Sterling Infrastructure, Inc. (STRL) Earnings Call Transcript & Summary
August 4, 2026
Earnings Call Speaker Segments
Noelle Dilts
executiveHello, everyone, and thanks for joining us for the Sterling Infrastructure Second Quarter 2026 Earnings Conference Call and Webcast this morning. It's a pleasure to be with you to go over our results alongside Joe Cutillo, Sterling's Chief Executive Officer; Nick Grindstaff, Sterling's Chief Financial Officer; and Dan Govin, Sterling's Chief Operating Officer. Just a reminder that slides are available in the Investor Relations section of our website, and those slides contain information about our full year 2026 financial guidance. Ahead of handing things to Joe, I'll go through the safe harbor statement. Today's discussion might contain forward-looking statements. Our actual results may differ materially from what is said today. For a fuller picture of the risk factors that could impact these projections and assumptions, please look at Sterling's most recent 10-K and 10-Q filings. The company undertakes no duty to update forward-looking statements because of new information, future events or otherwise. Also, please be aware that management might mention EBITDA, adjusted EBITDA, adjusted operating income, adjusted net income or adjusted earnings per share today, and all of those are financial measures that are not recognized under U.S. GAAP. Under SEC rules and regulations, these non-GAAP financial measures are reconciled to their most comparable GAAP financial measures in our earnings release, which was issued yesterday afternoon. At this point I'll hand the call over to our CEO, Joe Cutillo.
Joseph Cutillo
executiveAppreciate it, Noelle. Morning, everybody, and thanks for being on the call for Sterling's second quarter 2026 earnings. We turned in yet another excellent quarter, posting revenue growth of 90% along with adjusted diluted EPS growth of 116%, moving from $2.69 up to $5.80. Those figures speak to how well our strategy is working, demand picking up speed in our markets, and the superb job our teams are doing. Adjusted EBITDA was more than double what it was a year ago, and margins rose 150 basis points compared with the prior year, landing at 22%. With demand where it is right now, we can afford to pick our spots. Instead of pursuing every single opportunity, we're zeroing in on the projects that deepen our customer ties, set us up for growth down the road, and lift our margins. Signed backlog stood at $4.3 billion when the quarter closed, a 116% jump versus the prior year, while combined backlog climbed 150% to hit $5.6 billion. On top of that, we can see high probability future phase opportunities worth more than $1.4 billion. When you put our signed backlog, unsigned awards, and future phase opportunities together, that gives us line of sight into a total addressable pool of work exceeding $7 billion, which is more than $2.5 billion higher than where we stood at year-end. The quarter's gains in backlog and future phase work, along with the visibility we have into customers' multiyear capital plans, only bolsters our confidence in the multiyear outlook. Now let me walk through our segment results for the quarter in greater depth. Over in E-Infrastructure, second quarter revenue was up 192%. Mission-critical activity, which includes work on data centers and semiconductor campuses, drove most of that growth during the quarter. E-Infrastructure adjusted operating income rose 148%, and adjusted operating margins stayed solid at 24%. Our margins keep gaining from how well we execute on big, time-sensitive mission-critical projects. Revenue from our site development operations was more than double on an organic basis, and adjusted operating margins widened both against last year and versus the previous quarter; growth was strong across every geography we operate in, with our Rocky Mountain division standing out in particular, where revenue came in nearly 700% higher. We likewise posted solid gains in our Northeast business as work ramped up on our large semiconductor campus. CEC's revenue growth came in at 140% against its second quarter a year earlier, with margins improving both year-over-year and quarter-over-quarter. The Texas market is still incredibly strong. During the quarter, CEC locked up a number of additional project wins, which added $1.7 billion to its combined backlog compared with the end of 2025. Beyond that, we keep winning projects where we handle electrical and site work together in an integrated fashion. We're still seeing enormous opportunity ahead in both electrical and site development. All told, our E-Infrastructure signed backlog, unsigned electrical awards, and future phase site development opportunities have now passed $6 billion, which is $2.7 billion more than at year-end. Mission-critical work, covering data centers, large manufacturing projects, and semiconductor, made up over 92% of E-Infrastructure signed backlog when the quarter ended. Future phase work is mostly tied to mission-critical projects. Shifting to Transportation Solutions. Second quarter revenue fell 20%, which mirrors the ongoing shift of our resources away from transportation projects toward higher-margin E-Infrastructure projects. The pace of this change has picked up, since we're seeing more activity on the E-Infrastructure projects we have underway in the Rocky Mountain and Texas regions. During this quarter, for the first time, our Rocky Mountain operation brought in more revenue from E-Infrastructure than from transportation; on top of that, we're still winding down the low-bid heavy highway work we have in Texas, and that work is close to wrapping up. In the quarter, adjusted operating margins for Transportation Solutions hit 19.5%, an increase of over 500 basis points compared with the same period a year earlier, while adjusted operating income rose 8%. Our emphasis on going after the most appealing opportunities in the transportation market is what fueled the margin and profitability strength. We closed out the quarter with Transportation Solutions backlog totaling $969 million, which is 35% higher than a year ago. Mostly, that reflects unsigned backlog being converted into signed backlog. Looking at combined backlog, Transportation Solutions has risen 8% relative to second quarter 2025 and has fallen 11% relative to year-end 2025. Now turning to Building Solutions. Segment revenue was down 1% for the quarter, which came from homebuilder activity that was relatively flat, and adjusted operating margins came in at 9.9%; we still expect the residential market to encounter strong headwinds all through 2026. Because Sterling has a diversified portfolio and a strategy centered on growth in high-margin end markets, we were able to deliver yet another outstanding quarter. With that, I'd like to hand things over to Nick, who can walk you through more detail on a few of our financial metrics and our 2026 guidance. Nick?
