Good afternoon, everybody, and thanks for being with us on ACS Group's 2025 First Half Results Call. I'm Javier Crespo, Head of Industry Relations. The call, as always, will be led by our CEO, Juan Santamaría, and joining him here are our Corporate General Manager, Ángel García Altozano, our CFO, Emilio Grande, and the remaining members of the management team. Once the presentation wraps up, we'll hold the customary Q&A session, and we're looking forward to hearing what you ask. Juan, over to you.

Juan Santamaría

executive
#2

Thanks, Javier. Good afternoon, everyone, and I appreciate you joining us today. We delivered a strong performance for the 1st half of the year, with healthy growth in sales, backlog, and net profit, supported by robust cash flow generation. In addition, we are making good progress on carrying out our strategy, increasingly drawing on our global footprint and engineering expertise to drive sustainable growth. We are actively seizing high-potential equity investment opportunities in both traditional and next-generation markets, consistently generating long-term value for all our stakeholders. Allow me to walk you through a few key highlights for the period. Ordinary net profit came in at EUR 392 million, an increase of 17%, or 19.4% FX adjusted. Net profit on a reported basis was EUR 450 million. Sales and EBITDA rose by 28.6% and 23.9% respectively, driven by robust momentum across segments. Operating margins improved across the board. Net operating cash flow, adjusted for factoring variations, amounted to EUR 1.8 billion over the last 12 months. That is up EUR 265 million year-on-year and represents a CAGR of 45.8% for the past four years. Thanks to this strong cash flow generation, the group's net debt position at the end of June stood at EUR 2.2 billion.

Juan Santamaría

executive
#3

That comes after we directed EUR 1.1 billion toward strategic investments and shareholder remuneration during the 1st half. Within strategic investments, we had the EUR 436 million acquisition of Dornan plus EUR 476 million in net equity investments and other M&A, largely consisting of EUR 315 million put into data center projects. Shareholder remuneration, for its part, came to EUR 148 million. New orders in the 1st half totaled EUR 31.7 billion, an 18.1% increase FX adjusted, which works out to a healthy book-to-bill ratio of 1.2 times. Order backlog expanded 12% FX adjusted to EUR 89.3 billion — roughly two years of work — helped by sustained demand in data centers from pharma and defense. Going forward, our confidence in the group's outlook remains very high, and we reiterate the ordinary net profit growth target of up to 17% for 2025, backed by strong fundamentals. Now let's look more closely at the group's consolidated performance for the period. Sales climbed 28.6% to EUR 24.1 billion, powered by the exceptional performance of Turner, which posted 34.1% organic growth, 36.7% FX adjusted, and was driven in particular by digital infrastructure and biopharma projects. That momentum also got a boost from integrating Dornan and from fully consolidating TIS since Q2 2024.

Juan Santamaría

executive
#4

EBITDA rose 23.9% to EUR 1.4 billion, and margins expanded in every segment, holding steady overall because of mixed effects from the businesses. Profit before tax came in at EUR 708 million, a 25.4% increase, driven in particular by Turner's outperformance and the solid contribution from Flatiron. We posted strong net profit growth of 17% year-on-year on a comparable basis, reaching EUR 392 million, which is in line with the top end of our full-year guidance for EBITDA growth. Moving now to the ordinary net profit split, I want to highlight the following points. Turner turned in an outstanding performance, with its contribution climbing 64% to EUR 227 million, powered by strong growth in high-tech markets and biopharma. CIMIC contributed EUR 101 million, helped by strong growth in data centers and affected by FX effects. Engineering and construction posted a very strong result, growing 21.4% year-on-year, which reflects a higher contribution from Flatiron and solid results in HOCHTIEF Europe. Infrastructure showed resilient operational performance during the period, despite the known operational impacts at Abertis and ramp-up effects at Iridium. In the period, the group put efficiency measures in place that involved EUR 16 million in restructuring costs, aimed at streamlining operations and unlocking synergies that will improve performance in the years ahead.

