Sterling Infrastructure, Inc. (STRL) Earnings Call Transcript & Summary
May 6, 2025
Earnings Call Speaker Segments
Noelle Dilts
executiveHello, everyone, and thanks for joining us this morning for Sterling Infrastructure's conference call and webcast covering our first quarter 2025 earnings. It's a pleasure to be with you as we go over the results alongside Joe Cutillo, our Chief Executive Officer, and Ron Ballschmiede, our Chief Financial Officer. Joe is going to kick things off by walking through the company and how we performed during the quarter. After that, Ron will cover the financial results and guidance, and then Joe will come back to share the market picture and our outlook for the full year. Following that, we'll take your questions. Just a reminder that slides are available in the Investor Relations area of our website, and those slides contain the details of our full year 2025 financial guidance. Before I hand things to Joe, let me read the Safe Harbor Statement. Today's discussion might contain forward-looking statements. Actual results may differ materially from what is said today. For a fuller description of the risk factors that could impact these projections and assumptions, please look at Sterling's most recent 10-K and 10-Q filings. The company undertakes no obligation to update forward-looking statements because of new information, future events or otherwise. Be aware that during this call, members of management may mention EBITDA, adjusted EBITDA, adjusted net income, or adjusted earnings per share. Each of these represents a financial metric that U.S. GAAP does not recognize. In accordance with SEC rules and regulations, reconciliations of these non-GAAP financial measures to the closest comparable GAAP financial measures appear in the earnings release we put out yesterday afternoon. In talking about today's results, we will cite pro forma figures, which restate prior period results so they align with how our RHB JV is accounted for at present. Before we begin, I want to note that at the close of 2024, the accounting method for this joint venture changed, meaning we stopped consolidating its revenue and backlog — though our portion of the JV's EBITDA that we recognize remains unaffected. We might also mention Adjusted Operating Income, EBITDA, and EPS numbers that exclude specific non-cash and non-recurring items. A description and reconciliation of those adjustments can be found in our press release. Unless stated otherwise, all comparisons are made against the same quarter last year. At this point, I'll hand things over to Joe Cutillo, our CEO.
Joseph Cutillo
executiveAppreciate that, Noelle. Morning, everybody, and thanks for being on the call today. Sterling has kicked off the year strongly. During Q1, our adjusted earnings per share climbed 29%, landing at $1.63, while adjusted EBITDA came in at $80 million, which represents a 31% gain. On a pro forma basis, revenue for the quarter rose 7%, driven by an increase of more than 18% in our E-Infrastructure Solutions segment along with 9% in our Transportation Solutions. Our gross profit margins widened by over 400 basis points versus the prior year, hitting 22%. We stay committed to chasing the opportunities offering the best returns and the most appeal. On top of that, operating cash flow generation during the quarter came in strong at $85 million. We're happy to share that in the quarter we completed our purchase of Drake Concrete, which supplies residential concrete slabs across the Dallas Fort Worth region, for $25 million. This deal bolsters our geographic reach in DFW and deepens our customer base, since Drake's customer overlap with Tealstone is minimal. We expect Drake to add $55 million in revenue and $6.5 million in EBITDA during 2025. As we look ahead, we stay very optimistic about our outlook. Although we're definitely mindful of the elevated uncertainty around trade policies and the economy, we think the markets and geographies we operate in offer robust, sustainable growth. On top of that, our exposure to materials sourced from abroad is limited. We'll keep building on the solid foundation we've put in place, push margins higher, and chase opportunities that boost our long-term value. We'll remain focused on what's within our control and adjust and respond to shifting conditions when needed. Our backlog position and visibility underpin our confidence going forward. Backlog finished the quarter at $2.1 billion, up 17% year over year on a pro forma basis, and our book-to-burn ratio exceeded two times. E-Infrastructure Solutions backlog reached $1.2 billion, rising 27% in the first quarter. There's no indication our customers are pulling back. Continued expansion in our pipeline of future phase opportunities linked to current projects gives us even more multiyear visibility. Late last year we increased our expectations for future phase work, and by the close of the first quarter we lifted that figure from $0.5 billion dollars to $0.75 billion dollars, and we reached the top end of that target. Combining our signed backlog with future phase work gives us sightlines into a pool of E-Infrastructure work nearing $2 billion, which is unheard of for us; we couldn't be more thrilled about what's ahead and believe we'll keep delivering robust earnings growth across the coming few years. The Sterling Way — our pledge to look after our people, our environment, our investors and our communities as we work to build