Good morning, everyone, and thanks for joining the 2025 results call for ACS Group. With me are our Corporate General Manager, Ángel García Altozano, and our Chief Financial Officer, Emilio Grande. As always, following the presentation we'll hold a Q&A session so we can give you whatever clarification you need. Anyone connected through our website can submit questions via the established channel. Let's begin with the first slide of our presentation. During 2025, the group posted very strong operational and financial results, with solid growth in sales, backlog, and net profit, supported by robust cash flow generation. We're making solid progress executing our strategy, increasingly drawing on our global footprint and engineering expertise to drive sustainable growth. We remain active in pursuing highly attractive equity investment opportunities across both traditional and next-generation markets, creating long-term value for all our stakeholders. Let me walk through the key highlights for the period. Ordinary net profit came in at €857 million, up 25.3%, or 32.4% FX-adjusted, surpassing the top end of our revised guidance. On a reported basis, net profit was €950 million. Sales and EBITDA rose by 20% and 20% respectively, driven by robust momentum across all our segments.

Juan Santamaría Cases

executive
#2

Group operating margins also strengthened. Over the past 12 months, net operating cash flow came in at €2.2 billion. Adjusted for factoring variations, that represents an increase of €320 million, which underscores the quality of our profit growth. Thanks to this robust cash generation, the group ended 2025 with a net cash position of €17 million. That figure comes after we allocated €2.1 billion toward strategic investments and shareholder remuneration. On the strategic investment side, this includes €564 million for data center projects, €436 million related to the Dornan acquisition, and €200 million as a capital contribution to Abertis. Shareholder remuneration accounted for an additional €448 million. New orders booked during the year totaled €62.5 billion, reflecting an accelerating growth trend of roughly 27% FX-adjusted, which drove a higher book-to-bill ratio of 1.3 times. Within that outstanding new orders total, digital infrastructure accounted for approximately 28%, or €17.6 billion, growing around 130% year-on-year on an FX-adjusted basis. Our order backlog expanded 14.6% FX-adjusted to reach €92.9 billion, helped by sustained demand in biopharma, defense, critical minerals, and data centers. Going forward, we remain highly confident about the group's outlook and have set an ordinary net profit growth target of 20% to 25% for 2026, up to €1 billion 70 million, supported by strong fundamentals.

Juan Santamaría Cases

executive
#3

Now let's examine the group's consolidated results for the period in more detail. Revenue climbed 19.7% to €49.8 billion, powered by Turner's outstanding showing, which posted organic growth of roughly 34%, or 40.3% on an FX-adjusted basis, with particular support from digital infrastructure, healthcare, and education projects. That momentum was given a further boost by bringing Dornan into the fold and by fully consolidating Thiess starting in the second quarter of 2024. EBITDA came in 25% higher at €3.1 billion, as margins widened in every segment and at the group level overall. Profit before tax reached €1.7 billion, an increase of 67.3%. On a comparable basis, PBT was up 24.8%, driven in particular by Turner's outperformance and the solid progress at FlatironDragados. We posted strong ordinary net profit growth of 25.3% year-on-year on a comparable basis, at €857 million, which is above the top end of our full-year guidance. Moving now to how ordinary net profit breaks down, I'd like to call out the following. Turner turned in an outstanding performance, with its contribution up 66.6% to €549 million, thanks to strong growth in high-tech markets and better margins. CIMIC added €199 million, helped by robust growth in data centers, biopharma, healthcare, and education, as well as natural resources. Engineering & Construction posted a very strong result, up 35.7% year-on-year, reflecting a larger contribution from FlatironDragados and solid results in HOCHTIEF Europe.

Juan Santamaría Cases

executive
#4

Abertis turned in a resilient operating performance for the period, even with the non-operational effects. Over the year, the group carried out efficiency measures that came with €32 million of restructuring costs, intended to simplify operations and unlock synergies that should lift performance in the years ahead. On Slide 5, you can see how strong and consistent the group's cash flow generation is. Net operating cash flow came to €2.2 billion, helped by a robust EBITDA increase of 25% and an outstanding level of cash conversion. Once factoring variations are adjusted for, net operating cash flow rose by €320 million. On top of that, faster cash flow generation in the fourth quarter improved on the prior quarter's trailing 12-month figure of €2 billion. As of December 2025, we reached a net cash position of €17 million, an improvement of €719 million since December 2024. That result stems mainly from the group's strong net operating cash flow, which is enabling significant strategic capital allocation initiatives. During the period, we executed €1.7 billion in financial investments, including €564 million in data center projects, €436 million for the Dornan acquisition, €316 million of M&A, €207 million in other net infrastructure equity investments, and €200 million for the Abertis capital contribution. Financial divestments totaled €1 billion, including the 50% sales of UGL Transport, the data center platform 50% divestment, and the final settlement of ACS Industrial.

Juan Santamaría Cases

executive
#5

On top of that, €448 million in cash went toward shareholder remuneration. Our disciplined approach to deploying capital underpins our long-term growth strategy while keeping our financial position solid. Turning to slide 7, our order backlog sits at an all-time high of €92.9 billion as of December 2025. That growth was driven by a very strong order intake of €62.5 billion, up 26.6% FX-adjusted, which produced an improved book-to-bill ratio of 1.3 times. This very positive performance shows the group's continued success in winning high-quality projects across strategic growth markets, especially in data centers, defense, biopharma, critical minerals, and nuclear. Notably, digital infrastructure now represents approximately 28% of new orders, up circa 130% year-on-year FX-adjusted, fueled by the strong, sustainable demand in data centers. We're also seeing strong traction in Germany, where our positioning lets us benefit from the country's increased focus on infrastructure investment. New awards in Germany rose by approximately 41% year-on-year, reinforcing our ability to capture opportunities in this key market. On the following slide, we can see a selection of recent awards. It is worth placing these projects in the broader context of the ACS Group strategy, where we have continued advancing to become a leader in rapidly expanding strategic growth verticals, including artificial intelligence, digital and tech sector, energy, including nuclear, critical minerals, and defense.