Juan Santamaría

executive
#5

Slide 5 emphasizes how strongly and steadily the group generates cash. Over the last 12 months, net operating cash flow, once factoring variations are adjusted for, came to EUR 1.8 billion — an increase of EUR 265 million — helped along by Turner's powerful momentum. Across the past four years, net operating cash flow on a last-12-months basis, after factoring, has risen steadily at a CAGR of 45.8%, propelled by EBITDA growth, sustained cash conversion, and diversification of expertise into businesses that generate cash. Measured on a half-year basis, cash flow shows the usual seasonality of the 1st quarter. The group's cash generation is still solid, and we expect a seasonal rebound, as always, during the 2nd half of the year, fueled by strong operational performance. Our net debt position at June 2025 was EUR 2.2 billion, an increase of roughly EUR 600 million compared with June 2024. That change stems mainly from expertise capital allocation initiatives and foreign exchange effects, and it gains from the group's strong net operating cash flow, with a slight impact from reduced use of factoring. The present position reflects these key uses of capital over the last 12 months: EUR 1.2 billion in net equity investments and M&A, including the Dornan Engineering acquisition, a further stake in HOCHTIEF, and targeted investments mainly in data centers.

Juan Santamaría

executive
#6

Shareholder remuneration came to EUR 652 million, with EUR 317 million tied to FX movements and other effects. Our disciplined approach to deploying capital underpins our long-term growth strategy while keeping financial positions solid. Turning to slide seven, our order backlog was EUR 89.3 billion as of June 2025, an increase of roughly 12% year-on-year on an FX-adjusted basis. That growth was supported by very strong order intake of EUR 31.7 billion, up 15.3%, or 18.1% FX adjusted, giving a healthy 1st half book-to-bill ratio of 1.2 times. This very positive performance shows the group's continued success in winning high-quality projects across strategic growth markets, especially in data centers, defense, and biopharma. Notably, digital infrastructure now makes up 14% of our total backlog, fueled by the exceptional momentum in data centers, which have grown at a CAGR of 98% over the past two years. We're also seeing strong traction in Germany, where our positioning let us benefit from the country's increased focus on infrastructure investments. New awards in Germany rose by approximately 40% year-on-year in the 1st half, reinforcing our ability to capture opportunities in these key markets. On the following slide, we can see a selection of recent awards.

Juan Santamaría

executive
#7

A few key projects worth calling out are in digital and advanced technology. As you know, for Made in Louisiana we'll be constructing a large data center — part of the biggest campus the company has had to date — with a total value of $10 billion. We'll also be building a high-density, liquid cooling-ready data center in Malaysia. And quite recently, we announced that we'll lead construction of a state-of-the-art data center in Pennsylvania for CoreWeave, the AI hyperscaler, as part of a $6 billion investment supporting cutting-edge AI workloads. On the energy side, we've been appointed to the Darwin LNG life extension, ensuring gas processing and marine loading service continue in Australia's Northern Territory. In Germany, we landed a planning contract for four advanced onshore converter stations, which form part of a high-voltage line carrying wind power from the north to the Ruhr region. In biopharma health and social infrastructure, we were awarded a new Danelan Hospital in New Zealand — our largest hospital project to date. We also picked up two major building contracts in Germany: a research center for the University of Duisburg-Essen and the conversion of a historic boiler house in Krefeld into a modern event venue.

Juan Santamaría

executive
#8

Just today, we announced that the Turner joint venture was awarded a $700 million modernization project for Memphis International Airport. When it comes to transport infrastructure and sustainable mobility, we won a Long Bridge Northern Rail project in Washington, D.C. Over in Germany, we landed two major rail infrastructure contracts: one covers refurbishing the 42 km double-track section for Deutsche Bahn, and the other involves building the 2nd main line of Munich's S-Bahn network, linking Ostbahnhof and Marienhof stations. Turning to critical metals and natural resources, Sedgman is heading up design and construction of the Queensland Resources Common User Facility in Townsville — a government-backed initiative aimed at speeding up vanadium and other critical minerals processing. We were also awarded a five-year extension at the Karlawinda Gold Mine in Western Australia. On the defense side, beyond the large Pearl Harbor dry dock replacement project in Hawaii that we're working on, it's worth noting that we are leading the state's two upgrades of maintenance, logistics, and airfield infrastructure at the RAAF Base Townsville in Queensland, Australia. Let's now take a look at how the segments performed. On slide 10, we start with Turner, which is delivering exceptional results and consolidating its leadership in strategic sectors.