America's infrastructure — stays our guiding principle as we carry out our strategy. Turning now to a closer look at how each of our segments performed. Within E-Infrastructure, revenue for the first quarter was up 18% versus the same period a year ago. Once again, the data center market served as the main engine of growth during the quarter, rising roughly 60% compared with the prior-year period. Adjusted segment operating income climbed 61%, while adjusted operating margins came in at 23%, which marks a 618 basis point improvement. The forces behind this were our move toward large mission critical projects, data centers among them, where the project management edge we hold and our capacity to complete jobs on or ahead of schedule deliver tremendous value to our customers. Mission critical work still accounts for the vast majority of our E-Infrastructure backlog, and that includes data center work at more than 65%. Turning to Transportation Solutions, first quarter revenue rose 9% on a pro forma basis and adjusted operating profit was up 60%, fueled by robust market demand along with the gains from a mix shift toward higher margin services. We closed the quarter with Transportation Solutions backlog totaling $861 million, which represents an 11% year-over-year increase on a pro forma basis. Shifting to Building Solutions, segment revenue for the first quarter fell 14% and adjusted operating income fell 18%. Demand for homes overall has taken a hit as would-be buyers wrestle with affordability challenges. Revenue from our legacy residential business dropped 19%, pulled down by weakness across the housing market, unusually severe weather and a difficult comparison against the first quarter of 2024. With that, I'd like to hand things over to Ron, who will walk you through more of our financial metrics and full year guidance. Ron?
Ronald Ballschmiede
executiveThanks Joe, and good morning. I'm happy to talk about our really strong, record-breaking performance in the first quarter. Let's begin with a few financial highlights, starting with our consolidated backlog metrics. Backlog for the first quarter came to $2.128 billion, which is up 26% compared to the end of 2024. Our backlog's gross margin stood at 17.7%, which is 100 basis points higher than the 16.7% level at the end of 2024. This gain came from increases in both the size of E-Infrastructure backlog and its margin; we finished the quarter with combined backlog of $2.23 billion, up 21% from the end of 2024. Book-to-burn ratios for the first quarter of 2025 were 2.23 times for backlog and 2.13 times for combined backlog. Now turning to our first quarter income statement, revenue came in at $430.9 million, which is a 7% increase excluding RHB over the prior year period. As has been our seasonal pattern in the past, the first quarter should be our lowest revenue quarter of the year. Consolidated gross profit for the current quarter was $94.8 million, or 22% of revenues, which is a 400 basis point improvement over the first quarter of 2024. G&A expense rose by $7.3 million during the quarter. Roughly $1.6 million of that rise was tied to one-time separation expenses. Other factors behind the increase include performance based compensation, along with investments in personnel and systems that support our growth. We expect G&A expense for the full year to come in at roughly 6.3% of revenues, compared with 6.1% for 2024 excluding RHB. Our effective income tax rate in the first quarter was 26.1%; for the full year, we expect an effective income tax rate of approximately 26%. Taking all of these together, we delivered a record first quarter with adjusted net income of $50.2 million, or $1.63 per diluted share, which is a 29% improvement over the first quarter of 2024. On a GAAP basis, diluted earnings per share came to $1.28, compared with $1 even in the first quarter of 2024. Moving to our cash flow metrics, cash flow from operating activities in the first quarter of 2025 was a strong $84.9 million, versus $49.6 million in the first quarter of 2024. Cash flow used in investing activities for 2025 included $16.4 million of net CapEx and $37.9 million for acquisitions, including Drake Concrete. Cash flow from financing activities was an outflow of $56.2 million, mostly from share repurchases of $43.8 million at an average price of $128.98 per share. The remaining availability under the existing repurchase authorization is $85.6 million; we closed the quarter in a very strong liquidity position, with $638.6 million of cash and $310 million of debt, for a cash net of debt balance of $328.6 million. Additionally, our $75 million revolving credit facility went unused during the period; now I'd like to go over our guidance as we look toward 2025. The continued strength of our business puts us in position for another record year at Sterling. Our full year 2025 guidance ranges are as follows. When it comes to revenue, we're looking at $2.05 billion to $2.15 billion, net income between $222 million and $239 million, diluted EPS of $7.15 to $7.65, adjusted diluted EPS of $8.40 to $8.90, EBITDA from $381 million to $403 million, and last, adjusted EBITDA of $410 million to $432 million. Given how varied and robust our business portfolio is, along with our solid liquidity and comfortable EBITDA leverage, we're in a good spot to seize further chances to create meaningful shareholder value in 2025 and past that. At this point, I'll hand the call back over to Joe.