Juan Santamaría Cases

executive
#6

That momentum rests on a presence we have built locally over many years in the core infrastructure markets of North America, Australia, and Europe, and that presence continues to underpin our competitive edge and our capacity to grow as a lifecycle partner into these next-generation markets. We'll begin with digital infrastructure and advanced tech, a sector in which we hold a leading position. The global data center market continues to expand very rapidly. Demand for cloud services and AI is surging, and that is projected to quadruple DC and compute capex by 2035, driven by generative AI growth and continued cloud migration. As a well-established global provider of end-to-end solutions, the group possesses the resources and capabilities needed to satisfy this growing demand. Over the period, we secured a number of new large-scale data center projects. These new awards include the announcement of a 902-megawatt data center complex to be built in Wisconsin, forming part of the $500 billion Stargate program. More recently, Turner was given a role in delivering the $10 billion, 1-gigawatt data center campus for Meta in Indiana. In Europe, Dornan won the construction of a 160-megawatt data center in the Netherlands. That award stems from Turner's expansion strategy into Europe, with Dornan carrying out a project for a recurring Turner client.

Juan Santamaría Cases

executive
#7

We're also going to construct a 58-megawatt data center over in Malaysia on behalf of a repeat client we've worked with for a long time. Work is already underway on that data center in Alcalá — it's a joint collaboration together with Dragados, Iridium, and Turner — and source report space within the context of the data center platform. On top of that, we enjoy solid medium-term visibility thanks to our order book and a growing project pipeline across North America, Europe, and Asia-Pacific. Energy-related infrastructure stands as another key strategic growth vector for the group, with demand rising structurally, driven by global energy needs and security of supply. ACS holds a strategic position spanning the entire energy value chain — from generation and storage through to transmission and advanced technologies — backed by strong end-to-end capabilities and worldwide engineering expertise. Having several decades of experience in designing and building nuclear power plants and complex energy facilities around the world for leading utilities, the group is well placed to help deploy next-generation technologies, among them small modular reactors, or SMRs, along with new-build, storage, and decommissioning projects. That puts us in a market where investment in Europe is expected to exceed €500 billion by 2050. Early in 2026, we hit an important strategic milestone: we were chosen to be part of Amentum's global project delivery team for the Rolls-Royce SMR nuclear program.

Juan Santamaría Cases

executive
#8

In the last quarter of 2025, we landed a big framework contract covering nuclear and civil works, valued at as much as €685 million and running for as long as 15 years, which involves civil infrastructure work at the Sellafield nuclear site in the UK. Moving to renewables, we keep reinforcing our position in the market, especially in Australia, where our companies have completed over 20 major renewable and storage projects. This momentum in new awards is reflected in CIMIC subsidiary UGL being chosen for the Western Downs Stage 3 Battery project in Queensland, Australia, to build a major renewable energy storage facility with energy storage capacity of 1,220 megawatt-hour. Now let me move to critical minerals and natural resources, which is another strategic growth market for us. We are taking advantage of accelerating demand for critical minerals, driven by clean energy technologies, digital infrastructure, and defense modernization. By leveraging the combined capabilities of Sedgman and Thiess, we have built a global position in minerals processing and sustainable mining services across key commodities such as lithium, copper, rare earth, nickel, vanadium, uranium, and zinc. In December, the group broadened its partnership with Vulcan Energy through a significant cornerstone equity investment, while securing an end-to-end role in developing its lithium production and processing infrastructure in Germany.

Juan Santamaría Cases

executive
#9

Also under that agreement, we were named EPCM contractor and preferred supplier for the project's civil works. Furthermore, Hindustan Zinc has awarded us a contract to help deliver India's first zinc tailing recycling facility. Not long ago, we won the contract extension at Mount Pleasant Operation in New South Wales, Australia, covering full mining services. Turning to defense now, where infrastructure spending is set to rise considerably across the globe. In Europe, large multi-year defense investment programs, Germany's among them, offer significant opportunities in defense-related capital works, and possibly through the public-private partnership model. Governments in the US and Australia are likewise planning substantial increases in defense spending across the next decade. At the close of 2025, the group's defense backlog was €3.5 billion, which included our recently secured role in a major 10-year collaborative contract for the German Armed Forces in Hamburg, with a total project value of €1 billion. Our North American civil business, FlatironDragados, was selected as one of the companies for a 10-year construction contract for the US Air Force Civil Engineer Center. Other projects include building a major dry dock at Pearl Harbor for the US Navy, works for the Royal Australian Air Force base in Queensland, and defense infrastructure upgrades in Australia.

Juan Santamaría Cases

executive
#10

When it comes to biopharma, health, and social infrastructure, we keep leading positions, and we've booked a number of significant new orders. First, the New York Public Health Laboratory, which brings the largest and most advanced state public health laboratory in the US together under one roof; the Regional One Health hospital campus, a once-in-a-generation investment to expand critical services and strengthen community access to care in Memphis; the Philadelphia Arena, including construction management for the new state-of-the-art arena in the South Philadelphia Sports Complex; and two major building contracts in Germany: a hospital new-build project in Flensburg, the first one in Germany using integrated project delivery, and a PPP project for a research and administration building in Kiel. Finally, the group is also a global leader in transport and sustainable infrastructure, with a very positive outlook driven by several infrastructure stimulus packages. In Australia, we were awarded the Perth Airport new runway construction, as well as the Queensland Gateway to Bruce upgrade. We secured the A59/A40 highway upgrade in Duisburg, Germany. Recently, we won the Battery Park resilience project, a $1.7 billion construction in New York. In Sweden, we secured a €1 billion high-speed rail project under collaborative model delivery, part of the East Link program.

