executiveGood morning, everyone, and many thanks for being with us today for the 2024 Financial Results Presentation for the ACS Group. Joining me are Ángel García Altozano, our Corporate General Manager, and Mr. Emilio Grande, the CFO for the Group. As always, after the presentation there will be time for a Q&A session so we can clarify any points you wish to raise. And if you're watching via streaming on the website, you can also submit your questions through the usual channel. Let me begin with the first slide on the screen this morning. In 2024, ACS had what we consider an excellent year in terms of the operational evolution of our businesses and cash generation. It was very satisfactory with respect to the relevant corporate transactions for the Group's strategy. Ordinary net profit came to €684 million. That's an increase of 14%, comfortably outstripping the target, which was envisaged at between 8% and 12%. Now these are the ordinary figures. They do not include non-recurring items, which are essentially the capital gain for the sale of 57% of the SH-288 in 2023 and the impact of the book capital gain in CIMIC and the termination of the SH-288.
Javier Crespo
executiveBoth figures are net of provisions and non-recurring items for 2024. Net profit came to €828 million, with earnings per share of €3.23. On a like-for-like basis, that amounts to a 7.8% rise, while profit before tax grew 23.6%. Turner drove that, since Turner's top profit grew 37%. This year we posted exceptional net operating cash flow generation of €2.1 billion — €1.1 billion above 2023 — thanks to excellent operations and strong growth in our bit, along with solid cash conversion. As a result, our net debt at the close of financial year 2024 stood at just over €700 million. That holds even after the accounting impact from consolidating Thiess's €1 billion of debt and after rewarding shareholders with a payout of €862 million; we also made strategic investment, with net investment totaling €1.15 billion. Our order backlog hit a record €88.2 billion, up €14.7 billion, or 20%. That equals almost 25 months of sales, helped by projects awarded to us worth €51.5 billion during the financial year. So today our leadership in high growth markets shows up increasingly in a Nordic bloc concentrated on those sectors — 50% of awards come from those sectors.
Javier Crespo
executiveOur presence, this footprint, plus the engineering expertise we hold in that sector, is opening up these significant capital investment opportunities for us. Therefore, for all of those reasons, we feel optimistic regarding the Group's future, and we will raise our target for ordinary net profit growth in 2025 to a range between 8% and 15%. Now let's review the consolidated results for the Group. Sales rose sharply, by 16.5%, reaching a total of €41.6 billion, propelled by robust production in strategic markets — notably digital infrastructure, biopharma and health, which climbed 21% year on year. EBITDA came to €2.45 billion, an increase of 28.7%, affected by the full consolidation of these since the second half — the second quarter, rather, of the year — and by the termination of the SH-288. EBITDA — ordinary EBITDA on a like-for-like basis — totaled €2.642 billion. Ordinary comparable profit before tax, adjusted for non-recurring impacts, likewise delivered solid growth of 23.6%, to above €1.2 billion, along with a 31 basis point improvement in margin, to 2.9%. Net attributable profit stood at €828 million, helped by the solid operating performance, while earnings per share for the period were €3.23, up 7.8%. So, adjusting the figures for the extraordinary impacts in both periods, our ordinary net profit grew by 14%, which is higher than that target range for growth of 8% to 12%.
Javier Crespo
executiveWhen it comes to sales worth over €41.6 billion, North America is where most of them sit — that region made up 61% of the total, with Asia-Pacific next at 24% and Europe at 14%. Moving to the next slide, you'll see our ordinary net profit, meaning the attributable profit broken out by segment. Every one of those figures reflects positive movement: Turner came in at €327 million, a year-on-year growth rate of 45.8%. That segment, in fact, posted the strongest growth across the Group. Turner now accounts for 48% of the Group's results. Engineering & Construction brought in €156 million, which is up 6.6%. Abertis delivered excellent operational performance last year, with revenue up 9.8% and EBITDA up 10.3%. Its contribution to attributable net profit rose by 3.6%, even after the impact of the fiscal regulation on concessions in France. Cash generation in 2024 was excellent. Net operating cash flow reached €2.1 billion — almost €1.1 billion above 2023. With that result, we have more than comfortably beaten the annual average range we told you about at the Capital Markets Day in April 2024 as the target for the years 2024 to 2026, which was approximately €1.2 billion. This figure stems from our robust operational performance and cash conversion across all of our businesses.
Javier Crespo
executiveMoving to Slide 6, our financial position is laid out here. At the end of fiscal year 2024, the Group had net debt of just under €700 million, an improvement of roughly €1.7 billion versus September; against the close of 2023, net debt is up by €1.1 billion, and that holds even after factoring in the book effect from consolidating Thiess's net debt and the €862 million returned to shareholders. Net strategic investment came to €1.14 billion, covering the capital contribution to Abertis, the purchase of 10% of Thiess, the additional stake acquired in HOCHTIEF, and other complementary strategic acquisitions and capital investment. All told, this gives us a solid financial position from which to pursue the investment opportunities that may arise for the Group. Turning to Slide 7, our order backlog comes to €88.2 billion in total; new generation infrastructure, up 19.9% strategically, remains a core part of our growth strategy and accounted for roughly 50% of all new contract awards in 2024. The book-to-bill ratio, an advanced indicator of that growth, is at 1.2x, and backlog visibility still extends beyond two years.