Joseph Cutillo
executiveAppreciate that, Ron. When we think about what's ahead, our confidence in the multiyear potential across every market we serve stays very high. That confidence comes from a robust backlog, upcoming phase opportunities, and the conversations we're having with customers. Within E-Infrastructure Solutions, we expect the present momentum in data center demand to persist well into the future. Multi-year capital spending plans are being talked through by our customers, and their focus is on securing the right partners to help execute those plans. Turning to manufacturing, our view is that 2025 will bring a reasonably consistent flow of mid-to-large onshoring projects. Looking further out to 2026 and 2027, a substantial pipeline of megaprojects sits on the horizon. Planned semiconductor facilities would be part of that. Because developing these is so complex, we think some time will pass before awards begin coming through. The e-commerce market has picked up in 2025, and we expect further awards to come in over the course of the year. Small warehouse and commercial, a segment that started weakening back in 2023, is now displaying encouraging signs. Taken together, these trends underpin robust multiyear growth prospects. For 2025, our expectation is to post solid E-Infrastructure revenue growth in the mid-to-high teens, along with adjusted operating profit margins in the mid 20% range. Over in Transportation Solutions, we've reached the back half of the federal funding cycle. More than two years of backlog has been built, and bid activity levels remain healthy. During 2025, we look for ongoing growth in our core Rocky Mountain and Arizona markets. The reduction of our low bid heavy highway operation in Texas is unfolding as planned, and that's bringing about some moderation in Transportation Solutions top line and backlog for 2025, which ought to produce meaningful margin gains as we progress through the remaining months of the year. Our updated outlook for Transportation Solutions is revenue growth in the mid-single digits on a pro forma basis in 2025. On an adjusted basis, we expect operating profit growth in the mid-teens. Moving to Building Solutions, our belief that this business is well positioned for multi-year growth hasn't changed. Continued population gains are anticipated across our key geographies of Dallas, Fort Worth, Houston and Phoenix, fueling demand for new homes. On top of that, a meaningful chance to capture share exists in Houston and Phoenix. With the Drake acquisition, we're positioned favorably for the point when the market starts to recover. For 2025, our expectation for Building Solutions remains slight overall revenue growth, powered by acquisition contributions. An organic decline is what we're forecasting in the legacy residential business. Beyond that, we expect our commercial work to keep declining at the rates mentioned previously. Growing the company and improving our service offerings means working hard to identify the right acquisition. M&A efforts remain centered on the E-Infrastructure market as our number one priority. On top of that, we're spotting some intriguing opportunities within Building Solutions. Patience and discipline will continue to guide our inorganic growth strategy. If we hit the middle of our 2025 outlook, that would mean revenue growth of 12% when adjusted for RHP, adjusted EPS growth of 22%, and adjusted EBITDA growth of 23%. So with that said, I'd like to open things up for questions.
Brent Thielman
analystHi there, thanks. Morning to you. What a strong quarter.
Joseph Cutillo
executiveAppreciate it, Brent.
Brent Thielman
analystJoe, regarding the E-Infrastructure business group, could you discuss the portion of backlog — 35% — that isn't data center? It sounds like visibility in manufacturing remains fairly strong and keeps going, and perhaps warehouse activity is beginning to accelerate and add more from your side; but how solid do you believe that backlog is, and can you keep expanding that part of the business?