Nicholas Grindstaff
executiveAppreciate it, Joe, and good morning to everyone. I'll kick things off by going over our consolidated backlog figures. For the second quarter, backlog came in at $4.3 billion, which represents a 116% rise compared with the same period last year. On an organic basis, backlog was up 50% year-over-year even with the heavy revenue burn we saw during the quarter. Our combined backlog reached $5.6 billion, marking a 150% increase, or 36% organically. Book-to-burn ratios for the second quarter of 2026 stood at 1.4x for backlog and 1.3x for combined backlog, leaving out any effect from the Stone Ridge acquisition. Now shifting to cash flow. Operating activities generated $328 million in cash during the first half of 2026; we anticipate that operating cash flow will stay strong through the entire year. Investing activities used cash that included $70 million in CapEx. Because our full year 2026 revenue expectation has risen substantially over the last 6 months and given the visibility we have into future demand, we're raising our CapEx guidance to a range of $130 million to $140 million, which works out to a $30 million bump from what we previously guided. These added investments in our fleet will boost productivity and add capacity. Financing activities in the first half of 2026 resulted in a $48 million outflow, which included $35 million of share repurchases at an average price of $511.18 per share. At quarter's end, $339 million remained available under the existing repurchase authorization. Our stance on share repurchases will continue to be opportunistic. Let's move on to the balance sheet. We finished the quarter holding $464 million in cash along with $284 million of debt, giving us a cash net of debt balance of $181 million. On July 2, we completed the extension and expansion of our revolving facilities up to $1.5 billion and pushed the maturity out to July 2031. We drew on this facility to retire our existing term loan. The amended facility gives us added flexibility as we pursue growth, whether organically or through M&A. With our current backlog, visibility, and robust market tailwinds, we're set up for a year that's even stronger than what we first expected. We're lifting our guidance ranges for 2026 to account for both the better outlook for the core business and the addition of Stone Ridge. Our guidance ranges are as follows: revenue of $4 billion to $4.15 billion, diluted EPS of $17.25 to $17.85, adjusted diluted EPS of $19.70 to $20.30, EBITDA of $829 million to $854 million, and adjusted EBITDA of $891 million to $916 million. At this point, I'll hand the call back over to Joe.
Joseph Cutillo
executiveAppreciate that, Nick. The favorable momentum we've discussed across the last few quarters keeps picking up speed. Projects are coming to us bigger, with more complexity, and running longer, and that says something about both the size of what's getting built and how much these assets matter to our customers. Customers want more from us. They keep bringing us into additional regions since they recognize Sterling gets complicated work done quicker and more safely than anybody else. Because customers see how essential our role is in their success, we've earned a seat in their long-range planning. Looking forward, the opportunity will be much bigger than what we first expected. Staying ahead of what's on the horizon is where our attention sits right now. On the inside, we're making certain the proper personnel, tools, and capability are ready to back continued robust expansion in the years to come. Now I'll pass things to Dan Govin, our Chief Operating Officer, so he can walk through a few of these main priorities. Dan?
Daniel Govin
executiveAppreciate that, Joe. A key element of our strategy involves preparing for what lies ahead. Meeting current demand isn't our only concern. Right now we are putting money into our workforce, our machinery, and our capabilities, all of which will underpin lasting expansion in the years ahead. Our employees continue to be the biggest edge we hold over competitors. As clients take on bigger, deadline-driven, business-critical initiatives throughout the nation, our seasoned project leaders and operational crews distinguish us via outstanding day-to-day performance; that is the reason we keep raising what we spend on cultivating, drawing in, and keeping the finest talent in this industry. By broadening our recruitment push and offering development initiatives such as Sterling Academy and CEC University, we are equipping workers with the skills required to back our faster growth. Alongside our solid standing for safety, quality and execution, these outlays establish Sterling as the top workplace, which helps us bring in talent as we move into fresh territories. We are likewise placing money wisely into our machinery lineup. As we expand and enlarge that fleet, we boost our capability and enhance productivity plus operational efficiency across additional regions; this yields advantages that underpin margin growth in the long run. Over at CEC, we are achieving substantial headway in boosting output at our prefabrication sites, which will lift efficiency among our field electricians and deliver expense reductions. Last of all, we are rounding out these internal commitments with bolt-on purchases; such deals deliver robust regional management while broadening our footprint in desirable markets. The latest Stone Ridge purchase exemplifies this approach perfectly, since it sets us up nicely for upcoming work in the Pacific Northwest. Taken together, these deliberate outlays guarantee we are positioned to seize major prospects that lie in front of us. At this point I'll turn things back over to Joe.