Juan Santamaría Cases

executive
#11

Now let's look at how each segment performed. Turning to slide 10, we start with Turner, and the results there are exceptional, with the company strengthening its leadership position in strategic sectors. Sales rose 33.9% to €25.8 billion, driven primarily by organic growth in data center projects, along with solid gains in areas including healthcare, education, sports, and airports. That strong performance also got a boost from Dornan's contribution, with Dornan's own results exceptionally up 70% for the year. Profit before tax climbed to €921 million, an outstanding gain of more than 61%. Continued margin expansion of roughly 80 basis points to 3.6% supported this, reflecting Turner's successful strategy of focusing on advanced technology projects, which aligns with the group's strategic objectives. Net operating cash flow rose by €523 million, reaching an exceptional €1.2 billion. Net cash stood at €3.3 billion as of December '25, an increase of €179 million, even after the Dornan acquisition. Turner's commercial strength shows in its new orders of €33.6 billion for the year, up 44.2% FX-adjusted, which pushed order backlog to a record €37.7 billion. Moving to our operations in the Asia-Pacific region, we come to CIMIC, where sales posted strong growth in strategic areas such as advanced technology, healthcare, and defense, coming in 11.2% higher, helped by full consolidation of Thiess and despite the winding down of large transport infrastructure projects.

Juan Santamaría Cases

executive
#12

EBITDA margins expanded by roughly 30 basis points, driven by a robust contribution from high-tech jobs at both UGL and Leighton Asia. Ordinary profit before tax rose 12.3% year-on-year on an FX-adjusted basis, reaching €473 million. Attributable net profit was up 1.4% year-on-year FX-adjusted. Net operating cash flow before factoring increased by €43 million, which supported a strong €366 million improvement in net cash, and that figure also takes in the divestment of 50% of UGL Transport along with the data center project. Our order backlog remained solid, hitting €21.8 billion, a 6% rise year-on-year adjusted on a comparable basis. New orders climbed 5.6% FX-adjusted, with especially strong growth in data centers, defense, and critical minerals. Moving now to the Engineering & Construction segment on slide 12, we see solid growth there, with consolidated sales up 15.1% year-on-year FX-adjusted to more than €10.6 billion, powered by strong performance in North America and robust contributions from both Dragados and HOCHTIEF Engineering and Construction. The EBITDA margin rose 53 basis points to 5.9%, helped by a significant contribution from FlatironDragados. Ordinary profit before tax increased significantly, up 45.2% FX-adjusted to €275 million, along with strong cash conversion as the net cash position rose €118 million. Engineering & Construction backlog grew 10% FX-adjusted to €30.1 billion, reflecting strong order intake of €13.6 billion, with notable momentum in sustainable mobility and transportation infrastructure.

Juan Santamaría Cases

executive
#13

When we look forward, the outlook is still quite favorable, and as I mentioned, we're especially well placed to gain from Germany's infrastructure investment plan. Moving on to the Infrastructure segment on slide 13, Iridium's sales rose 45%, thanks to the extra contribution from the A13, the financial close of the SR 400 in Georgia, and generally positive performance across operating entities. Also, as you may be aware, we were recently pre-qualified for the I-77 in North Carolina. That comes on top of the two earlier pre-qualifications, for the I-285 in Georgia and the I-24 in Tennessee. Abertis' recurring business grew by more than 6%. Its entire financial contribution was affected by non-operating results. Abertis paid out a dividend of roughly €600 million in the second quarter of 2025. On the following slide, we offer for your reference a breakdown of invested capital and valuation as of December '25 for the portfolio of all assets across our greenfield platforms. Among other things, we now include an evaluation of our stake in the data center platform, along with the average value that research analysts assign to our SR 400 project. On the next slide, we examine the Abertis numbers in more detail.

Juan Santamaría Cases

executive
#14

Traffic was up 2.1%, helped along by how well heavy vehicle traffic did, and we posted strong results, especially in Spain, Chile, and France. Looking at like-for-like figures, the company achieved solid growth in revenue and EBITDA — 4.5% and 6.2%, respectively — driven by the portfolio's geographical diversification and tariffs tied to inflation. Turning to portfolio development, Abertis picked up a 51.2% stake in the A63 toll road in France. Beyond that, Abertis won a 21-year extension plus a tariff adjustment at Fluminense, and it bought the remaining 49.9% stake in Túneles de Vallvidrera and Cadí. Over in Chile, the Santiago-Los Vilos concession started operating. Abertis has strengthened its liquidity and financial position, with net debt at €22.7 billion. On slide 16, we lay out the key figures broken down by country for Abertis' portfolio. Then, as we do each year, we set aside a short section to walk through some strategic updates. This slide shows how we're progressing across our strategic growth verticals, from both a developer and a contractor standpoint. We've already covered a lot of these key milestones on earlier slides, so let me run through the main points quickly. In digital and tech, we remain a leader in data centers. The backlog has expanded at roughly 70% CAGR over the last 3 years.

Juan Santamaría Cases

executive
#15

A few notable awards have come in lately — including the 1-gigawatt project for Meta in Indiana, which we announced just a few weeks back. As a developer, every one of our data center platform sites is now connected to the grid, and roughly 80% of the power supply is already secured. We're in advanced talks on lease agreements covering 150 megawatts of IT to start with, and the goal is to sign that first lease during the first half of the year. On the defense side, we remain on track to hit the 2030 revenue ambition of €10 billion, powered by major wins such as the German Armed Forces campus and the long-term contract for the US Air Force. Critical metals is another area where we're making strong progress. We acquired an engineering company in the US not long ago. On top of that, our stake in Vulcan marks another key strategic step. Finally, let me reiterate the delivery partner role our consortium holds with Amentum on the Rolls-Royce nuclear SMR program. Taken together, these wins show decisive progress in strengthening our end-to-end leadership and capitalizing on our investment opportunities. Turning to slide 19, we examine more closely what the outlook holds for AI-driven data center growth. ACS is well positioned to gain from growing investment in data center infrastructure, supported by durable structural demand. Market fundamentals keep accelerating, and hyperscaler demand gives us multi-billion, multi-year visibility.