Juan Santamaría

executive
#9

Revenue rose 41.2%, hitting EUR 12.2 billion, with the main driver being robust organic expansion in digital infrastructure and biopharma projects. That solid result also got a boost from Dornan's contribution, which is doing even better than we expected. Profit before tax came in at EUR 392 million — an outstanding gain of nearly 60%. Alongside that, margins kept expanding, up 36 basis points to 3.2%, which shows Turner's strategy of focusing on advanced technology projects is paying off. Net operating cash flow rose to close to EUR 400 million. Net cash at June 2025 stood at EUR 2.7 billion, nearly EUR 300 million higher even after the Dornan Engineering acquisition. Turner's commercial strength shows in new orders of EUR 16 billion during the 1st half of the year — up 22.7% year-on-year, or 25.1% FX adjusted — which pushed the order backlog to EUR 33.1 billion. Turning to Asia-Pacific operations, let's look at CIMIC. Sales posted strong growth in strategic areas including advanced technology, healthcare, and defense, coming in 26.3% higher, helped by full consolidation of TIS with a stable underlying performance overall. EBITDA margins held steady, supported by a strong contribution from high-tech jobs across both UGL and Leighton Asia.

Juan Santamaría

executive
#10

Ordinary profit before tax rose 20.3% year-on-year to EUR 232 million, once the 1st half of 2024 is adjusted for the one-off non-cash gain net of provisions. On a comparable basis, adjusting for TIS consolidation, ordinary PBT was up 4%. Achievable net profit increased 7.2% FX adjusted year-on-year. Comparable net operating cash flow before factoring is holding steady, whereas the reported figure felt the effect of consolidating TIS globally and lower factoring levels. Our order backlog came in solid, at EUR 23.2 billion at 5% FX adjusted, powered by solid growth in every segment, especially data centers and defense. Moving to the engineering and construction segment on slide 12, solid growth is visible, with consolidated sales up 11.5% year-on-year to more than EUR 5.2 billion, powered by the strong performance in North America and the robust contributions from both Dragados and HOCHTIEF engineering and construction. The EBITDA margin rose 53 basis points to 5.7%, helped by a significant contribution from Flatiron Dragados. Ordinary profit before tax climbed significantly, by 45.6%, to EUR 136 million, helped by a positive financial performance. The net operating cash flow level felt the impact of lower factoring use and a high comparison base from strong collections recorded in the 1st half of 2024.

Juan Santamaría

executive
#11

The backlog for engineering and construction climbed 8.2% on an FX-adjusted basis, reaching EUR 30 billion. That reflects solid order intake of EUR 7.9 billion, with encouraging momentum in sustainable mobility and transportation infrastructure. Also important, our book-to-bill ratio is still robust at roughly 1.2 times. Going forward, the outlook continues to be very positive, and I'd point out that we are especially well-placed to gain from Germany's infrastructure investment plan. Moving on to the infrastructure segment on slide 13. Abertis delivered a strong operating performance. Its contribution to NPAT was affected by modifications to the tax regulation of concessions in France as well as FX movements. Abertis paid a dividend of roughly EUR 600 million in Q2 2025. Iridium, in the meantime, lifted its sales by 26.9%, helped by the extra contribution from the A13 and a broadly positive performance across operating entities. On the following slide, we examine the Abertis figures in more detail. Traffic is up 2.6%, backed by a strong showing in heavy vehicle traffic. We achieved strong results, especially in Spain, France, Brazil, and Chile. On a like-for-like basis, the company posts strong revenues and EBITDA growth of 6%, supported by the geographical diversification of the portfolio and inflation-linked tariffs.