Joseph Cutillo
executiveAppreciate that, Dan. Now let's look at what we're expecting from each of our segments in 2026. Over in E-Infrastructure Solutions, demand for big, mission-critical infrastructure remains extraordinarily robust, and our view is that this will drive substantial growth stretching across many years ahead; within the data center market, the level of customer activity has never been higher. The projects themselves keep getting bigger, they run for longer periods, and they keep spreading into additional markets nationwide. Beyond simply seeing a greater number of new projects, a lot of the projects we already have are expanding far past what was originally planned. A good deal of this added opportunity hasn't shown up yet in our backlog or in future phase opportunities, which gives us even more confidence about the runway in front of us. Through the CEC acquisition, our capabilities have been widened, and we're now positioned even more strongly to serve our data center customers. When it comes to the semiconductor market, things are going very well on our Northeast project, where we're actually ahead of schedule. We expect this project to bring in substantial revenue during the third quarter, followed by a weather-related slowdown in the fourth quarter; our thinking is that the outstanding performance we're delivering here will establish us in the semiconductor market as the go-to solution for large, complex projects, the same way we've already done in the data center market. Alongside data centers and semiconductors, we're also picking up some momentum in the wider manufacturing market. In the second quarter, we were awarded the initial scope of work on an electric vehicle plant in Atlanta. On top of that, several opportunities remain that we think could be awarded in 2026 or early 2027. Looking at the full year 2026, we now expect E-Infrastructure segment revenue growth to come in above 100%, with the contribution from CEC and Stone Ridge included. We anticipate the legacy site development business growing at rates near 70% or higher, as a number of our large projects pick up speed. For E-Infrastructure, adjusted operating profit margins should land in the mid-20% range. Moving to Transportation Solutions, we're currently in the last year of the federal funding cycle, which wraps up in September 2026; we've accumulated more than 2 years of backlog and continue going after select attractive opportunities. For 2026, our expectation now is that Transportation Solutions revenue will fall somewhere in the 7% to 10% range, since we're moving resources toward e-infrastructure work more quickly. We're expecting considerable year-over-year adjusted operating margin expansion, approximately somewhere between 150 and 200 basis points. As for Building Solutions, our expectation is a modest revenue decline in 2026, with adjusted operating margin landing in the high single to low double digits. We still see chances for share gain as we come out of the down cycle. Changing topics — as we look toward the second half of the year and into early 2027, our belief is that today's strong levels of bid activity will convert into strong awards. That said, because timing can be lumpy, third quarter awards might come in softer, with stronger levels arriving in the fourth quarter and early 2027. When you combine that with what we expect for significant revenue burn during Q3, we might see backlog fall sequentially in the third quarter. That would be a matter of award timing rather than any shift in demand. As for acquisitions, we keep seeking out deals that fit strategically — ones that would strengthen what we offer as services, broaden where we operate geographically, and increase our capacity. Compared with 12 months ago, we're finding more attractive, high-quality acquisition candidates in the market right now. Now, regarding our full year 2026 guidance, taking the midpoints of our ranges against the prior year, that would mean revenue growth of 64%, adjusted EPS growth of 84%, and adjusted EBITDA growth of 79%. With that said, I'd like to open things up for questions.
Brent Thielman
analystNice work on the quarter. Joe, for my first one, when I look at backlog, it's 2x what it was 12 months back. Stone Ridge is also adding to things in the back half. It's a bit surprising that revenue wouldn't step up more in the second half. So I'm curious — is some of that backlog tied to longer lead times than normal? Or is it simply that more work kicks off later this year or in 2027? Could you expand on that a bit?
Joseph Cutillo
executiveSure. Brent, we have a lot of confidence in that backlog, and those projects are moving forward as planned and are underway. What I'd say is, at the moment we're taking a very cautious stance on Q4; you never can tell what the weather will do in Q4. Should conditions match what we saw last year, my belief is Q4 would come in far above what our forecast shows; but honestly, we're simply staying cautious with the outlook; there's a lot of work in front of us and a lot of opportunities on the way, particularly as we move into Q4 and Q1, we're seeing some genuinely robust bidding activity that will occur then. So no, it isn't any kind of slowdown, it's more that we're behaving cautiously; guidance has been lifted by us a few times; we've risen substantially across every area. CEC was something we'd never have anticipated. They've been with us for roughly 12 months, and we've already doubled that business. So great progress is what we're seeing — it's just our cautious way of doing things.
Brent Thielman
analystRight, got it. Okay. And regarding that CEC point, Joe, perhaps you could describe the makeup of the newly won or still-pending work. At the electrical business, it appears award activity has risen enormously. Could you discuss how the scale and reach of certain pursuits have shifted, the margin profile you're beginning to observe, and your thinking on how margins will develop for this business moving ahead?