Juan Santamaría Cases

executive
#16

Worldwide data center intake for '25 has grown to over twice what it was, reaching €17 billion. And lastly, the AI revolution isn't just making our backlog and growth prospects stronger — it's sharpening our core capabilities and creating fresh growth avenues for ACS too. Before we get to the conclusion, this slide carries a straightforward but potent point: in 2025 we've already hit the key 2024 CMD goals we set for '26, coming in 1 year early. Both revenue and NPAT have met or gone beyond the targets we laid out for 2026, and the net operating cash flow produced between '24 and '25 is already above the target for the entire 3-year period. To wrap up our look at the full-year 2025 results, allow me to point out the group's main achievements. First, we turned in a strong operational performance, with sales of €49.8 billion, a rise of 19.7% year-on-year, and ordinary net profit of €857 million, up 25.3% and above the top end of our guidance. The group showed outstanding cash generation, posting net operating cash flow of €2.2 billion, which in turn backed net financial investments of €1.7 billion. Our order backlog sits at a record high of €92.9 billion, supported by €62.5 billion in new orders, up 26.9% FX-adjusted, which includes €17.6 billion in digital infra order intake.

Juan Santamaría Cases

executive
#17

I also want to call attention to how our data center development platform is advancing. Working alongside BlackRock's GIP to build out over 1.7 gigawatt across the globe marked a significant step forward, and it underscored our leadership position in one of the world's fastest-expanding markets. Lastly, we have strong confidence in our capacity to keep carrying out the strategy that has served us well. For '26, our ordinary net profit growth target is set at 20% to 25%, reaching as much as €1 billion 70 million. As we look toward 2026 and the years after, our focus stays on strategic growth markets and on allocating capital with discipline. As we've discussed, we see considerable opportunities for infrastructure investment and we keep pursuing bolt-on acquisitions to bolster our engineering capabilities along with our long-term growth prospects. We are well positioned to keep delivering sustainable growth and attractive shareholder return. Thank you once more for being with us today, and we now look forward to taking your questions.

Luis Prieto

analyst
#18

Hi, this is Luis Prieto with Kepler Cheuvreux. If I may, I'd like to ask three questions, please. First, given that share prices for both stocks have performed beautifully, I wanted to ask how tempting it might be for you to possibly trim the stake in Turner by way of a listing, so as to upstream money and fund development and investments at the ACS level, or, for instance, to make a reduction in the HOCHTIEF stake with that same aim and boost investments? Second, we were noticing the same assets held for sale on the energy balance sheet. They've been sitting there for some time now. Is there any update on how those disposals are progressing and when we should expect outcomes or news? Finally, going back to something you mentioned earlier, you have visibility in your order book until some point in 2028, but you refer to a pipeline beyond that, which is clearly essential to support the valuations and the earnings expectations you have for data centers. Could you give us an order of magnitude for that pipeline beyond the order book that you might have across the period from today to 2030?

Luis Prieto

analyst
#19

Appreciate it.

Juan Santamaría Cases

executive
#20

Thanks a lot, Luis. I'll begin. At this point we have no intention of cutting our stake in Turner, nor of trimming HOCHTIEF. Let me use this opportunity to discuss how we view the valuation of our share. I'll go back to our Investors Day late last year. There are two main businesses, correct? One is what you can see through our EBITDA, and it's underpinned by Turner's growth, by our future growth in Germany and at HOCHTIEF, and by how CIMIC is performing. Without going into too many specifics, what we observe comes down to two main things: a Turner that keeps expanding, a Turner that pre-2020 was producing €350 million in PBT and this year has delivered €1.45 billion, yet with guidance of as much as 30%, which would be roughly €1.34 billion in '26, which we regard as very conservative, right? The reason we can't raise it is clearly that we're factoring in a great deal of the planning. We depend on hyperscalers, we depend on clients, and we're in that planning mode, and we need to settle on something before arriving at a resolution. And the US dollars, under all our assumptions, imply it will keep going in the not evaluation mode.

Juan Santamaría Cases

executive
#21

So that's really about the business, correct? Look, Turner has grown roughly 3.5 times over just a few years, and we expect that to keep expanding along a very meaningful trajectory. It didn't just post 70% growth in US dollars in '25 — we're already guiding to 30% — and we think Turner can double. The open question is over how many years, though certainly within a reasonably short- to medium-term window. And then there are Turner's multiples, right? A big chunk of Turner's backlog sits in data centers. Our peers in the data center arena, we're seeing, trade at over 30 times EBITDA — anywhere from 20 to more than 30 times. Turner's average consensus is far under that, right? The remainder of Turner's business runs through semiconductors, batteries, biopharma, and other sectors that should keep delivering margin improvement. For data centers, we provided a target for Turner of hitting revenue in data centers alone of roughly $25 billion by 2030. That's the business, right? Beyond that, we see Germany growing, defense growing, and we haven't factored in any of the verticals we're working on at present, since we think the true value will show up over the medium to long term: nuclear, critical metals, and so on.

