Sterling Infrastructure, Inc. (STRL) Earnings Call Transcript & Summary
November 7, 2024
Earnings Call Speaker Segments
Noelle Dilts
executiveThanks, and good morning, everyone, for joining us on the webcast and conference call covering Sterling Infrastructure's third quarter 2024 earnings. It's a pleasure to be with you today as we go over the results alongside Joe Cutillo, who serves as Sterling's Chief Executive Officer, and Sharon Villaverde, Sterling's Chief Financial Officer. Joe is going to kick things off by giving a summary of the business and how it performed during the quarter. Following that, Sharon will walk through the financial results and guidance, and after that Joe will share an outlook on the market and the full year. Then we'll take your questions. Just a reminder that slides are available in the Investor Relations portion of our site, and those slides contain information about our revised financial guidance. Before I hand things to Joe, I'll go through the safe harbor statement. Today's discussion might contain forward-looking statements. Actual outcomes may vary materially from what is stated today. For a fuller picture of the risk factors that might impact these projections and assumptions, please look at Sterling's latest 10-K and 10-Q filings. The company undertakes no obligation to update forward-looking statements because of new information, future events or otherwise. Also, please be aware that management might refer to EBITDA, adjusted EBITDA, adjusted net income or adjusted earnings per share during this call, all of which are financial measures not recognized under U.S. GAAP. As SEC rules and regulations require, these non-GAAP financial measures are reconciled to their most comparable GAAP financial measures in the earnings release we issued yesterday afternoon. Now I'll hand the call over to our CEO, Joe Cutillo.
Joe Cutillo
executiveThanks, Noelle. Morning, everyone, and thanks for being with us on Sterling's Third Quarter 2024 Earnings Call. First off, I want to thank our teams for handing our shareholders yet another record quarter. During the quarter, earnings per share came in at $1.97, which is a 56% jump versus the prior year. Our gross profit margin hit 22%, which shows how we keep focusing on the opportunities offering the best returns and the most appeal; operating income rose by more than 50% while revenue grew 6%, since we keep moving our mix toward services with higher margins. Backlog closed the quarter at $2.1 billion, which is 2% higher than the prior year. Our total backlog was $2.37 billion, which is about the same as it was during the same period last year. The backlog number on its own doesn't tell you how large the opportunity ahead of us really is. As our work shifts toward big multiphase projects in Transportation and E-Infrastructure, we're able to see the later phases of that work with greater clarity. When it comes to those additional phases, we've historically won close to 100% of them. Our pipeline of high probability work remains above $0.5 billion. Beyond that, in our E-Infrastructure segment, what we're seeing in terms of jobs being awarded during the fourth quarter and the first quarter makes us confident that both our backlog and our future phase pipeline are going to grow substantially as we head into 2025. What matters most here is that demand is clearly at our back in every market we serve, and we can see far ahead with a lot of confidence — several years out, in fact. Now, on to the balance sheet. Cash generation was once again a highlight this quarter, coming in at $152 million from operations. That puts our net cash at $326 million, leaving us well positioned to go after acquisitions that extend what is already a solid platform and speed up our growth. As we keep growing and broadening the company, The Sterling Way remains our guide. We have a responsibility to look after our workforce, the natural world, those who invest in us, and the places where we operate as we construct this country's infrastructure. Now, let me turn to how we performed during 2024's third quarter. Within E-Infrastructure — the biggest segment we have and the one with the best margins — sales rose 4%, while operating profit climbed 89%. Operating margins widened by more than 1,100 basis points, landing at a robust 25.8%. Such remarkable margin growth shows how dedicated we remain to pursuing sizable, mission-critical work and to executing it superbly. The data center sector served as the main engine behind E-Infrastructure's top-line growth this quarter, with sales from that market jumping 90% versus the same period a year earlier. Data center projects now account for more than half of the backlog in E-Infrastructure. During the quarter, difficult year-over-year revenue comparisons in manufacturing were outweighed by data center momentum. Small projects continued to trail last year's figures, though we recorded encouraging quarter-over-quarter gains. Awards tied to E-infrastructure reached $314 million, lifting backlog to $919 million — a 3% rise versus the same period a year earlier and 13% higher than where we started the year. Once more, data centers accounted for the biggest share of awards, with customers hurrying to add capacity for technological advances such as AI. Across our business segments, we continue putting our assets to work expanding E-Infrastructure in the Rocky Mountain region, where a number of data center projects are underway. Because we keep gravitating toward those sizable multiphase programs, the pipeline of probable upcoming work has expanded, which hands us dependable sight lines into 2025 and 2026. Now on to Transportation Solutions. Top-line results gained 18%, while operating profit advanced 28%. Compared with a year earlier, margins improved by 67 basis points, reaching 8.2%. The conditions in our end markets represent the strongest