Joseph Cutillo
executiveYes, we feel good about it. That really breaks into three pieces; manufacturing, for us, will remain fairly stable throughout the year. We've watched e-commerce return and accelerate actually even quicker and somewhat beyond what we expected, so that's exciting for us; and we're beginning to observe additional activity in what we refer to as small industrial and warehousing. That trend, we believe, will persist across the latter half of the year. So we feel quite positive regarding that 35% and I believe there remain some possible upside opportunities on projects that appear set to bid in the second half of the year across essentially every piece of E-Infrastructure.
Brent Thielman
analystOkay, that's great. So Joe, if you look at tariffs broadly, where would you say we're most vulnerable and where are we least vulnerable when it comes to direct costs, and what has been factored into the guidance on that front?
Joseph Cutillo
executiveYeah, I'd say the fortunate thing is that if we hadn't been through COVID and witnessed what I'd describe as those rapid-fire escalations from a couple of years back, I'd likely feel somewhat more hesitant and worried about tariffs. But you have to keep in mind that we experienced price hikes of 200% to 300% within under six months, and ultimately the effect on our business turned out to be negligible. So regarding tariffs, let me walk through each segment so everyone has a clear picture. Starting with Transportation, the primary items are steel, and on our contracts, those components mostly need to be produced domestically, and we secure those at the start of the contract; as a result, our initial pricing might look higher than what the market offers, but it's locked in. Beyond that, for certain other items, if we encounter increases beyond a specific percentage, there's actually some indexation that kicks in. And all through COVID, we basically saw no effect in Transportation Solutions. So we expect minimal impact there. Clearly, in both Building Solutions, there's exposure to concrete powder and concrete prices rising, but once again, indexation provides some offset and protection; in E-Infrastructure, we truly have a few key components. All the piping and underground parts that are used in the contracts or in the builds in fuel. Those represent the two largest items. We've taken lessons from COVID, and in our major contracts we've built indexation into our fuel pricing. If it goes beyond, I think it's 5%. We pass that along. But in the same way, if it drops by more than a set amount, we return money to the customer. So making money on fuel isn't our goal. We simply aim to avoid losing money on fuel. As for the underground items, the greater problem during COVID was availability. That ended up costing us far more than the price hikes did, since our projects are phased. That's the part we really like about them. We only set pricing for a single phase at a time. So typically we're purchasing the material for that phase as we're setting the price, which lets us incorporate it. So I wouldn't claim there's no exposure at all, but the worst case would be roughly two to three months of exposure on a project if we got locked into something and hadn't pre-bought the material. I can tell you our teams are probably pre-buying material more than they used to just to make sure that doesn't occur; and then in Building Solutions, concrete is our largest material. When I looked two weeks ago—I skipped checking last week—concrete pricing was continuing to decline for us in every category. So what we're seeing there is the reverse. That's probably our largest exposure. Then again, these are projects with very fast turnaround that we bid as new increases get announced; during COVID, there was roughly a 60-day to 90-day delay since things moved so rapidly. When a price hike notice gives us 60 days to 90 days, we can typically push it through to the customer within that window.
Brent Thielman
analystGreat. I'll hand it over. Appreciate it.
Julio Romero
analystThank you. Hello, good morning to Joe, Ron, and Noelle.
Joseph Cutillo
executiveMorning.
Ronald Ballschmiede
executiveHello, and good morning.
Julio Romero
analystIndeed, good morning to you as well. The margin results delivered by Transportation Solutions during this quarter were truly impressive. Could you perhaps elaborate somewhat on what drove those margins? What portion of this margin strength stems from moving away from low bid, as opposed to the various other factors at play, and what pattern should transportation margins follow over the rest of the year?
Joseph Cutillo
executiveSure. I'd characterize it as us seeing only a tiny contribution from the low bid shift at this point. We're still wrapping up projects and that kind of thing. Nearly all of that margin gain comes from — well, it's that we keep tilting our mix toward end products with better margins. That could mean alternative delivery within the highway segment, a growing share of aviation, and the rail mix. All of those carry significantly better margins. So we keep directing our efforts toward shifting that blend further in favor of that portfolio. And as that happens, margin gains will keep coming. We ought to begin noticing a bigger effect from low bid as we approach the close of this year and move into the beginning of next year.
Julio Romero
analystThat's really useful. The way you walked through the portfolio and described tariff exposure across each of the three segments gave us great insight. Could you share how comfortable you feel about pursuing new projects and taking on additional work, plus how execution looks in this wider operating climate?