Juan Santamaría Cases

executive
#22

On the share price and how the market values it, our view is this. What isn't being captured in the share, for clear reasons, are the assets, since those don't show up in EBITDA. Much of what we're doing at present involves putting money into the assets, correct? The data center platform — the Edged data center platform, on top of the large one with BlackRock — greenfield, Abertis growth, and not just Abertis growth through inorganic M&A, but the organic M&A plus the renegotiations on many of the contracts, where we'll give some visibility this year, right? Then there's what we're doing in critical metals, industrial, energy, and so on. Our belief is that the share will keep reflecting the value of all of that. At this moment we aren't adopting the position that now is the right moment to sell anything, basically. Second, assets held for sale. The reality is that a set of facts comes together here, right? First, on a net cash flow basis, in the capital markets the figure always discussed was roughly €1.5 billion of net operating cash flow. After dividends — €600 million in dividends, or shareholder remuneration — we were left with €900 million net for acquisitions, basically, or investments. Well, that 1.5 has turned out to be 2.2 this year, and 2.1 last year.

Juan Santamaría Cases

executive
#23

So really, we're looking at €1.4 to €1.5 billion of firepower annually, net of shareholders' remuneration, correct? Multiply that by 5 between now and 2030, and you get substantial capacity for investments. There's also an aesthetic dimension — we're not in any great rush to divest certain industrial assets. On top of that, we want to be sure they perform the right way so value is maximized, right? So it's a mix of both. Then, your third question concerned the pipeline on and beyond. As you saw on the screen, our backlog stands at close to €93 billion. The majority of our projects — and this really is the strategy shift of the last 4 years, going from being a commodity in construction to an end-to-end service provider — the majority of our contracts are not low-price lump sum RFPs. They arrive following a lengthy negotiating process: design, planning, and collaborating with our clients. Roughly €25 billion is not reflected in the backlog, yet we're actively working on it with our clients. Of that €25 billion, €18 billion sits in Turner — approximately $22 billion in US dollars at Turner — and of that, slightly more than half relates to data centers.

Juan Santamaría Cases

executive
#24

Every one of those factors plays into how visible we are over the medium term and how confident we feel about the guidance we might give. We think the outlook is conservative not just at HOCHTIEF but at ACS as well, though we still need to watch how a lot of these projects land and when they do land. Thank you.

Álvaro Lenze

analyst
#25

Hello, Álvaro Lenze here, calling from Alantra Equities. I appreciate you taking my questions. My first one concerns Turner. You reported net cash of more than 3 billion, as I see it. I'm simply wondering if Turner truly requires that much cash to run its operations, and what your approach might be regarding business units cross-financing one another, or potentially shifting cash flow up to headquarters later on — I just want to grasp whether the group net cash figure you report is entirely accessible for investments. My second question relates to the timing and size of the new cycles. I'm curious whether you think areas such as defense, nuclear reactors, or critical minerals could eventually grow as large as the data center investment cycle is probably going to be, or whether they're simply long-term in nature, though likely more spread out and smaller than what's currently being invested. Thank you.

Juan Santamaría Cases

executive
#26

Thank you. Let's begin with Turner. There are two reasons why Turner carries so much cash and why we aren't pulling it out of Turner. The first is bonding requirements, correct? To operate, Turner is hitting $30 billion US dollars in revenues just within the US, and that calls for bonding and calls for security and making sure the right collateral and indemnity are in place in the US. That is a major factor behind keeping that cash at Turner. Obviously it's well above what they need. The other thing is, for us it's very important that Turner keeps growing. For Turner to keep growing, there are a few strategies that we're going to put in place. The first one is we need to keep adding engineering capabilities to Turner, number one. The good thing is that right now with AI you can escalate that very, very fast, but it will require some investments. The other one is the modularization strategy at Turner, because that's the future construction. There are additional investments that we're going to be doing in that space. Let's preserve the cash, because Turner will need some of that for investments to keep growing. The good thing about Turner is what they have demonstrated with Dornan is that they can multiply by three the value of one company in almost a year, right?

Juan Santamaría Cases

executive
#27

We feel very good about that being an excellent spot to put capital to work. Your next question concerned the new cycle. Let's take them one at a time. Nuclear: sure, nuclear will resemble data centers, though over a longer horizon, correct? We don't anticipate seeing it yet, but if we aim to be there for the long haul and build another cycle comparable to data centers, we have to wait, right? It's a long-term matter. It's heavily high-tech oriented. A great deal of engineering is required, and you must be developing that piece from the very start, correct? It's a long-term matter. Probably nothing will show up in the P&L in the near term, but certainly we are generating plenty of value. Nuclear is a highly important piece of what's ahead, not only for AI but for energy globally. Defense: so with defense, two outcomes are possible. The first is that we retain a Defense 1.0, which is essentially infrastructure, and we expect that to keep expanding, right? The €800 billion from Germany begins being allocated. Last year they spent €74 billion. For 2026 we're expecting €127 billion?, but they start allocating. You begin to see that. HOCHTIEF has doubled, not tripled, its backlog and will keep growing on the back of that.

Juan Santamaría Cases

executive
#28

Australia’s the same story. We still have to watch how several of the UK, US and Australia initiatives over there actually unfold. As I understand it, they’re putting $40 billion in over the next 5 years, though that money hasn’t been assigned yet. Then there’s North America, where we keep going. Now, Infrastructure 1.0 won’t create a cycle the way data centers do, correct? It lets us grow at a very solid pace, but unless we move into Defense 2.0, it won’t be a data center cycle. That’s something—without going into the more radical side of defense, but the dual-use technology—that we’re studying, and no decision has been made yet. It’s simple for us since we handle the infrastructure and clients ask for full integration, not merely the civil building piece, but we’re looking at what to do there. Critical metals: I really believe it can be a solid cycle. I won’t go so far as to call it as good as data centers. Right now it largely hinges on the US rare earth initiatives and how serious they are—a very important part. Plenty of the copper projects in South America that are about to get started, we’ll be tracking, and then obviously lithium and battery development, right?