we have witnessed across the entire history of this company, and the potential for margin expansion looks extremely attractive. As the quarter ended, Transportation Solutions carried a combined backlog totaling $1.4 billion, about level with the equivalent period a year ago. Awards booked during the third quarter for Transportation Solutions totaled $150 million, while Unsigned awards amounted to $308 million. On top of that, we continue advancing through the early design stage on a number of major progressive design-build highway efforts. Those projects' anticipated overall worth is only partly represented by that design work and backlog. Let's turn to Building Solutions. Segment revenue was down 10% for the quarter, and operating income declined 12%. Performance varied by market and by geography. Our residential concrete slab business saw a 29% revenue decline, driven largely by softness in Dallas. Affordability remains a challenge, and homebuilders believe potential additional rate cuts may be causing buyers to wait. Despite that, builders are hopeful about a significant recovery in 2025. PPG continues to generate solid margins, though it did see some revenue softness this quarter related to the Dallas slowdown. At Building Solutions, the operating margin landed at 11%, a touch below what we posted a year earlier. Keep in mind that within this segment, we have the ability to move quickly on costs so they line up with demand. Our outlook remains highly optimistic regarding long-term demand trends across the residential markets that matter most to us, and we anticipate momentum building as 2025 approaches. On that note, I'll pass things to Sharon, who can walk through the quarter's specifics along with our guidance for the full year. Sharon?
Sharon Villaverde
executiveThanks for that, Joe, and good morning, everyone. I'd like to take you through several details from our financial results, beginning with the backlog numbers. In the third quarter, backlog totaled $2.06 billion, a 2.2% increase over the same quarter last year. Inside that backlog, gross margin was 16.8%, an improvement of 170 basis points from the third quarter of last year. This improvement was driven by a better margin on E-Infrastructure backlog as well as growth in both the size of transportation backlog and its associated margin. Unsigned awards during the quarter amounted to $319.6 million. At quarter end, combined backlog was $2.37 billion, unchanged from the prior year. For the third quarter of 2024, book-to-burn ratios were 0.92x for backlog and 0.86x for combined backlog. Award timing is inherently uneven in our business, and it's better evaluated over multiple quarters. On a year-to-date basis, book-to-burn ratios were 0.99x for backlog and 1.0x for combined backlog. Now moving to the income statement for our third quarter. Revenue was $593.7 million, up 6% from the prior year quarter. Consolidated gross profit for the current quarter was $129.8 million, which is a 41.3% rise over the 2023 period. Gross margin climbed to 21.9%, a 550 basis point gain versus the third quarter of 2023. That margin improvement comes from better performance in E-Infrastructure and Transportation. General and administrative expense represented 5.2% of revenue for the quarter, right in line with what we had anticipated. Operating income in the third quarter was $87.5 million, a 53.1% jump from the prior year quarter. Operating margin rose 454 basis points to reach 14.7%. Our effective income tax rate for the third quarter was 26.4%; for the full year, we anticipate an effective income tax rate of roughly 24%. These items combined produced a record third quarter, with net income of $61.3 million, or $1.97 per diluted share — improvements of 55.8% and 56.3%, respectively, versus the third quarter of 2023. EBITDA for the third quarter came to $100.8 million, a 41.5% increase over the prior year quarter. EBITDA margin rose to 17%, compared with 12.7% in the prior year quarter. Cash flow from operating activities across the first 9 months of 2024 was a solid $322.8 million, versus $331.2 million in the same period last year. Cash flow used in investing activities during the first 9 months of 2024 included $57.5 million of net CapEx. Because of substantial growth in our Transportation segment, we're lifting our expected net CapEx for the year to a range of $65 million to $70 million. On a year-to-date basis, cash flow from financing activities was an $84 million outflow, mainly from share repurchases totaling $50.6 million at an average price of $103.90 per share. During the quarter, $20.5 million went toward buying approximately 188,000 shares at an average price of $108.99. There's still $149.4 million left to draw under the buyback program we already have in place. When the quarter ended, our liquidity position was extremely strong: we held $648.1 million in cash against $322.6 million of debt, leaving a net cash position of $325.5 million. Beyond that, the $75 million revolver — that's our revolving credit facility — sat completely untouched for the entire period. With how well we've performed so far this year and the substantial opportunities we see in each of our operating segments, we're updating our full-year financial guidance. The revised ranges are as follows: revenue of $2.15 billion to $2.175 billion; gross profit margin between 19% and 20%; net income of $180 million to $185 million; diluted EPS of $5.85 to $6; and EBITDA of $310 million to $315 million. Thanks to the diversity and durability of our business portfolio, our healthy liquidity, and a comfortable 1x EBITDA leverage ratio, we're well positioned to chase additional opportunities that deliver meaningful shareholder value in 2024 and beyond — momentum that has already driven over 1100 basis points over 1100 basis points of improvement. With that, I'll turn the call back to Joe.