Juan Santamaría

executive
#12

On the Abertis portfolio side, as you're aware, Abertis picked up a 51.2% interest in the A63 toll road in France, and that asset has been fully consolidated since 1st of June, with the balance sheet reflecting the full impact and roughly one month showing up in the P&L. Turning to Chile, the Santiago Los Villas concession has kicked off operational management and full consolidation as of the 1st of April, which further bolsters our footprint in Latin America. Abertis has strengthened both its liquidity and its financial position, with net debt standing at EUR 23.4 billion and group liquidity ample at EUR 6.9 billion. Slide 15 lays out the breakdown of key figures by country for Abertis's profile. To wrap up our look at the 1st half results, let me call out the group's key achievements. We posted a strong operational performance, with sales of EUR 24.1 billion, a rise of 28.6% year-on-year, and ordinary net profit of EUR 392 million, up 17%, or 19.4% FX adjusted, landing at the upper end of our guidance. Cash generation stays robust, with net operating cash flow for the last 12 months, adjusting for factoring variations, plus EUR 1.8 billion, growing at a CAGR of 45.8% across the past four years. Our order backlog sits at EUR 89.3 billion, up circa 12% FX adjusted, backed by EUR 31.7 billion in new orders.

Juan Santamaría

executive
#13

As we look forward, our attention stays on the strategic markets where we aim to grow and on allocating capital with discipline. We identify considerable greenfield investment possibilities, especially in advanced technology infrastructure and managed lanes, and we keep pursuing bolt-on acquisitions that reinforce our engineering capabilities. Via Abertis, we are likewise progressing brownfield investments in core infrastructure assets. We are swathed to build a diversified business model and a global footprint, which enables us to respond effectively to evolving market dynamics. Given solid fundamentals, strong momentum across key markets, and a clear focus on long-term value creation, we're well-positioned to navigate the current macroeconomic environment and continue delivering sustainable growth and attractive shareholder returns. Thank you once again for joining us today. I now look forward to your questions.

Moderator

operator
#14

Ladies and gentlemen, we're beginning the question-and-answer portion at this point. Should you want to pose a question, kindly press star five on your phone's keypad. Thank you. Our initial question is from Luis Prieto of Kepler Cheuvreux. Please proceed with your question.

Luis Prieto

analyst
#15

Good afternoon, and hello, everyone. Many thanks for taking our questions. I have two detailed questions, so apologies for that. First, when I look at the headquarter costs at the EBITDA — the headquarter EBITDA, and therefore inclusive of headquarter costs — I see a positive impact of EUR 41 million in the 1st half of last year, whereas at present I see -EUR 20 million. So I'd like to know whether you can give a bit more detail on why that big swing is there. And the 2nd question: in the results report, you highlighted EUR 14.14 million worth of HOCHTIEF share purchases, I assume in H1. What I would like to know is whether I should assume — or where has that taken place? Is it Q1, Q2? And should I assume there will be no further share purchases at these share price levels for HOCHTIEF going forward? Thank you.

Juan Santamaría

executive
#16

Thanks a lot, Luis. To begin with headquarter cost EBITDA — the EUR 41 million deflation you're seeing comes from unwinding the revaluation of a data center landlord in Australia, which had to be unwound at the ACS level and was sitting in headquarter cost. As for the EUR 14 million figure you noted, that was back in April 2025. Whether we keep going with it or not will be opportunistic. I mean, honestly, I can't say much at this point. But at this stage we have no plans either to increase it or not to increase it.

Luis Prieto

analyst
#17

Okay, thanks for that.

Moderator

operator
#18

Next up, we have a question from Dario Maglione at BNP Paribas. Dario, please go ahead.

Dario Maglione

analyst
#19

Good afternoon, and thanks for taking my questions — I have two. First, you said that during H1 you invested EUR 315 million in data center projects. Could you give us some more detail on what that covers — perhaps it's new land, or is it development of land you already own? Second, I'd like to ask about the U.S. Excluding data centers and just looking at the market there, non-residential construction appears flat to slightly down year-on-year in Q2. And yet Turner continues to grow substantially, even once data centers are taken out, on both revenue and order intake. So my question is how that's possible, and whether this performance can be sustained over the coming quarters. Thanks.

Juan Santamaría

executive
#20

Thank you, Dario. To begin with EUR 315 million that went into data centers. By now, we've likely invested somewhere in the range of EUR 2.4 billion to EUR 2.5 billion on data centers. That covers a combination of fresh land, development, energy, fiber and permitting — so it's a blend. Everything here forms part of the 2.1 GW development we're currently advancing. In time, we'll share further detail on where the 2.1 GW stands, the extra pipeline we've consistently mentioned — a further 6 GW — and at present we're looking at 11 GW, so that's expanding considerably, along with how we're handling all of it regarding investments and the future business case. Turning to the U.S., data centers have expanded considerably. I mean, that's a fact, and there are plenty of projects. Still, we're witnessing encouraging momentum across most areas. Take, for instance, beginning with the outlook for Turner in the U.S., we anticipate sports education growing 37% from 2025 to 2029. We see data centers carrying on at this rate of growth over the coming years. Batteries, as an example, took a hit in the near term across the last two to three years owing to technological shifts and uncertainty over EV demand.