Javier Crespo
executiveMoving to the following slide, you'll see a handful of major contracts we've recently won. I'd like to draw your attention to the energy sector, where we were picked to design and build phase two of the 270 megawatt battery storage system known as the Western Downs project in Queensland on behalf of NEOM, which ranks among the world's leading producers of solar renewable energy data centers. Turner, meanwhile, has been chosen as the main contractor for Meta's data center campus in Louisiana, and that will be the largest one the company has to date. This project, now, involves multiple data center buildings built with artificial intelligence in mind, with a combined capacity exceeding 2 gigawatts. Worth stressing to you is that this project has not yet been factored into our backlog figures or into the contract awards figures for the period. Moving on to semiconductors. We've secured a number of contracts, among them the expansion of an assembly and testing facility for chip lithography machines in the United States, plus the installation of a construction — for semiconductors — in Germany, using clean tank technology. More details I can't share with you right now, since it remains confidential.
Javier Crespo
executiveWhen it comes to biopharma as well as health and social infrastructure, we were chosen to handle the expansion at North District Hospital in Hong Kong, and also the modernization and expansion of West Terminal 3 at San Francisco's airport. Moving on to sustainable mobility and climate resilient infrastructure: we've been awarded a portion of the water canal project at Hoboken Terminal, New Jersey. On the traditional infrastructure side, even though this particular project likewise isn't part of those backlog figures, I believe it still deserves a mention. That's the SR 400 Express Lane in Atlanta, Georgia, carrying a construction value exceeding $4.6 billion. Finally, let me highlight one more project, the Stobie mine in Canada, which concerns critical minerals like nickel and copper, responding to rising worldwide demand for these as essential resources. Let's move to the next slide. This shows the evolution by segments for Turner first. Turner posted very strong before tax profit growth, 37% higher at €570 million, driven by annual growth of 19%, which also picked up pace in the fourth quarter, along with continued meaningful margin expansion. So the before tax margin came in at 30% — 3%, sorry, 3%, consistent with the target communicated last year at our Capital Markets Day.
Javier Crespo
executiveNet operating cash flow has also increased substantially, reaching €712 million in total — that's €254 million above the 2023 level — while the net cash position at year-end came to €3.1 billion. During the last month, we finished buying Dornan, a move that reinforces our expansion strategy in that market and, by extension, in Europe's advanced technology sector. And finally, contract awards posted robust growth of 31%, fueled by €6.2 billion of digital infrastructure awards, which pushed the backlog to a new record of €31.9 billion. CIMIC, having consolidated Thiess from the second quarter of this year following the purchase of an extra 10% — that extra 10% stake in the shareholding — delivered ordinary net profit up 7.2% on an adjusted basis, owing to the non-recurring NTN 2023 contribution during the year. We've also undertaken several strategic investments aimed at bringing in technical capabilities that open up fresh opportunities for us in energy, critical metals, and digital infrastructure. Net debt of €1.7 billion mirrors those strategic investments as well as the consolidation of Thiess' net debt of roughly €1 billion. Order backlog came in at €24 billion, up 2.8% on an adjusted basis owing to exchange rate effects. Awards, somewhat softer in building, were more than compensated for by additional contracts won in data centers and health.
Javier Crespo
executiveNow let's go to the next slide, Engineering & Construction, which is Slide 12. In the Engineering & Construction segment, consolidated sales came to €9.5 billion, a rise of 6.8%, driven by favorable progress in our data center and high speed transport output. The EBITDA margin was up 5.4%, and before tax profit rose 17.4% to €192 million. That reflected lower amortization and improved financial efficiencies. Solid cash generation let us end 2024 with net cash of nearly €1.8 billion. Backlog grew 10.2%, supported by the €29.3 billion, supported by a strong level of awards at Dragados, especially in sustainable mobility and transport. Flatiron-Dragados North America was fully integrated last month, and we are working toward delivering synergies which, as we announce, we can tell you will be roughly €30 million to €40 million annually — these are dollar annual figures. The following slide shows how Dragados has evolved. This is the Engineering & Construction sector. Sales were up 4.9% to €5.9 billion, driven by an increase in defense project production; EBITDA came to €332 million, a substantial margin improvement to 5.6%, reflecting good business performance in North America.
Javier Crespo
executivePre-tax profit rose 21.4%, reflecting better financial efficiency and reduced amortizations. Over the year, net operating cash flow increased by €387 million, with excellent cash conversion. Backlog was up 15.1%, driven by a high level of contract awards — especially in Canada, which grew 110% versus the prior year. On Slide 14, you can see how HOCHTIEF Engineering & Construction raised its stake to as much as 10%, reaching up to €3.6 billion. Sustainable mobility remains a key growth engine at Flatiron, with several significant projects, while HOCHTIEF's growth in Europe comes from infrastructure, digital and energy projects. Pre-tax profit grew in the same proportion as sales, keeping margins stable. By year-end, the net cash flow position stands at €1.175 billion. The portfolio of nearly €11.6 billion rose 3.9% adjusted for the exchange rate, supported by awards worth €4.4 billion. Now, moving on to the Infrastructure segment on Slide 15, we can highlight that Abertis delivered very good operating performance, with revenue and EBITDA growth of 9.8% and 10.3% respectively. Abertis's contribution to net attributable ordinary profit increased 3.6%, including the impact of fiscal regulation and concessions in France.