Joe Cutillo
executiveThank you, Sharon. We look ahead and see many years' worth of possibilities tied to rebuilding the nation's infrastructure. Sterling plays an essential part in constructing the digital backbone that supports the way we live today, the manufacturing output returning to the United States, the roads, spans and airfields that link us together, and the dwellings we call home; within E-Infrastructure Solutions, we expect the present vigor in data center need to persist into the foreseeable future, since existing capacity amounts to just a small portion of what artificial intelligence and other new technologies require. Our clients talk about capital spending roadmaps spanning multiple years and concentrate on how to team up with the appropriate partners who can assist them in hitting their goals. Those clients care deeply about getting to market quickly and seek out dependable, trusted allies; when it comes to manufacturing, we expect that across the rest of 2024 and into 2025, we will witness a reasonably consistent flow of onshoring projects in the mid- to large-size range. Looking toward 2026 and 2027, an enormous collection of mega projects sits on the horizon; that would encompass semiconductor fabrication plants that are planned. How large and how long these projects are is astonishing. Because of the intricacy of developing them, we think some time will pass before awards begin to come through. We expect that e-commerce along with the small warehouse sector will stay weak throughout 2024, yet we take encouragement from the early activity we are observing for 2025. Such forces underpin robust chances for profitability gains across multiple years for E-Infrastructure; for 2024, we expect to produce solid operating profit and think we are nicely positioned for growth in both revenue and profitability in 2025. Turning to Transportation Solutions, we have reached the latter portion of the federal funding cycle. We have accumulated more than 2 years of backlog and keep seeing a healthy amount of activity lying ahead; we think the market setting we now face allows us to maintain heightened growth compared with historical norms, provided that margins stay where they are now or go higher. We have strong confidence that our Transportation business will produce robust revenue and profitability growth in 2024. Regarding Building Solutions, this business is nicely positioned to grow across multiple years. The key markets where we operate — Dallas, Houston and Phoenix — should experience ongoing population gains, which will fuel demand for newly built homes. On top of that, a meaningful chance exists to capture additional share in Houston as well as Phoenix. We expect that affordability hurdles and the schedule of interest rate reductions will keep weighing on demand in the near term. What our customers tell us points to a substantial jump in activity in 2025. We keep working diligently to identify the appropriate acquisitions that would expand the company and improve what we offer as services. The E-Infrastructure market stays our number one priority for M&A. We will stay patient and disciplined when it comes to our inorganic growth approach. When it comes to share repurchases, we will keep being opportunistic. Given how well we've done so far this year and where our backlog stands, we're lifting our profitability outlook for the entire year. At the middle of the updated range, that works out to a 10% increase in revenue, 33% growth in diluted EPS, and 21% growth in EBITDA. On that note, I'll open things up for questions.
Brent Thielman
analystJoe, regarding E-Infrastructure specifically — the profitability this quarter was tremendous, and from what I can see, you'll end up finishing the year somewhere above 20%, I suppose, as the backlog tilts more and more toward data centers. I'm attempting to consider that alongside possibly some of those other markets that could return for you which don't have margins as high — e-commerce, manufacturing. How do you sort of think through maintaining that kind of profitability level in E-Infrastructure going into 2025, so to speak? Yeah, certain things factor in.