Juan Santamaría

executive
#21

We witnessed quite a bit of unwinding in that regard. But that will catch up and ramp up once more. It is not certainly what has impacted Turner's revenues over the past two to three years, yet we anticipate that coming back. Semiconductors — I mean, that's a very favorable trend. Our belief is that roughly EUR 260 billion of investment will occur through 2030. We are involved in several tender processes worldwide around semiconductors, and we expect and we hope that market will begin ramping up very soon, bringing positive news for us. Healthcare, we're expecting 32% growth there. And that's essentially driven by population growth. And industrial manufacturing, both in the U.S. and everywhere else, is going to keep growing. And that's regarding the future. When you look at the current impact in Turner's backlog, we see enormous growth in data centers, enormous growth in biopharma. And biopharma versus the previous year, I mean, year-on-year, has grown 64.5%. And we see significantly growth back in commercial and social infrastructure. Sports, etc. So we see growth in that area too. And where we see things somehow steady, potentially even a slowdown in the backlog was semiconductors and batteries, which, in our opinion, and always after data centers, which will continue to be the big trend, semiconductors and batteries will be the two new horses in the race of growth.

Dario Maglione

analyst
#22

Thank you, Juan.

Moderator

operator
#23

We'll now take the next question, which comes from Philippe Leitch at Gaisha Bank. The line is yours.

Philippe Leitch

unknown
#24

Hi, everyone. I’ve got two questions. First, a quick follow-up on the holding cost question. If you split it between the 1st and 2nd quarter of this year — so, the 2nd quarter — holding contributed -EUR 22 million, whereas in the 1st quarter it was a positive EUR 2 million. Could you walk us through that large swing and how we should view or assume that -EUR 22 million on a quarterly basis going forward? My 2nd question concerns tax. If you could also explain why the tax or tax rate was so low this quarter. And maybe tied to that, if you could also explain the footnote where you announced a one-off result in that quarter related to recognition of a tax position. So if you can explain that as well. Thank you.

Juan Santamaría

executive
#25

All right, let’s begin with the one-off item, correct? This concerns the holding cost. As we state in the report, essentially there is a removal of the fair value change gain on the investment property, which is a data center located in Melbourne, Australia, under CIMIC. At CIMIC, this is land where we were developing a data center, and we accounted for it under the fair value methodology, with the revaluation reflecting substantial progress in the development phase. At HOCHTIEF, however, a cost model is applied to investment properties of this type. Therefore, at the CIMIC level — I mean, at the HOCHTIEF level — we eliminate it in the 1st half 2025 results. That is essentially the point, and this applied in the 2nd quarter of 2025. Now, the 2nd item concerned the tax gain — of the one-off and the credit. This was essentially — I mean — reevaluations of the tax credit position at the holding level.

Moderator

operator
#26

Regrettably, we're experiencing a few technical problems. Kindly stay on the line. Kindly stay on the line. We'll return shortly. We're dealing with some technical glitches. Thank you.

Juan Santamaría

executive
#27

Apologies — hello there. Are we coming through to you okay?

Moderator

operator
#28

Yes, that's possible. Go right ahead.

Juan Santamaría

executive
#29

All right, apologies — I’m not certain, so let me revisit that second item, since I’ve lost track of where I stopped. Essentially, the step from PBT to NPAT reflects only a revaluation of the tax position plus certain resolutions from the TAC that we obtained. Nothing abnormal or extraordinary is involved.

Moderator

operator
#30

Okay, let's proceed to the following question, which comes from Marcin Wojtal at Bank of America. Go ahead, please.