Joseph Cutillo
executiveSure; CEC has us absolutely thrilled with what they're accomplishing. Looking back to when the acquisition closed, our expectation was that filling their capacity would require a year, and we'd even discussed moving some resources into the Southeast. Their capacity was filled in roughly 90 days. Consequently, they've expanded very well. What the numbers don't reveal, I think, is what's occurring and what's on the way from CEC. Among the strategic moves we committed to was exiting certain end markets where they provide services we'd decided to leave; that exit process is underway right now. It requires some time. So our view of the business separates the legacy portions we're departing from and the rest of the business as it progresses. Looking at that portion, margins are climbing extremely well in that area; on top of that, average job size is rising considerably; and one of the genuinely gratifying developments this quarter, again, something that isn't visible, is that CEC is securing the second buildings at data centers where they already work, which signals performance meeting or exceeding what customers expect and means they're receiving subsequent phases and higher levels of work. So all of it is unfolding precisely as we'd anticipated. They're performing excellently. They're expanding extremely quickly and bringing on more capacity. And honestly, we believe that with 1,000 or 2,000 additional electricians, growth would be even quicker. So we have numerous initiatives running, not just for developing electricians, but we also have an entire recruiting team out there every week bringing those electricians aboard. So — it's been terrific. The sole negative, which I think is the only explanation our stock isn't up exponentially today and appears to be down, is that mix is making our margin appear lower. And examining each element of E-Infrastructure, margins rose across every single piece of it. Mix is the sole factor behind the margin difference. When CEC grows 140%, we're delighted. We'd accept that every day of the week. If our Rocky Mountain operation shifts away from transportation toward E-Infrastructure and expands by 700% within 12 months, that's something we'll gladly accept.
Brent Thielman
analystYes, got it, Joe. Thanks for clearing that up. Maybe just one final thing — any update on how the cross-selling between CEC and the legacy site development business is going?
Joseph Cutillo
executiveYeah. So compared with the second quarter, we're currently present at a greater number of sites; and looking ahead, many of the data centers that are going to come online — let me back up a moment. Put it this way: the chances we've had for joint efforts have outpaced our electrical-side capacity. So, Brent, as that capacity gets built up, that figure is going to rise. The explanation it isn't rising even quicker than it is — well, it's actually rising quicker than we expected. We figured it would take until now to land our first one; we're at 3 or 4 already. It comes down to nothing but capacity. Our customers keep requesting it. Were we running a union operation, I'd say to you that with the electrical side we would be at a semiconductor plant up in New York at this very moment; so the requests are coming in. They recognize the value proposition. Honestly, it's turning out even more powerful than we expected; we're quite bullish about it. So that leaves us very pleased. The quicker we can scale additional capacity, or as you're aware, we're examining — and will keep examining — acquisitions in and around this space; if we can bring on some capacity that way, the more joint projects we'll be involved in.
Louie DiPalma
analystJoe, you brought up that CEC runs at thinner margins compared with site development, and that CEC margins ought to improve quite a bit. Broadly speaking, could you talk about where CEC margins might eventually reach over the long run? And more generally, why does such a large gap exist between site development margins and electrical services margins? Could those two eventually move closer together?
Joseph Cutillo
executiveSure. First, I want to keep everyone from getting carried away. At no point do we anticipate electrical margins reaching the heights that site development hits. Site development comes with far more layers of complexity and variation, plus there are levers we can pull to genuinely reshape the scope and boost efficiency on those jobs, whereas an electrical job is fairly fixed, correct? The design is set, the quantity of wire is set, and so on — I'm oversimplifying here — but it's fixed. So the upside there is limited. That said, neither we nor CEC are pleased with where margins stand right now. As our project mix improves, we anticipate 300 to 500 basis points of margin gain on top of certain internal initiatives, and we've indicated this would play out across 12 to 18 months. My guess is some of it shows up sooner. The quicker we exit some of these other items, the quicker the improvement arrives. We're monitoring this intently. We review it monthly, Louie, and we've witnessed strong improvement. The team is performing excellently on that front. Looking out 3 to 5 years, I can't see a reason why. Currently, electrical as an industry sits at roughly low double-digit margins — let's say 10% to 12% EBITDA margins. I can't see a reason why we couldn't approach 20%. Honestly, I can't. Given the scale of the projects, the scopes, and how good those projects are, our aim across a long stretch of time is to reach that level. And we've had considerable success pushing margins in our businesses well beyond what others achieve, and we believe we can repeat that.
Louie DiPalma
analystGreat detail. I also wanted to ask — can you give us a fuller explanation of why the future phase work metric doesn't always reflect everything you can see coming in your pipeline?