Joe Cutillo
executiveYeah, I'd say — yeah, a few things; during the quarter we did observe a pleasant rebound in certain smaller projects, the industrial ones. And what's tough for us with these projects, just to provide some perspective, is that a call can come in today. Here's a real-life illustration from last week while I was with our e-commerce folks. A call can arrive today, we negotiate an agreement tomorrow, and by Monday we're underway on these smaller deals; they appear suddenly and progress rapidly. During the quarter we witnessed a pleasant rebound that I believe most folks would have assumed would have watered down our margins, yet they weren't. For these sizable mission-critical jobs, the margin expansion just keeps getting stronger. And even when that activity returns, we think we'll continue witnessing margin gains in E-Infrastructure as we head into 2025. And never before have I been able to report 1,100% improvement or 1,100 basis points of year-over-year improvement. Still, I feel genuinely good. Brent, we're in the strongest position we've ever occupied; and considering what we're observing on the horizon for the fourth quarter and first quarter, we haven't even reached the second quarter projects; it's incredible. Regarding both margin and growth in the Infrastructure right now, we're extremely, extremely hopeful.
Brent Thielman
analystYeah. Yeah. I guess it looks as though that Mountain region natural growth is paying off quite nicely for you over in E-Infrastructure. Are there additional places where that could be done organically? Or right now, as you were saying, you appear to be considering buying companies within that segment. Is that what's required for entering new geographies?
Joe Cutillo
executiveYeah. So through the Rocky Mountains, we've observed decent organic expansion. It's — we consider just how far those assets can be stretched. Eventually, there comes a point where returns diminish for any equipment located halfway across the nation. Our footprints still leave us a bit of space to grow by another, say, half a state to a state. What we did, though, was build a map showing where we believe the biggest growth chances lie, where we're able to reach, and then we evaluate acquisitions to close those gaps.
Brent Thielman
analystThen my final question is about Building Solutions. It sounds like there's some sluggishness in Dallas, and that might last for a few quarters. I'm curious to hear your thoughts on that, based on what builders are telling you. But also, Joe, what's happening in Houston and Phoenix? Are those markets still growing for you?
Joe Cutillo
executiveYes. So each market has slightly different dynamics. Dallas was definitely down this quarter, driven by a mix of affordability issues. We've picked up some chatter from 1 or 2 builders regarding land availability. Honestly, the whole market is down. But I'll say this: in October, on the plumbing side, our starts were double what they were at the end of September, which is a fantastic signal for us that things might turn around very quickly. For us, that's a leading indicator of what's going on, so that's encouraging. In Houston, we keep seeing growth, with nice year-over-year gains. The market itself is expanding, and we're also figuring out how to push even harder on gaining share in that market. As for Phoenix, I'd say it's still growing. Phoenix is — compared to Houston and Dallas, it swings a bit more from quarter to quarter. Those two tend to be very steady, moving up and to the right. Phoenix also moves up and to the right, but we usually get a bigger spike in one quarter and then less growth the following quarter. Still, directionally, we're definitely pleased with Phoenix and its trajectory, and we don't have any long-term worries about it. Keep in mind, these are the 3 largest markets in the U.S., and all of them have population growth. People will either purchase homes or rent apartments, and we'll shift between the commercial side if the apartment world, multifamily, takes off, or back to first-time home buyers on the residential side. So I think it's a bit of a lull. The other thing builders are telling us is that it seems like many people are on the sidelines, waiting for interest rates to come down again, so they're trying to gauge how quickly and how much these rates will fall. And I understand it — if I were in their shoes and hearing all the talk about rates dropping, and I was out looking at a house, thinking I might get another 0.25 point or 0.5 point by waiting a couple of months, I'd probably do the same. So we're not negative at all. My take is that during the quarter things eased off somewhat, yet when it comes to the outlook, and from actually speaking with the builders just 2 weeks back, here's what I can share: the growth figures they provided for 2025 exceed the projections they handed us across the last 3 years; therefore, our hope is that they've got it right. Their optimism is far greater than what we'd anticipated. Naturally, they possess a deeper understanding of that market and its dynamics than we do.
Adam Thalhimer
analystActually, I'd like to continue along those lines. Assuming they hand you solid expansion forecasts for 2025, would that begin at the start of '25? Or based on what you've seen, would it be more like a recovery in the middle of '25?
Joe Cutillo
executiveYes. Adam, we are going to — we'll truly find out come January. The spring sale ranks among the largest selling periods the builders have. And to reach that spring sale figure, they need to burst out of the gate quite aggressively in January so they can get the — we're the earliest operation dealing with slabs. They have to bring those slabs in and place the order, and roughly 90 to 120 days later, they're selling the house; so at times we'll notice it in late December, but because of the holidays, it generally doesn't begin until January. Once more, we're quite — we're extremely pleased with the starts we witnessed on the plumbing side in October; we wouldn't have anticipated that. So that's a positive sign. And after that we'll monitor the slab side as we move through the remainder of this year.