Juan Santamaría Cases

executive
#29

It all hinges on those three variables, so it could turn into a really strong cycle too. At the moment, that isn't showing up on our balance sheet, and the reason is that what we're doing at this stage is pure engineering. After the engineering work is finished, we move into the PCM portion of it — that's where the revenues and the EBITDA sit, not in engineering. That's the piece not reflected in our P&L.

Álvaro Navarro

analyst
#30

Hi, Álvaro Navarro from Bestinver, and I have two questions for you. My first concerns the dividend policy. Given the strong results that were released and, on top of that, HOCHTIEF raising its dividend by 26%, are you thinking about revisiting your dividend policy and lifting it above the roughly €2 per share level at present? My second question is about Thiess. I believe that this year you have the option to exercise the put option over the remaining 40%. Is that a possibility, or are you looking at other alternatives? Thank you.

Juan Santamaría Cases

executive
#31

Thank you, Álvaro. Let's begin with dividend policy. We've always taken pride in being a yield plus growth company, correct? We provide both of those. The yield side, since historically our dividend policy has consistently been quite strong. On growth, because at present we're across every vertical with high growth and high tech, and we want to ensure we capitalize on being or becoming a leader in those verticals. That's the reason we remain cautious regarding the dividend policy. That said, it's true we're growing a lot, and yes there is cash available, we haven't reached any conclusion, but most likely we will raise our dividend policy above the €2 per share this year. As to how much, we are analyzing. Regarding Thiess, we cannot execute the put until the end of this year 2026, with the cash flow being paid in January '27. If an opportunity existed to acquire in advance, we would take it, but that doesn't depend on us; it depends on our partner. Hi Juan, this is Víctor from Bestinver. Congratulations on the results. I have three questions. The first concerns CIMIC. When do you expect a rebound in cash flows at CIMIC following the de-risking of the backlog?

Juan Santamaría Cases

executive
#32

The second item is this: at year-end, can you confirm a Capital Market Day to give 3 years of guidance for the group? And lastly, what are your expectations regarding the Alcalá de Henares data centers to be commissioned in the half of the year, and the initial conversations — how do you feel about that? Thank you. Let me start with CIMIC. What's going on at CIMIC — and this is the difference compared with North America, Europe, and the other geographies — is that many high-tech projects, energy projects, and industrial projects are taking the place of civil and more traditional projects, right? A lot of the additional backlog we're building in Europe sits on top of the civil work, which hasn't been reduced. When it comes to North America, when it comes to Turner, residential has disappeared. Commercial office space has fallen significantly over the last 4 years. The high-tech segment is so big, and advanced technology, which right now accounts for 60% of Turner's backlog, has replaced part of the old market, but has exceeded it well in advance and above. As for CIMIC, New South Wales, Victoria, and Queensland have significantly, tremendously reduced the amount of expenditure on transport and civil, right, which were the big jobs.

Juan Santamaría Cases

executive
#33

WestConnex is wrapping up, Cross River Rail is wrapping up, every one of the WestConnex schemes, Northwest Rail, the Western Sydney project, all those rail level crossing programs across Victoria, and so forth, correct? Every single one of them has finished. Each of those jobs was worth something like $5 billion. Right? It's really hard to swap them for transmission lines, substations, energy plants, renewables, data centers, that whole pipeline. The trouble is we're expanding, and in all of those areas, Sedgman, UGL, Leighton Asia, they're expanding substantially, even Thiess, though not enough to fill the gap those projects leave. On top of that, those projects are collaborative in nature. They don't carry large advance payments. As we bring those projects to completion right now, we've been giving back the 10% advance payment we received 5 years ago, and we're largely spending it at this point. You can see that cash unwinding at CIMIC without new projects taking its place, correct? That's the crux of it. Eventually, of course, those projects will be finished, and we're not far off. Out of nine, only two remain, right? That's a very good spot to be in. It'll come soon. Will it land in '26 or '27? We'll see.

Juan Santamaría Cases

executive
#34

So, regarding the Capital Markets Day — yes, we will hold a Capital Markets Day similar to the one in '24, not the Investors Day we held at the end of last year. We have not confirmed the date yet. Please don't hold me to the month — most likely the end of October — but eventually it will be confirmed. Then, on Alcalá de Henares, I'd like to take this opportunity to give an update on the data center platform, okay? Alcalá de Henares, which is roughly 20 megawatts utility, around 14 IT megawatts, will be commercialized and in operations — or at least service will commence operations — before the end of the year, Alcalá. We will have an additional 250 megawatts IT commercialized before the end of the year, probably in North America, with construction beginning. I think that is a reasonable number. Obviously, only those, once commercialized, will justify in excess of the value of the price our partner paid for the platform.

Ángel García Altozano

executive
#35

Thanks. We've reached the point where questions can come from the other side. Let's begin, since a number of analysts and investors have requested clarification on the guidance. On that guidance, first, are we assuming a stable dollar exchange rate, or a weaker dollar, or what? Also on the guidance, what about free cash flow? Operating free cash flow has come in significantly higher. Marcin Wojtal from BofA is asking whether that €1.5 billion of free cash flow per annum might be on the low side and whether we could raise it.

Juan Santamaría Cases

executive
#36

Regarding the US dollar devaluation, our guidance is conservative partly because we're assuming the US dollar keeps weakening. Our guidance for the year reflects that. At this stage, that's the most logical and reasonable assumption. On free cash flow, we'd rather be prudent. It's true that at the Capital Markets Day we talked about €1.5 billion, which ended up being 2.1 and 2.2 respectively. If the market keeps growing, those are the levels we can expect. All our plan, all our capital allocation, all our firepower is based on €1.5 billion, right, to make sure — because we also want a more conservative approach to factoring, to confirming, to debt. We want to make sure we're cautious in keeping our cash flow as clean as possible. Basically, I don't dare to give a forecast about net operating cash flow. Obviously growth typically drives high net operating cash flows, but again, our firepower is based on a lower amount, the 1.5.