Joseph Cutillo
executiveSure. That's a good one. One factor is that if you've been around us long enough — and most folks listening on this call have been around us long enough — you know we lean pretty conservative; if anything, our aim is to beat expectations and keep people happy. But here's something we leave out, and we've been considering how to get this across more effectively: right now we're involved in plenty of projects where the scope is defined for constructing a portion of a property. Picture a scenario with 600 acres of land, and the client tells us 5 buildings will go up on the initial 300 acres, followed by 5 buildings on the remaining 300 acres; our discussion only covers the initial 300 acres, right? We're aware that once that portion wraps up, the equipment gets moved over to the other one. Yet that project hasn't been fully pinned down and spelled out. Still, from other projects we've worked on, we know that's what tends to happen; and there's another factor at play here, Louie, which is a fairly recent development — we're watching them buy additional property on projects we're already working on. So imagine we're on a 300-acre project right now. There's actually one similar to that; the client has since bought another 600 acres adjacent to that property, and they intend to expand and develop it; none of that appears in our figures. Yet we're already on site. We're engaged with the customers. We're collaborating with them on plans; we're working with them regarding what's ahead; historically we've described these projects as lasting 3 years. We just wrapped up our executive leadership team meeting, and we're reviewing projects alongside our team. And quite a few projects will keep us there for 5 to 8 to 12 years if they keep expanding on that property — it's unbelievable. So none of that goes into our future phase book at present. And we're trying to find a way to stay very conservative while still — I don't think we're giving the outside community a sufficient picture to grasp that when our people say they'll be on a job for 5 to 8 years, we don't discuss that much. We discuss the 3 years since that's the project scope we're handling. People simply don't grasp the size and scope of these jobs and how long they last. It's growing considerably larger, which suits us perfectly. Keep in mind, we don't only have the site side — we now have the electrical side that remains there for another couple of years after the site work wraps up; so our visibility keeps improving. Project size keeps growing. Thus, our confidence is high that this chance is significantly larger than what we've previously discussed. Yet another strategic effect has emerged: we'd already committed to an extremely forceful plan for expansion from within, we believed, along with an approach for creating that capability. Once we paused and examined these initiatives—both the magnitude of those currently underway and those still to arrive—we told ourselves, wow, we truly need to speed up how quickly we bring on more capability merely to match this demand. All of that is thrilling. Clearly, it presents a difficulty for us. Historically, we've been at ease with growth from within at 20% to 30%; in the current year, our expansion far exceeds that; and we must determine a way to match that tempo.
Brian Brophy
analystGreat quarter. Could you help us understand how pricing along with terms and conditions are moving inside your E-Infra backlog right now compared with 12 months ago?
Joseph Cutillo
executiveNothing has really changed in a fundamental way, from what we can see. On the electrical side, there have been a handful of tries to insert certain terms and conditions into some items, and honestly, we did not agree to those. Still, no meaningful change in any of that has shown up, correct? Nick, do you know anything about that?
Nicholas Grindstaff
executiveNo.
Brian Brophy
analystThanks for that. Now, regarding what you said about capacity — could you give us a bit more detail on the spare capacity you currently have? Which areas are the most strained for you? And how do you view your capacity to bring on additional project managers and equipment if the demand environment stays as strong as what you're currently observing?
Joseph Cutillo
executiveSure. The area that's most strained, without question, is electricians. That's where I'd begin. That part of the market is always the most strained. Our teams have performed very well in ensuring we maintain a sufficient supply — or a sufficient count — of electricians to handle the work we've got. Honestly, it has limited our ability to take on additional jobs beyond what we could handle. There are additional opportunities out there, including some of the joint opportunities we mentioned earlier; so we're putting in a lot of effort there. When it comes to the site side, we've performed very well. But I'll be honest with you — for the first time, the capacity piece is getting quite strained; we've been able to flex up proactively. Several years back, we took some proactive steps to ensure we were ready for some of this. And as we extend further and further geographically — and let me remind everyone, geographic expansion for us in the past, when we had Plateau and Petillo, meant going roughly 1 state beyond where they were, maybe 2 states. Today we're serving the East part of Texas out of Atlanta and the west part of Texas out of Utah. That's a far greater stretch than relocating 1 or 2 states. Consequently, it calls for a few more resources. You can't leverage local resources as much when you can bounce around. So capacity there is getting strained; so we're doing — as Dan mentioned, we're doing things on the equipment side. We're doing things on the people side; but another significant part of this is that we will need to make additional acquisitions in and around the geographic expansions we're in, so that we can add that pure human capital resource to execute these jobs; so I think going forward, we're beginning to look at somewhat smaller players where we'd prefer to have really large players, but unfortunately, there really aren't that many available and supplementing them with some of our resources. So we don't need to place a full team in Texas; we can place a partial team alongside an acquisition in Texas or in New Mexico or Oklahoma, wherever that might be. And that assists us in building that capacity quicker and faster and it's somewhat what we're doing with Stone Ridge, frankly, and the reason we made that acquisition.
Alex Rygiel
analystGreat quarter, guys. As more phases of work are released, do those go out for competitive bids? Or is Sterling essentially just negotiating these follow-on phases directly? And along the same lines, are you noticing more competition for those additional phases of work?