Adam Thalhimer
analystAll right, that sounds positive. Could you discuss how the top line performed across segments during Q4? I'm running into some difficulty arriving at the revenue guidance figure.
Joe Cutillo
executiveMy sense is that I don't have the quarter's breakdown by segment available. I believe we'll — it's basically just working through the arithmetic, correct, to complete what's missing. Sharon, do you happen to have those precise figures, along with additional specifics on that?
Sharon Villaverde
executiveSpecific guidance isn't something I'm able to give. My view is that we keep showing up strongly in E-Infrastructure relative to the year before. And in the same way — well, with Transportation, the comparable period a year ago was quite strong; as a result, we likely won't be as strong in Q4 '24 as we were in Q4 '23. Building Solutions, meanwhile, stays fairly flat, maybe up slightly.
Adam Thalhimer
analystWhich Q3?
Sharon Villaverde
executiveComparing to prior year.
Adam Thalhimer
analystGot it. So, Joe, can you give us a big-picture view of what you're seeing first with data centers? And then, what can you tell us about e-commerce distribution centers?
Joe Cutillo
executiveSure, sure. I'll start — actually, let me take those in the opposite order. If you remember, going back to '22, Amazon was — we were discussing '23, and we did 0. I was all set to tell everybody that in '24, we did 0. But last week, we started Monday; we — this is literally a job that came in last Tuesday, with pricing locked down Wednesday, and work began this Monday. It's for Amazon's first distribution center as they kick off the program. There's a second opportunity we're looking at, which should kick off either at the end of this year or at the start of the next one — so that gives us reason for optimism. Their original message to us was that the program would be restarted in '25, and by all appearances they're right on schedule, maybe even somewhat ahead of it. Add to that the improvement we're starting to see in small industrial. If interest rates come down today, and then come down once more before this year is over, our view is that a recovery will start to take shape. Our earlier projection pointed to the second quarter of next year. With luck, it shows up slightly earlier than we had expected. As a result, our confidence is growing in both of those segments. Now, when it comes to data centers, here's what I want to share with you. We're seeing a lot more liquid-cooled data centers show up than we had expected — honestly, they're just raining down on us. Opportunities keep piling up daily. Adam, the thing I believe everyone overlooks is the amount of work sitting in our pipeline and how substantially it will expand across the coming two quarters. My guess is that by late in Q1 or around the midpoint of Q2, that pipeline of additional work — beyond what's already in backlog — will reach at least $1 billion, and it will land in 2025 and 2026, with some of it now beginning to spill into 2027. Right now, I believe folks are being seriously misled about what our backlog actually contains. Let me give you a clear illustration. That Amazon distribution center project comes to about $17 million; what sits in our backlog for it is $300,000, and that's because of the way the contract is structured. So we already know what we'll receive. Our backlog can be quite deceptive, since we don't — it comes down to how the contract is drafted and the rules for how we must record it. So if I were placing a bet, as I always put it, I prefer to play cards when I'm aware of my hand and everyone else's. Our situation is extremely strong, and what we're witnessing isn't just different from anything before — it keeps surpassing what we anticipated would emerge.
Adam Thalhimer
analystOkay, so that's just E-Infrastructure we're talking about there. My understanding is that during the prepared remarks you also mentioned that for some Transportation projects, the backlog figure is quite small since it captures design work only, not the construction itself. So one thing I wanted to ask: if that construction were factored in, what would the addition to backlog be?
Joe Cutillo
executiveOur knowledge is that today, combined and in total, it exceeds $0.5 billion. The bulk of that sits within Infrastructure. However, once we move through the design stage on a number of these sizable design-build efforts, we'll be carrying multi-hundred million dollars of future phased backlog in Transportation. So as we see Transportation right now, we hold approximately 2 years of backlog. The work we're engaged in stretches further ahead. There are another 2 years left on the transportation bill; we expected that when the transportation bill, the IIJA, wraps up, we'd be sitting at somewhere between 2 or possibly beyond 2 years of backlog at that moment. So we are — explaining this to people is difficult, but we're here examining our current position, the pipeline, and our committed work, and our confidence is extremely high.