Ángel García Altozano

executive
#37

On that point, we've had some inquiries concerning how we allocate capital, particularly regarding the infrastructure assets. Specifically, Dario Maglione from BNP Paribas is asking for an update on where SR 400 stands — the project, that managed lane in Atlanta — and also for an overview of our capital allocation strategy for these particular assets.

Juan Santamaría Cases

executive
#38

Let me take you back to our Investor Day at the end of last year. Suppose we manage to bring in €1.5 billion. And again, we're well beyond that already, but every projection we've made was built on that assumption. After shareholders' remuneration, we'd be left with a net figure of €900 million. Between now and 2030, multiply that by 5, and you get €4.5 billion. Then, from the 3 billion — the 2 to 3 billion in non-core assets we said at our Capital Markets Day in 2024 that we could divest — we've already sold 1.5, so €1.5 billion remains. Add it all up and it comes to €6 billion. So what's our plan for that €6 billion? There's upside, since this year alone we saw €700 million of upside on top of that amount. First, we intend to invest in greenfield projects and managed lanes. So, 400 — we were pre-qualified on the 285 in Georgia, pre-qualified on the I-24 in Tennessee, and recently pre-qualified on the I-77 in North Carolina. Two projects remain: the 285 West in Georgia, and the other one in Virginia. That's a significant piece. The other piece is data centers.

Juan Santamaría Cases

executive
#39

Our initial platform is the one we signed with BlackRock GIP — the Edged data center platform — and we do hold assets, sizable assets, from that first platform, and we're working on them to lock in the power and to push toward commercialization. We're also examining other opportunities, such as in critical metals, similar to what we did with Vulcan in Europe, along with other possible opportunities in critical metals, and in the energy space as well. A significant portion of that will be directed to greenfield. There's another €1.5 billion that in all likelihood will be allocated to M&A. That M&A could bring in Abertis, and it could bring bolt-on acquisitions for some of the things I mentioned earlier, to strengthen Turner engineering and our capabilities. Broadly speaking, we feel comfortable with the capital allocation.

Ángel García Altozano

executive
#40

Marcin from BofA also has a question about Abertis. For the coming 5 to 10 years, would you view the €600 million yearly dividend from Abertis as sustainable? And what's your thinking on Abertis' strategy?

Juan Santamaría Cases

executive
#41

Assuming the plan unfolds as expected, we anticipate being able to present a really clear view of the organization. Let me return to some figures for Abertis. In 2018, Abertis's EBITDA stood at roughly €3.5 billion, though we shed €1 billion from PPPs that reached expiry — correct? So essentially that left €2.5 billion. This year, EBITDA comes to €4.4 billion. Looking past France, our current prospects range from 4.4 to €4.9 billion once Sanef is included, right? If you examine certain ratios — and I believe we've shared some of them previously — the ratio of net debt to EBITDA has moved, I think, from 6.6 down to 5.2, a number we provided. Backlog EBITDA against net debt has risen from 3.4 to 5.8, correct? That offers a sense of how we've been running Abertis over recent years. What matters most at Abertis is that three things are underway at present — or rather two: renegotiating additional contracts, and we'll show transparency this year around very significant gains in Abertis's overall EBITDA stemming from those renegotiations, plus a couple of deals we're actively pursuing with Abertis.

Juan Santamaría Cases

executive
#42

We’re hopeful that these deals—taken together—will provide sufficient visibility, not only for the market but also for the rating agencies. Our ratio of FFO to net debt has been climbing from 7 to very high levels, and that’s the key constraint on dividend distributions. We expect it to be unlocked, and for us to return to normal dividends. That, yes, will confirm not only that €600 million is sustainable on time, but that we’ll have growth going forward, and it will significantly increase the valuation of Abertis, which right now is like the ugly duck for all the analysts, right? That will be a nice one eventually.

Ángel García Altozano

executive
#43

I'll shift gears here. Graham Hunt from Jefferies wants to know about the conditions in the data centers market, what sort of competitive landscape you're running into as you evaluate further opportunities to develop data centers. Are there regional differences you're noticing — Europe, Australia, or the US market, naturally? Where do we stand on that? And how can we stay as competitive as we've been showing ourselves to be?

Juan Santamaría Cases

executive
#44

There are various ways to answer that question, and it's a really important subject. Broadly speaking, we keep witnessing enormous levels of investment. We're seeing very significant capex commitments. Even more crucially, the hyperscalers — since they must plan 3 to 5 years out — are providing a great deal of visibility into what lies ahead. Out of the $420 billion spent on data centers in '24, they collectively expect to hit $1.1 trillion annually by '29, correct? Those are the sorts of figures we're dealing with in this market. There are pluses and minuses when it comes to competitiveness, correct? On the plus side, we currently believe we're more competitive than previously, since in the past, for each 20-megawatt data center, we faced 14 consortiums bidding. At 2 gigawatts to 4 gigawatts, there's no competition, correct? Competition is minimal. It's closer to open book — the hyperscalers know precisely what these things cost and what competitive pricing looks like, correct? They don't have to run long-term RFPs; for them that's a waste of time, correct? What we must ensure is that we compete against ourselves and against what hyperscalers are capable of, which sets the bar — and that's a very high bar, incidentally, because their capabilities are tremendous.