Joseph Cutillo
executiveSure. I'd say that a portion of the margins we posted this quarter in transportation and infrastructure comes down to the fact that our teams keep performing at a very high level, and everything we're doing to keep improving — be it technology or otherwise — to boost project performance keeps delivering returns. I'm also enthusiastic about several efforts underway that should begin delivering returns in the next year and the one after that too. So on the performance front, everything looks strong. Turning to bid activity, we've still got slightly more than 12 months remaining on IIJA. That spending keeps climbing; they passed the 2025 budget. It went up. I can't recall the figure. Noelle, was that 8% higher? That's my recollection for total spend, roughly. So bid activity is still healthy in Transportation, in E-Infrastructure — honestly, our front end people would prefer it to ease up. Those four individuals are putting in seven days a week, 12 hours a day at the moment handling the bid activity flowing in; so we feel very positive about what's happening there. Looking at our backlog in E-Infrastructure, we're genuinely focused on how to complete the filling of 2026 and fill 2027; it isn't that we're unable to take on more in 2025. We'll take on more, but we're increasingly concentrating much further ahead to ensure we're solid over the long term. The weak spot for us, the headwinds we're encountering, is definitely on the residential side. That market has stayed soft, perhaps even a touch softer than what we'd expected during the quarter. Yet what's different there is the enormous pent up demand. Eventually someone will crack this affordability issue somehow, whether through interest rates declining or some pricing declines on the builder side to draw people in. So over the long run we're bullish on that market across a multi-year stretch — we might endure a somewhat sluggish period. We view it as a chance to strengthen our capabilities and possibly grow during this stretch, and we'll emerge from it even stronger afterward.
Julio Romero
analystThat's really clear. Thanks for the detail. I'll hand it off.
Joseph Cutillo
executiveThanks.
Adam Thalhimer
analystHey, good morning guys. Nice quarter.
Joseph Cutillo
executiveThank you.
Adam Thalhimer
analystRon, I'd like to ask a follow-up. You said E-Infrastructure was your number one M&A priority. Is that about moving into new regions?
Ronald Ballschmiede
executiveWell, we consider it from several angles. To begin with, there are a few markets we're eager to enter, and we're putting in serious effort to either locate a possible acquisition or develop an organic plan to grow there. Honestly, Texas is one of them. We're based in Texas, and the level of activity happening there — data centers, chip plants, you name it — is enormous, and by and large, we've passed on it. I'll get into how we're actually capturing some of that through organic means with certain jobs. So pursuing site development through geographic extensions, and evaluating acquisitions for that purpose, I should say, is definitely on our radar. Beyond that, we see a lot of value and a lot of opportunity in adding electrical, mechanical, and possibly specialty piping, plus a few other capabilities, into our portfolio. We've tried out a small dry utility operation. Within the next 12 months, we'll triple it — or possibly quadruple it — simply by taking it to the clients and contracts we already have and getting it included in those contracts. So we believe there's a chance, if we can deliver a full electrical and mechanical package, to bring those solutions to our existing core customers too. That isn't the kind of thing that happens overnight, but on the next set of projects we take on, we'd clearly push hard to get those incorporated. So the answer is we're pursuing both — geographic expansion and added services.
Adam Thalhimer
analystFollowing on from that, when it comes to those extra services, might you begin providing them separately, or would they be available solely as an addition to the infrastructure projects you already have?
Joseph Cutillo
executiveNo. What we're seeing is that we definitely have the ability to apply them across our existing customers. We'd also deploy them beyond that customer group. And our view is that this could be an opportunity — should the appropriate acquisition arise, bringing with it the appropriate blend of end customers, it might eventually draw us into other end markets within site solutions.
Adam Thalhimer
analystAll right, and one final thing from me, since it sort of threw me off — you reported a 22% gross margin in Q1. And that's what you're guiding to for the full year as well. I just wondered why there wouldn't be a seasonal increase in gross margins over the summer and fall.
Joseph Cutillo
executiveYes, we do get an increase in summer and fall, and then we get the drop in the fourth quarter. So it ends up coming out fairly near to that. For a stretch it runs a bit above.
Adam Thalhimer
analystGot it. I'll hand things off now. Appreciate it.