Julio Romero
analystYou discussed a stream of upcoming business in the E-Infrastructure segment. You brought up certain short-term onshoring efforts during '24 and '25, plus the significantly bigger efforts ahead in '26 and '27. So how are you weighing the current speed of your proposals against, say, preserving your available capacity for those '26, '27 mega projects?
Joe Cutillo
executiveWell, I'd say the positive part is that right now we're able to move at maximum effort. And when we anticipate those efforts arriving, there's ample time should we require building additional or surplus capacity for that purpose, and that's what we'd do. So we aren't scaling back on any of these mission-critical jobs. We're filling the boat as much as we can with them. And once these mega jobs appear, we'll be fine. We're very good at expanding up very rapidly, and we're not concerned about that.
Julio Romero
analystAlright, that's useful. And so I suppose, this is fact...
Joe Cutillo
executiveAllow me to clear up a single point — permit me to clear up a single point regarding the pipeline, if you will.
Julio Romero
analystPlease, go ahead.
Joe Cutillo
executiveRegarding this multiphase pipeline we've been discussing — what we're talking about isn't prospective work sitting out there for us to place a bid on. What it involves is follow-on work tied to projects already in our book. That's a major distinction. I'm not referring to $1 billion; the work out there we're eyeing is far greater than $1 billion. This is work already ours that will attach as either incremental contracts or change orders to the contract we already hold in order to finish the project. So it isn't something we're crossing our fingers might materialize. It has to materialize for the project to reach completion; it's more a matter of the contractual framework they've set up, which prevents us from recording all of that backlog at a single point in time. I'd say to you right now that had we been able to do so, our backlog would sit up well past $0.5 billion, and everyone would be remarking, "Oh my God, look at all this work." As it stands, people remain confused since our backlog is holding relatively steady, while we're aware it's genuinely expanding, okay? So I simply want to confirm that this is accurate.
Julio Romero
analystNo, that helps a lot, and it provides some background on the order in which you expect things to unfold moving ahead. You brought up earlier as well that a few of those smaller E-Infrastructure deals that recovered somewhat during Q3 did not water down margins. Could you elaborate on that a little? Are you approaching the small industrial, quick-return type projects differently when it comes to bid margins or contract terms that are — please continue.
Joe Cutillo
executiveThe truth is that smaller projects come with lower margins, all right? That isn't going to change. What is going to change is the speed and rate at which we're expanding these mission-critical projects. And honestly, we're recognizing that the value we deliver to customers is even greater than what we perhaps priced and presented before. And as projects get bigger, we can generate far better execution efficiencies; so we're capturing additional efficiency points on the back end of these projects compared to anything we've done previously. And credit for that goes to our team and the excellent work they've delivered. It's also — we've brought in certain technology elements to where we now are. I won't take you through all the details on this call, but you'd see what we're doing with drones for measuring, monitoring, and project management — what drones can now do to see through trees and through areas where you previously couldn't get accurate takeoffs. If you get the volume of dirt wrong by 6 inches across 400 acres that must be moved, that's significant money. Being able to nail down those numbers the way we can now — that's added productivity. So there are 100 things of that nature that we keep doing, keep pushing, and are examining how we can do them even better going forward.
Julio Romero
analystThat's really useful. For my final question, you posted another strong quarter when it comes to cash flow. Could you walk through what's driving that, and what the trajectory ought to look like from here?
Joe Cutillo
executiveSure, that trend isn't going to stop. We've been really effective at drawing down on customers' money. Our philosophy is that this is the right thing to do. The manner in which we put together our contracts and our bids lets us accomplish that right from the start. When it comes to bigger projects, we usually collect a larger chunk of cash early on, and that's a good thing. If you take a forward view and prefer to stay conservative, our cash flow ought to remain roughly at the operating income level, if not above it. And nothing we can see would alter how the cash flow behaves down the road. The terms in our contracts haven't moved. The end markets for our customers are essentially unchanged. So — yes, everything's pointing in a positive direction; we're putting a lot of effort into figuring out what to do with all that cash. That's what matters most to us.
Joe Cutillo
executiveOnce more, I'd like to express my appreciation to all of you for being on today's call — a further thrilling quarter for the Sterling crew. Should you have additional questions or would like to arrange a conversation with us straight away, please reach out to Noelle Dilts, whose details appear in the press release. So, I wish all of you a wonderful day, and we're grateful. Thank you.
Operator
operatorLadies and gentlemen, this concludes the conference. You may now disconnect your lines.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Sterling Infrastructure, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Sterling Infrastructure, Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Sterling Infrastructure, Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.