Joseph Cutillo
executiveYes. So when we deliver, and we have every month, I can't think of a single instance where we failed to win a later phase. Typically, we're working out the pricing for that future phase work directly with the customer. Unless there's a drastic scope change — say something falls outside our project and they want something added that isn't part of our normal scope — that would go through a standard bid process; we'd hand them a number, and it wouldn't be unusual for them to also collect a number from someone else. A good illustration: they need to build a road to reach a new phase, requiring paving, curbs, and various other items. They might ask us for a bid on that; we could subcontract it, or they could put it out to bid with another party. But generally speaking, once we're on the job — and this matters a lot, and I'll speak strategically about what we're doing and why we're moving so fast in Texas and certain other markets — as our teams would put it, once we plant our flag, we are there. We aren't going anywhere. That creates the chance to boost project productivity along the way, and as you've observed, margins on our future phase work typically come in stronger than on our early phase work, correct? So we'll be extremely aggressive to plant that flag; then we'll leverage productivity and technology to push margins higher across the remainder of that project and secure improved margins for each phase as we move forward.
Alex Rygiel
analystAlso, could you discuss a few of those additional end markets where green shoots are appearing, such as pharma, semi, and other factories?
Joseph Cutillo
executiveSure. And going back, there's one item I left unanswered regarding the competitive landscape. Local rivals always show up, particularly when we enter a market that's new to us. Many smaller companies exist. Usually, though, once we complete a single job, that group shrinks considerably. Honestly, securing that initial project is the toughest for us. Still, we haven't observed a wave of significant new entrants or anything like that, particularly involving these big projects. In one of our markets, someone might land a data center worth $20 million or $30 million. Generally, we won't even consider those unless the customer pushes us to. So such situations will keep occurring; however, no substantial surge of large competitors has appeared in our markets. Pardon me, what was the following question?
Alex Rygiel
analystWhat about other end markets, such as pharma, semi, and other factories — is there any movement there?
Joseph Cutillo
executiveYeah, so we — everything there still looks like it's moving forward, in our view. Pharma, we believe, is '28. Semis land somewhere around 2030. I'll say this: the team up in New York is performing exceptionally well. What I mean is they've made — I won't name them, but they've made all the local news up there and some of the national coverage too, about how far ahead of schedule this project is running. The general contractors working the job, and the end customer on it, are both incredibly pleased, and honestly, they've never witnessed progress like what these guys are achieving. My sense is that becomes our doorway into a lot more semiconductor plants for us, arriving around 2030. That said, I think some intermediate opportunities might come along involving certain facilities under construction right now in regions and geographies where we historically haven't operated, and we may get pulled into those. On top of that, this quarter we saw the EV plant in Atlanta — just outside of Atlanta — get started; so in the manufacturing space we're seeing a mix of activities, one-off, two-offs, that kind of thing. So far, though, no delays have shown up in pharma or in the next generation of semiconductors.
Manish Somaiya
analystNice work on the quarter. Joe, I've got a few things to ask. First, looking at the broad picture, there's clearly plenty of coverage about data centers getting prohibited across many new markets. I believe an article came out yesterday regarding Texas and Greg Abbott blocking fresh data center approvals. Perhaps you could give us some insight into how things actually stand on the ground, since you're obviously nearer to what's taking place. Are projects genuinely being pushed back? Or is this simply the usual political maneuvering? That's my first one.
Joseph Cutillo
executiveRight; we have not — definitely — nothing has come up that has affected any of our timelines so far. Certain states are going to exist. I believe folks need to recognize, some states and geographies are never going to host data centers, or will host extremely few — in New York, which appears to oppose anything generating revenue for the state, they've prohibited data centers, and that's one example. Over in Texas, things are progressing quite rapidly. My sense is we'll keep witnessing, as with any new and any large undertaking, there's always a political dimension stirring up a fuss, I suppose that's the finest way to describe it. Yet up to now, no problems or holdups have appeared regarding the projects we're working on, nor those in the pipeline. Do I believe, practically speaking, further along, there might be additional supply chain holdups once construction kicks off on certain of these projects? I think certain upstream or downstream, depending on how you view it, supply chain components or the businesses are facing strain on capacity and such. You definitely might witness some of that. However, on the site side, they're eager to finish it as fast as they can. That's the sole area where they can save time and get ready. So no holdups have shown up there; and honestly, regarding the electrical side, our teams haven't encountered any — perhaps a week's holdup or a few days, but nothing meaningful has come to my attention that worries us.
Manish Somaiya
analystThanks, Joe, that's useful. Now turning to the E-Infrastructure margins — clearly, during Q2, we saw roughly 24.1%. I believe you touched on a few of the drivers behind that. Mix played a major role; still, how should we view normalized margins, at minimum for the current year and maybe looking ahead to '27? Also, could you perhaps give us some insight into what's driving the margin gains at CEC? I think you brought up 12 to 18 months. But if you could just walk us through the various categories of margin improvement. And last, regarding Stone Ridge, I believe margins there sit in the mid-teens. If you could lay out that same trajectory for us as well.