Marcin Wojtal

analyst
#31

Yes, hello. I have a few questions. First, is there any update on the plan to bring a financial partner into the data center business? And do you still intend to hold a presentation explaining your data center strategy in the 2nd half of the year? That was my 1st question; my 2nd concerns your policy on recognizing order backlog. Could you remind us how you treat the very large data center contracts you have been winning? Take, for instance, the EUR 10 billion at the end of last year for Meta in Louisiana. Is all of it, or Turner's share, already in the backlog, or is it recognized progressively over several years? Thank you.

Juan Santamaría

executive
#32

Alright, Marcin — let's begin with your first question. We're at a fairly advanced stage on the platform, and things are trending in the right direction. I'd rather hold back all the specifics about the data center platform, what lies ahead, and the business plan for the capital markets day we're putting together for October — we'll be announcing that date very, very soon. Now, on the order backlog for Louisiana and the most recent projects, we haven't — so let me begin with the policy more broadly. As we've been shifting into some of these projects that call for a great deal of engineering, the reality is that they're long-term projects. So a good number of the announcements we've made, including the one you're asking about, sit outside our backlog. The reason is that at present, our backlog carries very, very, very minimal engineering cost — that's just the 1st part. So it isn't in our backlog. The same holds true for many of our projects. Our backlog doesn't reflect how many projects have been awarded, or even how many projects we're actively working on and preparing here. They take a very long time to develop, with a lot of engineering cost tied to those projects.

Juan Santamaría

executive
#33

That's the reason we hold a substantial backlog — genuine backlog — which hasn't yet shown up in the presentation.

Marcin Wojtal

analyst
#34

Can you put a number on how much that comes to?

Juan Santamaría

executive
#35

Sure, absolutely — just give me a second on Turner. Let me grab the paper. As for Pennsylvania, there’s nothing in our backlog at this point. And regarding Louisiana, so far, of the EUR 3.3 billion, we have EUR 800 million.

Marcin Wojtal

analyst
#36

That's quite clear. Thank you.

Moderator

operator
#37

Next up, we have Graham Hunt from Jefferies. Go ahead, please.

Graham Hunt

analyst
#38

Okay, thank you so much for those questions. There are three of them, if that works. First, I wanted to ask you, Juan, whether you could share your perspective. I understand you have a partner in this business. Regarding where you see the medium-term outlook for the Abertis business and how it evolves from this point forward, is it simply about strengthening the portfolio, lengthening duration, and perhaps the occasional capital injection from the parent? Or is there more to the story that could become apparent over the next few years and bring it nearer to the market? Second question, just regarding some of the assets you've classified as held for sale, I wanted an update on those. Class A as well. A brief update on where things stand with those assets would be useful. Perhaps just one final question. We've observed some encouraging signals from the U.S. administration regarding AI acceleration development, especially in connection with the construction sector over recent weeks. I'd be interested in any thoughts you have on that and how it benefits the business in the U.S. Thank you. Thank you, Juan.

Juan Santamaría

executive
#39

Turning to Abertis. As you correctly point out, there's a bigger story there, and it will develop over the coming month. Yes, we'll keep working on our base case, which means optimizing CapEx and OpEx, and carrying on. First, several renegotiations are underway aimed at extending the lifespan of existing assets. Second, we've spotted opportunities that, similar to the A63, might reach Abertis soon, and we're pursuing them. Let me stress again that, first of all, Abertis remains our top priority. Between 2018 and 2024, EBITDA rose by EUR 1.8 billion, correct? That includes EUR 1 billion of organic growth. We have also improved the backlog to net debt ratio, from 5.5 times in 2023 up to 6.1 times in 2024. The net debt EBITDA ratio has come down from 6.6 times to 5.4 times, right? From 2024 through 2033, we intend to keep replacing EBITDA. At the capital markets day, we announced EBITDA of EUR 4.3 billion for 2024 and EUR 4 billion for 2033. As of now, following the most recent acquisitions and renegotiations, our 2024 EBITDA has increased from EUR 4.3 billion to EUR 4.4 billion, and our 2033 prospects from the capital markets day have risen from EUR 4 billion to EUR 4.75 billion, right?