Javier Crespo
executiveIridium lifted sales by 77.5%, helped by the extra contribution from A13 and Skyports. Iridium's contribution to net profits lines up with the 44% stake in SH-288 through October 2024, and it's worth noting that this year Iridium was awarded the SR 400 Express Lanes project in Atlanta, Georgia. By way of Iridium, HOCHTIEF PPP Solutions and Pacific Partnerships, we represent an investment and development platform for Greenfield assets with a solid international footprint that is diversified, and we have a presence in the USA through Iridium Europe with Iridium and HOCHTIEF PPP, plus a leading position in Australia through Pacific Partnerships. Our backlog is diversified mainly thanks to a reasonable value of €1.2 billion across motorways, trains, and social infrastructure. We're putting money into digital infrastructure in data centers — large-scale, sustainable edge data centers — through HOCHTIEF, and through HOCHTIEF we are contributing capital of €28 million. Later on I'll come back to our strategy for investments in data centers. And finally, we should highlight our presence in sustainable mobility through our investments in Skyports and Glydways, for a total of €149 million. Now, moving on to Slide 17, with the performance of Abertis.
Javier Crespo
executiveAbertis has delivered solid results, with revenues up 9.8% and EBITDA up 10.3%. Traffic has increased, helped by heavy vehicles and strong performance in Spain, Mexico and Brazil, where traffic grew well above 3.5%. During the year, there were acquisitions including the Autovía del Camino and 50% of Trados-45 in Spain. The extension to 12 years of Intervias in Brazil, or the purchase of Santiago-Los Vilos in Chile. Through these transactions, the average life cycle of those concessions has increased, making it possible to replace cash flow. Once again, the strategic section of the presentation will let me discuss Abertis's current situation within the framework of its perpetual growth model. Abertis has strengthened its liquidity and financial soundness, cutting net debt by €3.3 billion and issuing €1.8 billion in bonds since January 2024, including the emission of a hybrid bond for €750 million over 5.25 years. On Slide 18, we show the breakdown of the key figures by country for Abertis's backlog, where we can see significant traffic growth in significant markets such as Spain, Brazil, Mexico and Puerto Rico.
Javier Crespo
executiveThen, as we do annually, we’ll take a short portion of this call to review our strategic business lines. First, we’ve built on our global leadership in high-growth segments with appealing margins—digital infrastructure, energy, defense, mobility, the biopharma sector and health, and critical metals—while at the same time holding our position in the more traditional business line. Second, we’re adding specialized engineering and systems capabilities, both organically and inorganically, so we can carry out complementary activities in the value chain. Third, we’re putting capital into traditional infrastructure projects and state-of-the-art infrastructure with digitalization, responding to demand for energy and demographic changes, while at the same time generating value for our shareholders in the short and long-term. Great opportunities lie ahead of us, thanks to our engineering capability, our global presence and our access to our customers. And fourth, we keep promoting operating efficiency through strategic integration, streamlining of resources and simplification. And finally, we continue to reduce the risk profile of our portfolio by increasing the weighting of our collaborative contractual frameworks. And on a financial level, our target remains to keep the Group financially sound and to generate value for our shareholders in the short, medium and long-term.
Javier Crespo
executiveThe next slide shows how we intend to bring specialized engineering and systems capabilities in both organically and through acquisitions. There are four basic pillars supporting this. First, technology, innovation, and integrating systems and platforms across the Group; second, know-how as our key competitive edge, plus applying that know-how in global logistics to transform traditional processes; and finally, financial experience along with experience managing large-scale projects. We've made a number of complementary acquisitions in key sectors. Turner has bought the Irish engineering firm Dornan, the third largest electromechanical company in Europe, and that will reinforce our expansion strategy in the European market with a pipeline of more than 20 billion million in identified opportunities. Segment has also reinforced its standing as a global service provider in mining and refining of essential minerals for the energy transition, with the incorporation of Prudentia Engineering and MinSol Engineering. And Thiess has grown its global mining portfolio through complementary acquisitions in the critical metals sector with PYBAR and Mintrex, and later on, Asia has acquired Maverick, an engineering consulting company for digital infrastructures, advanced technologies, and high-rise buildings.
