this is the rate-making method they prefer. Then, when we file our next rate case, we'd fold that preferred method in. And that method, let's say formula rates, would then get settled through our next rate case and locked into place by how that case turns out. So we'd still land at the same result.

Operator

operator
#60

Much appreciated. That wraps up the question-and-answer portion. Everyone, we're now at the end of today's event. Feel free to hang up whenever you're ready, and enjoy the rest of your day. We appreciate you joining us.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Pinnacle West Capital Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Pinnacle West Capital Corporation earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Pinnacle West Capital Corporation or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.