Joseph Cutillo
executiveSure. Let me go back in time a bit to when we acquired Plateau — their margins today are excellent, but back then they sat within that 15% to 18% band; it took us several years, and we've pushed those margins considerably higher. Looking at the Plateau operation, they're approaching peak margins. There will still be modest additional gains, but we won't witness the enormous improvements in that unit that we've seen as projects shifted to a greater extent. However, across the remaining parts of our E-Infrastructure, the Petillo operation has consistently been a lower-margin one. As they take on larger and larger projects — data centers, chip plants — those margins will rise. Margins on larger projects are stronger. Our Rocky Mountain Transportation operation, which we've repositioned and expanded 700% within E-Infrastructure. The E-Infrastructure margins there, even given their limited equipment suite, even considering what they're doing without being vertically integrated, for instance, remain much better than transportation. But it will take us some time to accomplish certain vertical integration. We lack sufficient critical mass in the market for vertical integration to be worthwhile, correct? So as we accumulate enough critical mass, as we expand their equipment suite — and the truly straightforward way to think about it is, if my bucket is 3x the size of an existing bucket, then for each scoop, I move 3x the dirt; it's genuinely that simple, right? So it takes me 1/3 the time to move that dirt. Thus we'll keep enhancing and expanding their equipment suites, and their margins have risen. At CEC, there are really 2 major factors at play. First, we're exiting certain legacy business segments carrying comparatively low margins, which will boost their margin, right? That's simply portfolio management. The second factor is that as they become increasingly involved with these data centers and those data centers grow larger, we're seeing their margins climb as project sizes increase. So it's a mix of elements. We'll keep watching those rise. The thing that's going to throw people off each quarter, since the math doesn't come out clean, is that the blend will shift; and if CEC's growth rate far outpaces that of E-Infrastructure, our margins will look like they're falling, even as theirs are rising along with site development margins — that's purely a matter of mix. We can't control that; yet when you consider what we're earning back on those dollars and the growth involved, I believe the vast majority would sign up for that every time.
Manish Somaiya
analystSo, Joe, real quick — could you just give us a sense of how the margins for the legacy E-Infrastructure business compare with those for CEC?
Joseph Cutillo
executiveNick, do you happen to have the precise figures for that?
Nicholas Grindstaff
executiveIn the second quarter on an adjusted basis were on the high 20s.
Joseph Cutillo
executiveRight. So what you're seeing is — on the site side, you're in the upper 20s, while on the CEC side it's about 12%, so that's quite a gap. That's more than double the margin profile, so even a modest mix shift or a little extra growth in CEC is enough to dilute the overall margin; and that's only for the quarter.
Sangita Jain
analystCould I ask something further regarding that margin item? I simply want clarity on what you're guiding toward going forward, and whether that reflects CEC expanding much more quickly than you'd expected — say, just a few months back, at the point you handed us this guidance?
Joseph Cutillo
executiveSure. Here's the simplest way to look at margins: take E-Infrastructure and split it into site development plus electrical — let's keep it at that level. During the quarter, margins came in better in both site and electrical. However, because electrical revenue is climbing at a far quicker pace, that pulls the combined margin lower. Looking at the remainder of the year, CEC's faster growth rate dilutes the margin — got it? So honestly, this comes down to nothing but mix; no margin is being lost within our businesses. I need everyone to be clear on that point. It's strictly a revenue mix issue causing this; and then there's the second factor on the site side, where we observed the rise — the pace of margin expansion easing — because, 1, with new projects, the early stages of those projects carry lower margins. But 2, we also have that 700% growth in the Rocky Mountains transportation business, and it has a smaller equipment suite that isn't vertically integrated, expanding more rapidly than our Southeast business. When that occurs, its margins sit lower. I'll be upfront about that. Those margins are getting better, yet they remain below what we see in the Southeast; so that combination creates the impression the total margin has fallen, even though every individual component is trending favorably.
Noelle Dilts
executiveCompared to what we had anticipated before, absolutely, CEC has grown more, and the rollout on a few of those more recent projects has moved along quicker.
Adam Thalhimer
analystThat was a strong quarter. Joe, the E-Infrastructure orders hit a record level, and it was hard for me to believe they even rose sequentially. Could you share additional detail on what was included, and perhaps how much Stone Ridge contributed?
Joseph Cutillo
executiveYes; what makes it even more impressive is that we managed to do that during a really strong revenue quarter, which is always difficult. Nick, would you like to walk through some of the backlog figures? Stone Ridge certainly contributed some of that. CEC had a great quarter with their bookings on that. I don't know, Nick, whether you have the detailed numbers there.
Nicholas Grindstaff
executiveRight. So for the June quarter, CEC's total backlog came to roughly $2.4 billion. At that point, Stone Ridge stood at approximately $140 million in committed backlog that had been signed, and I believe the signed backlog figure is $140 million.
Joseph Cutillo
executiveRight. Although the largest factor for the quarter — CEC came through with some excellent bookings. And Adam, what those consist of is the subsequent phases and additional building sets belonging to projects they're already working on. So from our standpoint, everyone prefers focusing on the bare headline figure alone, yet what truly gives us encouragement is that they keep securing those following stages and landing that higher tier of projects, which serves as clear evidence they're performing well; they're coming through for the customer. They're doing everything required. And within the portfolio, we observe the identical pattern with them that we've seen with Plateau, RLW, or Petillo.