Javier Crespo
executiveMoving on to Slide 22, you can see our intention to direct capital toward both conventional infrastructure and cutting-edge facilities, leveraging the fresh expertise and engineering skills we now possess. On a worldwide basis, the ACS Group has built a solid standing, concentrating on data centers, applying a holistic approach and coordinating across our companies. It also put measures in place during 2024 to carry out our data center investment strategy in the market. That market is expanding at a very rapid pace across the globe, driven by cloud computing's expansion and the explosive growth of artificial intelligence. In the United States, the digital infrastructure market is projected to rise from €102 billion in 2023 to €149 billion in 2029. In Europe, it is anticipated to hit $65 billion by 2029. The Asia-Pacific region will see the greatest expansion over the coming few years, with the strongest growth occurring in heavily populated countries. Right now, our investment portfolio stands at 2.1 gigawatts across projects already in progress for 2025 in the U.S., Spain and Australia. Beyond that, we are assessing over 4 gigawatts in our core regions, primarily the USA. On top of this, HOCHTIEF is pursuing a complementary strategy for edge data centers, rolling out smaller-scale facilities in urban areas to cut latency, especially when processing AI and cloud services inside closed networks.
Javier Crespo
executiveRight now, we're constructing a sustainable data center together near Essen in Germany, with plans to grow to 15 data centers at a smaller scale. And as we said earlier, you'll receive further details on our strategy and data centers at the Investor Day we're scheduling toward the end of the year. When it comes to managed lanes in the United States, we're pursuing a pipeline along with various tender concessions, and there are four key elements for us. The success of the SR project, which bolsters our standing as a key player, Flatiron-Dragados being our preferred contractor in the U.S. market, and our ability to optimize toll solutions and revenues via the concept of technical alternatives. And lastly, our demonstrated experience in managing major and large infrastructure projects. On the following slide, we can see the Group's strategy in integration strategy and streamlining and simplification aimed at improving our operating efficiency. The Group is executing projects of varying sizes around the world related to supply chains to optimize synergies, optimize the supply chain, centralized functions to reinforce the climate of knowledge exchange among companies. And one example of this is Flatiron-Dragados, which will complete this strategy in 2025.
Javier Crespo
executiveWe are the top firm in engineering and civil construction across the United States, reinforcing our standing within the industry, and we're already putting key synergies into practice and bringing them on board. I want to bring up the perpetual growth model at Abertis, which gets a mention in our strategic framework as well as in last year's Capital Market Day. And I'll walk through what is being accomplished. Abertis anchors its strategy on optimizing and extending the life cycle of the existing asset portfolio by way of mutually beneficial agreements with the awarding administrations. And inorganic growth concentrates on brownfield assets in key countries. Beyond that, sound financial discipline sits underneath the effort to secure an investment-grade rating while delivering attractive returns. Moving to the next Slide 25, we can observe how some important metrics are performing as part of the strategy that's being delivered. From 2018 through 2024, Abertis has succeeded in raising its EBITDA by roughly €100 billion. Simultaneously, it has managed to extend that EBITDA which expired across those years. And at the same time, the average duration of concessions has risen by two years, and deleverage has moved from 6.6x to 5.4x. Lastly, we can see that the relationship between EBITDA backlog — the sum of forecast EBITDA for all these assets at the same — at the end of its concession life cycle over the current net debt has been reinforced.
Javier Crespo
executiveAnd that growth model as of the close of 2024 tells us the platform has expanded, and with the replacement, the EBITDA that had run its course is now higher, the average concession life cycle has been extended, and leverage has come down considerably. So let's proceed with the solid operating and financial results for 2024. As you can see, we've achieved substantial progress on our strategy aimed at delivering growth and profitability for our shareholders. Group sales came to €41.6 billion, up 16.5%. Cash flow conversion was excellent all year long, producing net operating cash flow of €2.1 billion — 2x what we recorded in 2023 — while net debt stood at €700 million at year-end, leaving us in a sound financial position to invest in future growth. Our portfolio has hit a record €88.2 billion. On top of that, we hold certain forecasts for growth ahead, supported by a global leadership position in strategic growth sectors. That affords us meaningful access to Greenfield opportunities, including the Managed Lanes project or tender process in the U.S., along with investment in digital infrastructures across all regions.
Javier Crespo
executiveAlright, we've closed a number of major corporate deals that back up our strategic plans — for example, the purchase of Dornan by Turner to bolster what we can do in Europe, bringing Flatiron-Dragados together in the USA, which is going to produce meaningful synergies, plus other strategic M&A opportunities in natural resources and critical metals. Ordinary net profit came in at €684 million, up 14%, which goes beyond the 8% to 12% range we had guided to. So our growth and financial targets have been achieved. We're also diversifying the portfolio into high-growth, high-margin segments, expanding our technical capabilities, putting money into traditional infrastructure, and pursuing operating efficiencies. We're confident in our ability to keep growing, given our proven strategy, and we're well placed to keep increasing that ordinary net profit. Thank you all very much for attending, and we'll move on now to the Q&A. Thank you. Actually — sorry, before we begin the Q&A, we have an announcement. This morning we published that Abertis has agreed to buy a 51.2% stake in the French Highway A-63, a key route linking Spain with the North, running 104 kilometers and connecting the border at Bayonne, Hendaye and Toulouse.