Juan Santamaría Cases

executive
#45

They could handle it on their own. When they bring in us or a different contractor, that's typically because they aren't able to match or beat what we can deliver — correct? That's one element. Conversely, what we observe is that timing matters greatly, and with each passing year it matters even more. What hyperscalers are looking for is a massive shortening of the construction timeline for these data centers. That's the reason we're putting money into modular construction, and that's the reason we keep extending the timing, which in turn makes us more competitive. Regarding the US compared with Europe and Australia — these are entirely distinct markets. The US is shaped by the fact that it's an AI superpower, that the models are being trained there, that they hold every form of data storage, and that most American firms dominate globally when it comes to data — correct? That's the reason you're seeing 2 gigawatts, 4 gigawatts; anything you do in the US gets commercialized very quickly — right? There's an enormous, highly liquid market for this, from hyperscalers but also mid-sized firms and small firms. There's plenty of AI processing inference, plenty of AI training, plenty of data storage, and there's a race to become the most powerful data storage hyperscaler.

Juan Santamaría Cases

executive
#46

Europe is extremely sluggish. The reason Europe is so sluggish is that at present people are arguing over what a data center is able to deliver, and direct versus indirect value never line up neatly. On the direct side: you invariably get a mix of heavy energy use, heavy water use, and few jobs. On the indirect side, whenever you have megawatts of AI processing, inference, or an ecosystem, you end up building a massive startup ecosystem around data centers. Take Virginia — when it reached 2.7 to 2.4-gigawatt capacity, I believe roughly 10, they generated 10,000 new startups as a result. Even a number of the large US corporations relocated to Virginia. The same pattern appears elsewhere. Ireland saw something comparable. Add to that tax incentives from a few years back. You're going to witness that across Europe. An increasing number of countries now view data centers as strategic national investments. Reaching that conclusion takes time, correct? On top of that, it gives you warning, which slows things down somewhat. They will arrive. That said, Europe is not yet training AI models. Europe does not yet have large hyperscalers. It's mainly the American ones putting money into Europe. Power in Europe is heavily intervened in and carries certain restrictions, varying from country to country, though along the same lines, right?

Juan Santamaría Cases

executive
#47

That won’t really support building additional data centers over the near term. It’s going to happen—not on a large scale, but it definitely will—and the industry is going to move into Europe. In Asia-Pacific, we’ve witnessed strong growth, though clearly, apart from China—and I’m setting China aside for the moment—they aren’t training large AI models, and they lack that storage capacity, but Leighton Asia has certainly been very active. Of the backlog we have right now, roughly 2 billion sits in Asia-Pacific alone, excluding Australia. Then there’s Australia: movement into data centers is slow, but we are seeing the country make progress toward data centers.

Ángel García Altozano

executive
#48

So in that sense, Dario Maglione is asking about the outlook for data centers in Spain. He asks, given that we plan to have roughly 800 megawatts of data centers through our JV platform by 2032, how strong is demand for data centers in Spain? Is it enough to absorb this amount?

Juan Santamaría Cases

executive
#49

It could well be. What I believe will occur in Spain is that the hyperscalers will initially merge their requirements into the projects they already have underway. After they move past that point, they'll begin seeking extra capacity, and that's when a great deal of that surplus capacity will get taken up at scale. I'm not referring to our own capacity; I mean Spain as a country overall, correct? There's demand from mid-sized firms that currently aren't building anything themselves, yet they're searching for available data center megawatts. My view is that the constraint isn't really on the demand side; the constraint sits more with power. When we talk about AI or inference demand, that's a different matter, right? Since that represents a more distinctive energy requirement. It isn't like plain data storage; it's more tied to inference and more tied to AI processing. I believe that will require more time in Spain compared with the rest of Europe or the US.

Ángel García Altozano

executive
#50

We have final questions from Filipe Leite at CaixaBank BPI. On the platform — the data centers platform — he has two particular questions. The first concerns commercialization: is there any news on commercialization of the data centers for this year? The second is far more technical. He asks why the cash in from the recent agreement with BlackRock GIP is lower than the €500 million we announced, which has been accounted for at €428 million?

Juan Santamaría Cases

executive
#51

I’ll begin with the first item, then I’ll build on it, and I’ll ask Emilio to contribute whatever he thinks should be included. On that first point, I’ve mentioned previously that before 2026 we anticipate having 14 megawatts IT in Spain, which is roughly equivalent to 20 that are commercialized and built. In the US, around 250. My view is those numbers could prove conservative. After that, we’ll keep adding on an annual basis. As for the platform, I think it’s simply the net of inflow against outflow. Emilio, would you like to add anything.

Emilio Grande

executive
#52

Right, that’s correct. The net figure was projected at 500 when we announced the deal last year. It’s a bit under that — the net number, 860 minus 400-something. The sole explanation is the agreement’s terms and the precise investment amount as of the closing date. That accounts for the gap, or the difference, between the 500 and the actual net cash.

Ángel García Altozano

executive
#53

The last question concerns the managed lanes opportunities in the US that you mentioned we're pursuing. Could you explain why the construction structure differs across the different bids compared with what we've done historically, or what makes them differ? What's the reason we have different partners?

Juan Santamaría Cases

executive
#54

No, there are just two consortiums. The primary one involves Meridiam and Acciona — we secured the 400 with them, and we’re pre-qualified on the 285 and on I-24 with them in Georgia and Tennessee, respectively. For North Carolina, Kiewit has long been a customary partner of Flatiron there. On market figures, Kiewit ranks as the biggest civil construction firm in the US. We’re number two. In North Carolina specifically, both of us are extremely strong when leading, and we’ve partnered together traditionally. A few of those discussions happened prior to our Acciona consortium. It’s simply a particular circumstance in North Carolina.

Ángel García Altozano

executive
#55

That wraps up the questions from the web.

Juan Santamaría Cases

executive
#56

Is there anything else? Great. Thanks so much, everybody, for joining us on the call. We’re happy to take any questions you may have as things move forward over the coming days or weeks. Many thanks.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete ACS, Actividades de Construcción y Servicios, S.A. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to ACS, Actividades de Construcción y Servicios, S.A. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in ACS, Actividades de Construcción y Servicios, S.A. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.