Adam Thalhimer
analystUnderstood. All right; moving on, Joe, that remark you made regarding possibly weaker awards in Q3. I believe you mentioned the stock price being lower. That's likely the main factor. Could you elaborate on what you were getting at, and perhaps share more detail about the bidding activity you're observing?
Joseph Cutillo
executiveIt simply comes down to timing. I really wish our customers would submit bids in equal volumes each quarter throughout the year, which would make things far simpler for us. But the truth is they don't do that; one quarter they might bid 3 or 4 new projects, and we appear to be performing brilliantly and gaining share. The following quarter, they bid one or none at all; it all depends on when their cycle lands. What matters most to us — and I understand that if you're not closely involved, folks are searching for signals — is that we're constantly engaged in discussions with them. We have visibility into what's ahead. So long as we have that visibility, we're confident. When it actually materializes, that's less worrisome for us, correct, whether it lands in the third quarter or the fourth quarter. However, we're seeing genuinely robust activity that will occur in the fourth quarter and the first quarter of next year. And there's merely a slight slowdown during the third quarter. So we're attempting to alert everyone that we anticipate this. We're aware it's on the way. Don't be alarmed; it's not an issue. But rather than informing people afterward, once we already know it's — that's simply what will likely occur. Could something shift into the third quarter and make us look foolish by arriving early, perhaps, but I wouldn't count on that.
Julio Romero
analystPerhaps to kick things off, you just increased the size of the revolver to $1.5 billion. You have a net cash position. What's the right way for us to look at this? Should we interpret that bigger facility as a sign that the size of M&A acquisition candidates is going up? Is it just optionality? Just give us some help thinking it through here.
Joseph Cutillo
executiveYes. Nick, would you like to take that one?
Nicholas Grindstaff
executiveYes, absolutely. What we did was increase the size of that facility, mainly so we'd be in position to seize acquisition opportunities and keep that dry powder on hand to act on them. On top of that, we retired the term loan we already had and shifted into a structure that's entirely revolver-based, which let us improve our pricing. We also brought in a few important relationship banks. So all things considered, I'm quite pleased with our revolver and the way it sets us up as we move ahead.
Joseph Cutillo
executiveWhen it comes to uses, there's no doubt about it — we have always been an acquisitive company. The deals we've done have worked out quite well. If we could take every acquisition, like CEC, and double it within a year, then I think we'd recoup the purchase price in a year. I'm not sure that's the case. So we've performed very well. To add capacity, we're going to need to bring in more acquisitions. Given what we're seeing — and here's the piece everyone overlooks, so put the newspapers down and stop reading all the craziness out there — based purely on what our top hyperscalers are showing us, the volume of work headed our way means we have to add capacity much more quickly just to stay even with them. And that doesn't even count all the other players coming into the market and building things. What's coming down the tracks is unbelievable. So more acquisitions are going to be necessary — not just for strategic geographic reasons, but purely to add capacity, so we can keep pace with the demand that's on its way.
Julio Romero
analystGreat. Tying into what I wanted to ask next — CEC is performing much better than the revenue targets you gave when the deal was announced. As we've discussed today, it's clearly taking up a larger share of the infrastructure mix. So I'm wondering how that, along with what you said about needing additional capacity, fits into your M&A priorities. How would you rank them right now — geography, electrical versus specialty mechanical, more site development? Just walk us through how you're thinking about those priorities.
Joseph Cutillo
executiveSure. It's a bit of everything, honestly. But if you'd asked me back in Q3 of last year, right after we bought CEC, whether we'd be hunting for additional electrical capacity in Texas, my answer would have been no — I'd have told you we'd likely concentrate on the Southeast instead. As things stand now, if the right deals presented themselves, I'd bring 2 or 3 additional CECs into the Texas market. That's the scale we think that market will reach. We'd definitely want to build out electrical capabilities in the Southeast too; that's clearly a big market for us, and the value proposition holds up the same way. So we keep searching hard for the right acquisition there. Then on the site development front — particularly as things shift further and further away from the west to the east and the east to the west, toward Texas and nearby markets — over the next 3 years, Texas will outpace every other market when it comes to data centers and everything tied to them. It's on its way; sure, something could always derail it, but nothing like that is on my radar at the moment. That's why we're pushing really, really hard on figuring out what's required to bring on that extra capacity now, so we can get out in front of the curve — the same way we did with Stone Ridge — because we're confident that in '20 — late '27, '28, certain upper Pacific Northwest regions will begin to take off too. I know I repeat myself, but our visibility into multiyear projects in the pipeline is excellent, and we keep putting ourselves in position to capture them. It makes us look really clever when they materialize, but really it's just our customers letting us know their plans.
Joseph Cutillo
executiveAlright, once more I’d like to express my appreciation to all of you for being on today’s call. Should anything else come to mind afterward, don’t hesitate to reach out to Noelle Dilts. You’ll find how to get in touch with us included in the press release. Thank you, everyone, and enjoy the rest of your day.
Operator
operatorAppreciate it. Everyone, this conference call is now finished. Thanks to each of you for participating. You can go ahead and hang up at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Sterling Infrastructure, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Sterling Infrastructure, Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Sterling Infrastructure, Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.