Javier Crespo
executiveThis sits right by the Spanish border — the A-63 — and it's a major trucking route as well, connecting Bordeaux, a city of over 1 million residents, with several important scientific research hubs. That makes the position there even stronger. There's room to grow over 26 years of remaining concession life: €170 million in revenue was the 2024 figure for the A-63, and the concession runs until 1950 — 2050, I should say — as a result of this new acquisition. Abertis becomes stronger in one of its core markets, adding to its growth strategy and replenishing cash flows at the company, lengthening the Group's concession life. This deal, along with the recent purchases in Puerto Rico, Spain and Chile. So it's the ability to keep a balanced backlog with a solid currency mix — the dollar, the euro — and also in countries with stable legal certainty. There's still a regulatory approval process ahead. But altogether, €400 million in capital will go in to bolster the company's balance sheet for this acquisition and others down the road. Thank you.
Analyst
analystGood morning. My name is Victor, and thank you for that presentation. I have several questions. For the first one, let me begin by asking about Abertis. You just made that announcement. How much money are we talking about? How much investment is involved there? The second question concerns Turner. Regarding the data center strategy, what would the figure be for equity invested in the ACS Group? If you separate HOCHTIEF out from ACS, I believe you gave the equity committed figure for HOCHTIEF. I think it was €400 million, more or less. So what would the figure be now, then, linked to that data strategy? I have another question. What competitive advantages do you see the Group having when you're competing against your top competitors? What advantage do you have within the Group to ensure you can achieve more growth than your peers, and also with the data strategy, on the basis of equity investment and your experience in the sector — I mean, can you tell me about your IRR and the multiple you're looking for on the deals and these investments? Emilio, I have a question too about Turner.
Analyst
analystThere's €3 billion of cash sitting there. So how might that money be put to work for the Group's purposes? That's a sizable cash pool. In what ways could the cash be deployed more efficiently inside the Group to enhance the Group's ratios, or the company's ratios? And finally, on the Group's cash flow, you did mention that current cash flow growth has been very strong, above the average figure. So could you speak to guidance — your guidance, then, particularly regarding the dividend to be paid out in the — you discussed it at the Capital Markets Day, and you said it might be going up this year — by how much? Thank you.
Javier Crespo
executiveThanks a lot. But before you hand that mic over, would you mind repeating that second question for us?
Analyst
analystRight, the first item concerned Abertis. Then the second one — I believe during HOCHTIEF's conference call last week, a slide was shown covering the equity committed at HOCHTIEF's level and the equity invested in infrastructure, data centers, PPPs, and so on and so forth. So my question is this: could you provide that same figure for the ACS Group, so we can compare what equity the ACS Group has committed and invested at the level of its subsidiary HOCHTIEF against your projections going forward? Thank you.
Javier Crespo
executiveOkay, thanks. Sure — I’ll begin with that final question, and after that I’ll discuss Abertis. For HOCHTIEF, the number was €400 million, and there are 2 parameters we need to include here. First, the investment commitment of roughly €1.1 billion in Georgia. And we believe that over the next year we’ll be putting about €700 million into data centers, in land, in energy, and in fiber. Then you asked about competitive advantages for data centers relative to our peers — the competitors we encounter every day — and we are trying to get closer to the engineering and technology capability of companies such as Jacobs. You can see that in critical minerals, since we compete very strongly across a number of sectors, and we’ve completed a number of strategic acquisitions so we can compete at that level. We continue to do that in digital infrastructure and in some other sectors — semiconductors is one — and we hope very soon to be able to compete in nuclear as well. What we do have — and I think this is the correct assessment — is construction capabilities, and we have them in the North American market. That means we had a footprint in 47 states in 2024; €26 billion was — were our revenues there, 100% from North America, and we hope that next year we will be above €30 billion.
Javier Crespo
executiveAnd I think that proves how strong we are in infrastructure — digital infrastructure for batteries, for semiconductors, industrial infrastructure, or civil engineering infrastructure. That really matters. That's North America for you, but it applies to every country in Europe and Asia-Pacific, and Australia too. Now on the multiples — the multiples without the "to," or the multipliers for Iridium, they differ a great deal. If you take out the Managed Lanes project, it could be 1.1 to 2.5, I believe, for those projects. But the Managed Lanes projects have done far better — more than 10x what we put in. So the Managed Lanes strategy we have over there matters so much; in SH-288, we're putting in €360 million of equity, and Texas said it would be €4 billion, and that's what it would be worth when it chose to take the infrastructure away. And so really, it was €2.7 billion, but those multipliers are the same as the Managed Lanes projects we have across the rest of the U.S. So what is it — €1.2 billion or €1.3 billion we're investing in Georgia. So we think we can achieve those same multipliers there over the next few years with the stake we hold.
Javier Crespo
executiveThere's a major project across Virginia, North Carolina, Georgia, and Tennessee too. Right now we're in the prequalification phase. So it matters to us not only to compete for these projects but to also be present in construction and to succeed there. The next project — or actually, the next question, the speaker corrects himself. You're asking about guidance on the dividend — the dividend. At the end of March, the Board of Directors will put forward the proposal. We can't comment on that at this point, and shareholders will approve it at the AGM in May. So I can't say anything about that. But we can't provide any further information right now. But let me wrap up by talking about Abertis. And let me give Abertis a lot of thought. I think it's a good thing to do here now, since we've mentioned Abertis. In the presentation I did explain what we've been doing at Abertis, but the backlog to net debt ratio is really important. It is getting stronger. It stood at 3.4% in 2018, and it's now 5.5% in 2023 — well, that was 2023 and 6.2% in 2024. What does that mean?