Juan Santamaría

executive
#40

That's separate from what I just described — namely, that we intend to add further opportunities at Abertis. Our goal remains holding perpetual long-term assets, substantially extending the lifespan of those Abertis assets and ensuring that the EUR 600 million dividend Abertis pays at a 100% level keeps rising significantly. Now, regarding the asset sales you mentioned. At the capital markets day, we stated two things about sources and uses of funds. First, net operational cash flow we generate, EUR 700 million-EUR 750 million, and that is on track. Second, monetization of up to EUR 3 billion. Out of that EUR 3 billion, EUR 1 billion was already secured last year, and that was to 88 under realities. We think we can obtain a further EUR 2 billion, including what you just referenced, for instance the industrial assets we have up for sale. That forms part of it. Another non-core asset within the business. That remains part of the plan. The 3rd question concerns the U.S. administration.

Juan Santamaría

executive
#41

When it comes to the U.S., I'll set aside everything we're seeing on the digital side. Looking at the data center plans as they stand now, we're seeing extra funding and extra initiatives in both the U.S. and Europe around AI. In Europe's case, that relates to the AI factories. In the U.S. case, there are additional injections for AI training and AI development. Demand is astronomical, and we're addressing it, first through engineering construction and second with the two development platforms we'll announce in October. One is for the big ones, and the other is for AI processing, right? We'll provide plenty of details on that. Certainly there's a huge plan for AI investments in the U.S. I mean, we're very well positioned to capture it. Beyond that, in the U.S., between the one big beautiful deal announced with significant tax cuts in the country, and between all the investment they want to keep making in the civil space. With all the extra investment in defense, in critical metals, et cetera, we believe a lot of growth is coming besides AI.

Graham Hunt

analyst
#42

Thank you. That one is quite useful. Appreciate it.

Moderator

operator
#43

Thanks for the question. At this point we'll go to Nicolas Mora with Morgan Stanley. You have the floor.

Nicolas Mora

analyst
#44

Yes. Good afternoon, everyone. I have a couple of questions. The first concerns how Dragados — Turner Dragados specifically — performed, particularly within the U.S. What did you observe during the 1st half? Do you continue to — I mean, order intake has been somewhat volatile, Q1, Q2. But taking it all together, how would you characterize the underlying health of the pipeline and of the tender process? That is my 1st question. My 2nd question goes back to net debt along with free cash flow networking capital: there was a modest drawdown during the 2nd quarter in your core business. X factoring. Would you describe the payment cycle as perhaps somewhat less positive, at least regarding payments coming from customers and so forth in Q2, especially in the U.S., or is this essentially just normal seasonality? Thank you.

Juan Santamaría

executive
#45

First, regarding Turner Dragados — whether we’re talking about the business or cash flow, it’s purely seasonality, because the growth is there. There are many collaborative contracts we’re working on, and they’re very — I mean, they’re very slow to develop. So hopefully — I mean, it depends on when we secure some of those projects; a lot of them were announced, but they aren’t even in our backlog because they’re very slow to develop. It’s all negotiations, going through design, negotiating contracts, et cetera. That’s why it’s very seasonal. All of a sudden, two can come at once, and sometimes in a certain quarter we’re not seeing some of those, right? It’s not like the traditional design deal where every quarter we tender so many, and we have a success ratio, and then we continue winning, right? Having said that, that’s on the backlog perspective. From a business perspective, we believe the business is going very well. I mean, there’s a 19% increase on EBITDA in the Dragados quarterly performance versus last year in comparable terms. The EBITDA margin improvement was up 66 basis points, up to 5.6%.

Juan Santamaría

executive
#46

I mean, if you look at the impact excluding one-off restructuring costs, it went up 6% in the first half, reaching EUR 35 million. Now on operating cash — net operating cash flow on a comparable basis rose by EUR 83 million in Q2 2025, correct? And that's versus a year ago. Not bad. That said, we're expecting the second half to perform much better than this first half.

Moderator

operator
#47

Thanks for that question. It seems we don't have any more questions, so I'll hand the floor back to ACS management. Please go ahead.

Juan Santamaría

executive
#48

I just want to thank all of you for being here today and for listening to the presentation. As always, please don't hesitate to reach out to us at any time if you have additional questions. Thank you.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete ACS, Actividades de Construcción y Servicios, S.A. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to ACS, Actividades de Construcción y Servicios, S.A. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in ACS, Actividades de Construcción y Servicios, S.A. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.