Noah Levitz
analystJoe, Ron, and Noel, morning to you, and nice work on those solid results.
Joseph Cutillo
executiveThanks.
Noah Levitz
analystLet's get started. Right. So with the IIJA bill, you've got a pair of years remaining in backlog. It's likely wrapping up within the coming year. A few other peers have brought up IIJA Part 2, that upcoming bill. Could you share a bit about whether you're hearing anything within Congress, and what you'd want to see or anticipate in that next bill?
Joseph Cutillo
executiveYeah. So I believe folks get concerned that once the bill finishes, all activity halts. It's simply that the following bill arrives. Correct; and in the worst situation, should a gap occur, typically they implement a transition year or a bridge. Usually, they've taken the previous year's figure, adjusted it for inflation, and kept things going until the subsequent bill proceeds. But here's what I'll share with you — I was meant to be in D.C. this week, yet due to the earnings call and board meeting, that isn't happening. There's greater activity happening well ahead of time regarding the upcoming infrastructure bill right now, bipartisan activity in D.C., than I've witnessed across the last two bills by a significant margin; so I'd say the Head of Transportation was instructed to craft a bigger, more beautiful infrastructure bill than anything ever accomplished previously. And plenty of individuals in D.C. are scurrying about attempting to work that out right now, including for the first time discussing some longer term methods to fund this through fees, federal fees on registrations of electric vehicles, hybrid vehicles and even gas vehicles at varying rates; so far so good. Once more, they're far further ahead. They appear to be far more rational in how they think things through. And I believe they've received an edict to accomplish something bigger and better; so I, it's still a year off, probably closer to a year and a half. But I'd say it looks better than it has historically. Typically at this stage, everyone is attempting to get Congress to consider it since it's approaching, and they respond that we still have over a year. Why would we consider it now? So all of that appears positive.
Noah Levitz
analystOkay, that's clear. Turning next to e-infrastructure — during your prepared comments, you brought up the semiconductor chance along with onshoring. Over the last several months especially, I believe there have been many capital investment announcements, quite large ones, from drugmakers relocating production back into the United States and growing what they already can do. And in the prior quarter, you noted an active project in that biopharma area. So I wanted to ask whether you could share some detail on the discussions tied to those specific builds — the biopharma ones — how big those projects might be, and whether capacity limits might hold you back on them, simply given how much you're exposed to data centers and how strongly that has been scaling? Thank you.
Joseph Cutillo
executiveSure, I'll take the last part first; we'll handle every opportunity that arrives that we judge to be a solid project. So for us, the wonderful part is that the business is expanding nicely, and margins keep widening. I'd say that if the proper projects showed up and we needed to increase our capacity by 25% to 30% at this moment, we would be able to do so.
Poison
analystWhat we're seeing is pretty scattered — a single instance here, another one there, and no two are alike. Everyone's anticipating that moment when 20 pharmaceutical facilities suddenly move forward and we watch them prepare to start construction. Our sense is that it's on the way, though we're still in the early stages; this takes time, and I believe folks underestimate how much. Consider the timeline from deciding you'd like to put up a plant in the U.S. to actually getting shovels in the ground — acquiring the site, securing approvals, completing all the prep work. Honestly, if the administration were looking to accelerate manufacturing, or onshoring, or reshoring more rapidly than any other measure, the answer would be eliminating the political dimension along with permitting. Obtaining permits is now dragging on far longer than it ever did previously.
Onesie Twosies
analystWe're in conversations with the major engineering companies handling the early-stage work on these projects. Food is a second area. Food alongside pharma — we continue to hear about all the design work underway; we're simply waiting for that surge to reach the shore.
Noah Levitz
analystExcellent. Many thanks.
Joseph Cutillo
executiveThank you, Joanna. Once more, I want to express appreciation to everyone for being on today's call. Should you have any additional questions or want to arrange a conversation with us, don't hesitate to reach out to Noelle. You'll find her contact details in our press release. Again, my thanks to all of you, and I hope your day is a great one.
Operator
operatorEveryone, that brings today's conference call to a close; we appreciate you joining us, and we request that you now hang up your lines.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Sterling Infrastructure, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Sterling Infrastructure, Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Sterling Infrastructure, Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.