Javier Crespo
executiveWhat this means — and it really matters — is that our backlog would let us cover 6.1x our debt, versus the 3.4x of debt we could have paid off in 2018. Let me give you another point on Abertis. Abertis Vittas <<inaudible>> in 2023, which we announced at the Capital Markets Day for 2023, came to roughly €4 billion. That was the forecast at the time. And taking into account the acquisitions completed since that Capital Markets Day — including the contracts won in Spain, and the A-63 Highway, and in particular the extensions and renegotiation of contracts — as things stand today, under one year after the Capital Market Days, we believe it will be €4.75 billion. Naturally, we — if you look a little at 2024, it would be €4.3 billion. And I'm looking ahead, so excluding Seneb we're projecting €4.75 billion in EBITDA, against the 4.3% that we already have now. So that's very important too, because the market has plenty of questions out there, but what will happen after Seneb, and there's a great deal of speculation about what will happen. And the other figure that I think matters a lot.
Javier Crespo
executiveThis was also shown on one of the slides — that in 2018, taking into account the concessions that had expired, our EBITDA would have been €2.6 billion in 2018. We had €900 million more, but I'm going to strip those out since some of those concessions have expired. So for a like-for-like comparison here, the €2.6 billion can be set against the €4.3 billion in 2024. So we're talking about €1.7 billion more in EBITDA than 2018, even with the AP7 having expired and so on and so forth. So I hope that with these figures, I can give you visibility on Abertis, because everyone is always asking what will happen — what's going to happen after France. So what's happening with that debt? Well, certainly here in 2024, and we've been talking about this, we're still renegotiating a lot of our current contracts, and there are a couple of short-term acquisitions there. And we think, if we have that increase of €700 million in projected EBITDA in 2023 and less than a year, what's happened in the Capital Markets Day — I just imagine what's going to happen next? I say that because there are always a lot of questions about better.
Javier Crespo
executiveAnd I believe Emilio has some further questions.
Emilio Grande
executiveThank you. We believe — though the accountability and responsibility for all of the businesses rests with us, across those businesses — that when it comes to optimization, from an outside perspective, you might think we could realize more cash, pursue more optimization. Yet we believe holding that solid position in each of the different business units is far more beneficial, for many reasons: facing customers when you sign contracts, for instance, better access to local markets, obtaining financing facilities, for many reasons. We believe that is the best policy, and that is why the Group maintains that philosophy. That said, of course, we do pursue financial optimization at times, and there will be specific months at times when we will do so.
Analyst
analystGood morning. I have a number of questions. Actually, quite a lot of them, since analyst and investor attendance has been thin today, but we've received many questions through the web. To begin with the general ones, a few have come up more than once. Some relate to our investment plan, all the things we've discussed, our Abertis and the data center plans. How do we view the Group's financial ability to take on these projects? Lease, for instance, noted that SR 400 is a huge investment that will be forcing over the coming years. And will we have the capacity to invest in those Managed Lanes over the next few years as well as the data center plan? What is our financial capacity to take on these investments?
Javier Crespo
executiveOkay, let me take you back to Capital Markets Day and compare the numbers we presented at that point with where we are today, and how the situation has developed. It's accurate that our forecast at that time was net operating cash flow of between €1.1 billion and €1.3 billion, and it's also accurate that in 2024 we achieved €2.94 billion. So for this year, we've seen an improvement of 94%. And you have to picture that from 2024 through 2030, we bring in €1.5 billion — just to keep a conservative number in mind, let's assume we'll be at a €1.5 billion level, which multiplied across that period gives us roughly €10.5 billion in cash flow generated. At Capital Markets Day, we referenced a divestment plan and amortization of around €3 billion. And since we're speaking about 2024 to 2030, we're holding to that number. And that's correct — of the €3 billion, we've already carried out €1.5 billion, plus €500 million from the derivatives. So roughly €2 billion would still remain to be executed. So if we assume shareholder remuneration that is similar to or growing versus last year, we'd need to pay out approximately €5 billion between now and 2030.
Javier Crespo
executiveSo when you put all of that together, we'd end up with roughly €8.5 billion in free cash flow — net cash flow, that is. Now, how do we plan to use that €8.5 billion? There are a few different buckets. First, our entire strategic plan for infrastructure — which covers Georgia, the Managed Lanes and the additional ones, and also takes in the data centers and other projects — comes to about €4.5 billion, since it's a fairly large project. Then we've got roughly €2 billion set aside for strategic investments, and that figure includes, say, the 2,000 Dornan carried out in 2025, along with certain other acquisitions and others we're considering. So if you run the math, we're left with a surplus of about €2 billion, which will most likely be directed toward Abertis and further acquisitions. That's essentially where things stand versus what we laid out at the Capital Markets Day.
Analyst
analystData center market keeps coming up in many of the questions. With all this digitalization and more strategies, there's plenty of discussion about future demand in the markets, as well as future investment and hyperscale. So people ask us about demand in the short term—2025—and mid-term demand as well. Another question we keep encountering concerns bottlenecks; in the construction phase, financing is obviously clear, but there's a lot of noise out there regarding what constraints we may run into when developing these products.
Javier Crespo
executiveOkay, so overall, growth in digital infrastructure — and going back to those numbers I presented, it was exponential, and those are in fact below what we're hearing announced for hyperscale in 2026 and 2027, and the plans being announced across the rest of Europe, aside from the target of €500 million of investment and the AI investment of €2 billion out there for Europe. So when you talk about digital infrastructure numbers, well, the figures are simply stratospheric, aren't they, in their scope and size. So where do we see opportunities for us? Definitely in construction. Right now, we have a €7.5 billion backlog, and that €7.5 billion order backlog does not include the latest contract awards — the most recent ones — because at first we go into a design phase, and that lasts for a certain length of time before we actually sit down and sign the contract, which is why we don't include it in the backlog initially, so I would say we're way above the €10 billion figure, and I'd be very conservative in giving that figure. So where do we see those opportunities? Quite obviously, everything to do with developing the land and everything to do with developing energy, and also the permitting.
Javier Crespo
executiveSo these are the opportunities we've pinpointed, and they're the ones we're actively pursuing. Where do we spot the barriers to entry? A really obvious first one is that only 2 years back, a data center of roughly 50 megs counted as a big one. Now we're discussing 2 gigawatts for a large data center. That kind of growth simply — it's been achieved little — if you can't do it little by little. And I mean over 3 years. Jumping from 500 to 600 and then all at once to 1 or 2 gigawatts is extremely hard, and then the project in Louisiana is nearly the size of Manhattan, the Orlando Manhattan. Just to give you a sense of what to give means for the data center, and you've got your energy plant as well. So having the engineering capacity, the process capacity, the system's capacity to take on a project like that is very difficult. That's the first point. The second point — and this isn't only about construction, it's more about development. We find it very difficult for us to develop land, change the land use, get the permitting complete and get the environmental impact assessment, so we do this organically in-house, and we do this in all countries don't we see.
Javier Crespo
executiveYet simultaneously, we’re developing land next to sites for other customers. So with any platform, you’re looking at millions and millions in investment, and you also need the ability to execute globally. And to be able to fund that — that’s a very large sum we’re discussing. And you would need to proceed without any lease agreement finalized. So that creates a barrier to entry, because typically you invest only once you’re certain that you have an exit path. So this would be one more barrier to entry. We also see it as a barrier because, whether you choose colocation or a hyperscale lease, you generally don’t come to the table until 6 months or 12 months beforehand, since you want to be absolutely certain that you can enter the execution phase 12 months ahead. So a great deal of money must go into engineering and construction before that point. And either you know what you’ll be asked to deliver because you work with the clients, or you have no visibility into the budget until 12 months before.
Javier Crespo
executiveSo what that means is you already have the site secured, the design work done, the engineering figured out. And you've begun awarding subcontracts even before the contract is signed. So either you're handling this kind of work every day and you bring the experience — and it's really tough to pull off. To wrap up, there's substantial investment involved here. But these aren't exactly obvious projects or obvious investments sitting out there. So from where we sit, we still believe this market will keep growing. Let me use this question as a chance to note that this is one of the major growth markets, and we're also witnessing enormous growth in defense. Our order backlog is climbing at a double-digit rate. Energy — general energy — and critical minerals is another one. And when you combine natural resources and mineral resources with critical minerals, we're talking about a backlog exceeding €10 billion, and we continue to see major growth there. But commodities rise and fall, of course. Right? There's considerable volatility around which specific critical mineral is driving that growth.
Javier Crespo
executiveStill, because our business is spread across so many areas and we've taken write-downs across the entire chain, what we're finding is that, on balance, our overall market is expanding considerably. We're also seeing the Managed Lanes opportunity in North America. Then there are the opportunities at Abertis, and as I mentioned earlier, I genuinely believe that, all in all, this is a favorable moment for the market to grow.
Analyst
analystThen there's another question that keeps coming up. It concerns the cash flow we achieved this year. Some praise has been given. It has been solid, I have to say. And given HOCHTIEF — well, what are the main components behind this cash flow of €2.1 billion, which almost reached that level when at the Capital Markets Day we spoke about lower figures? And in particular, how much of the base, yes, excluding HOCHTIEF, has performed better? What are the reasons for this? And above all, how do we view the future? How do we view the next few years, 2025 to 2026, in terms of cash flow performance?
Javier Crespo
executiveOkay, the clearest way to address this is to go through each company individually and compare cash flow performance with the prior year. Still, essentially every area across the Group has performed well. Turner obviously stands out, since Turner delivered net operating cash flow of €712 million last year during an excellent year of €458 million. And as I mentioned, this year it has reached €712 million. So a very strong improvement has come about purely because of Turner. CIMIC rose €161 million, and within construction €331 million, while Dragados is a standout this year, posting €316 million against minus €72 million last year. That represents meaningful growth, along with the remaining businesses in 2024. And frankly, these numbers were not what we had anticipated. At the Capital Markets Day, our average was 1.1 and 1.3 per year. When we discussed projections for the use of funds, the average was €1.5 billion, yet no slowdown is appearing in the market. On the contrary, we see growth that is achievable and contracts that are solid for us, because we are lowering risk. So we are encountering — we are not encountering surprises left over from the past, apart from some unwinding of projects that are finishing.
Javier Crespo
executiveAnd take CIMIC as an example—apart from that, we aren't running into two surprises the way we did previously, when projects ended up accumulating a great deal of cash flow. At the moment, nothing like that appears to be coming. So my preference is to stay cautious. My preference is to provide revised forecasts from the Capital Markets Day. But it's certainly a good moment for growth across every area.
Analyst
analystThere's another question regarding the HOCHTIEF stake we hold, which stands at roughly 80% — you noticed a modest shift during last year. What's our vision for that stake? Should we expect further increases? Do we have any other corporate plans in that regard? What steps will we take?
Javier Crespo
executiveMy response to that question never changes. The truth is that HOCHTIEF is performing extremely well, with tremendous expansion via Turner, via CIMIC, or via Flatiron, which following that merger with Dragados. And growth was also possible in Europe, particularly since our starting point there is a low base, and we have faith in Europe, and we intend to put investments into Europe. But therefore we are 100% convinced about HOCHTIEF. That 100% trust in HOCHTIEF is something we hold. Then regarding acquisitions, we will simply seize whatever opportunities we spot out there, depending on what the share price is 150 at the moment. And we do believe there could be considerable upside there. And whenever we see opportunities, we will analyze them. But right now, we don't have any predefined acquisition plan.
Analyst
analystAnd here's another thing people tend to ask about, Classe: will we keep going with the plan to sell it off, or not? What's our thinking on Classe?
Javier Crespo
executiveRight, Classe is part of our project portfolio for businesses that could be monetized. Classe is a great company, and it's one that might still grow substantially given the market opportunities out there, but what we don't want is to sell it off below the price we have in mind. Even though there's a lot of interest — there has been a lot of interest in the company over the last few years — until we get the value, the figure we have in mind, we will not let Classe go.
Analyst
analystWe've had a few technical questions regarding the hybrid bonuses from Abertis — specifically, whether we believe the new regulation will have an impact on Abertis's financing. We were also asked about how Abertis is financed and how we plan to back Abertis in its growth, and whether this acquisition calls for a capital increase at Abertis that we would pursue in connection with this acquisition of the A-63.
Javier Crespo
executiveI believe I'll start with Emilio on the first one. In any case, regarding equity, I brought this up earlier, and for this acquisition as well as other ones we might potentially pursue, we anticipate a capital increase of €400 million — €200 million of which would come from us. And I'd like to point out that one positive aspect we've observed at Abertis is that to produce €1.7 billion of EBITDA, the incremental amount between 2018 and 2024. We have put in 100% €650 million. So when we discuss that capital increase, naturally that figure is excluded. And that demonstrates the strong equity-to-EBITDA ratio we're delivering. And this comes about because a substantial portion of EBITDA growth stems from tariff increases, the traffic contracts, and through acquisitions too. And that's why we have such a solid ratio in that respect. At present, as I noted earlier, we are in fact examining various acquisitions, but we do perceive an opportunity to renegotiate timelines and concessions broadly. So therefore, in thinking about what Abertis will require over the coming few years. We must factor in that a substantial share of EBITDA growth will come through extending concessions and through awards.
Javier Crespo
executiveAnd yes, we genuinely believe that the 400 is going to move things forward — the A-63 as well as the other projects that are underway. And on the Abertis hybrid, do we anticipate any effect at all from regulatory shifts in the support given to Abertis's capital structure? Or will there be any other technical adjustments to the hybrids, and part of the refinancing at Abertis has been significant. As a matter of fact, there has been a refinancing, as you're well aware, of €750 million, so we really don't expect any changes there.
Analyst
analystAnd then just a final question on the outlook or guidance for this year. A lot of folks have asked us about the range moving from 8.12 up to 8.17. What factors are behind the greater optimism we have about how this year will play out?
Javier Crespo
executiveWell, naturally, we're optimistic when it comes to our operational business. Well, that gap exists because we have to provide it on its guidance, right? It's merely guidance, and there is flexibility built into it, but we are definitely optimistic regarding our operational figures, and we see growth across the Board in every area over the next year. We have provided practically the same guidance that we gave in HOCHTIEF, and the different elements will be driven. So it's 30% of Abertis, Classe and Iridium—those are the only elements not included in HOCHTIEF. So we're very optimistic about all our business areas with those components, too. Well, that's it. There are no further questions. Thank you very much to everyone.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete ACS, Actividades de Construcción y Servicios, S.A. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to ACS, Actividades de Construcción y Servicios, S.A. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in ACS, Actividades de Construcción y Servicios, S.A. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.