Thanks a lot, operator, and good morning to all of you. I'm happy to welcome everyone to Bitdeer's earnings conference call for the third quarter of 2024. With me on the line today are our Chairman and CEO, Jihan Wu; our Chief Business Officer, Matt Kong; our Chief Strategy Officer, Haris Basit; and Jeff Laberge, who leads Capital Markets and Strategic Initiatives. To get us started, Haris will give a big-picture look at how Bitdeer performed in Q3, and after that he'll walk through the company's strategy along with a thorough update on the business. Following that, Jeff will take a closer look at the financial results for Q3, and then we'll take your questions. Before our management team dives into their prepared comments, we want to remind all of you that we might make forward-looking statements on this call; those statements reflect management's present expectations and carry risks and uncertainties that could lead actual outcomes to differ materially from what's stated or suggested in the forward-looking statements. To get a fuller picture of our forward-looking statements and the risks and uncertainties tied to Bitdeer's business, please look at the filings it has made with the SEC. Also, beyond talking about results calculated under International Financial Reporting Standards, or IFRS, we'll also reference some non-IFRS financial measures, including adjusted EBITDA and adjusted profit; for deeper detail on our Non-IFRS financial measures, please see the earnings release we put out earlier today, which you can find on Bitdeer's Investor Relations website. Thanks so much. At this point I'll hand things over to Haris. Haris?

Haris Basit

executive
#2

Thanks, Yujia, and hello everyone. It's great to have you join our inaugural earnings call following our listing as a public entity last year. Bitdeer differentiates itself within this sector through a distinctive value proposition, and we're eager to discuss the numerous advancements taking place within the organization and guide you through what we've accomplished since the previous quarter. Prior to going further, let me quickly touch on our Q3 financial performance, while Jeff will share additional specifics during his portion. In Q3, we recorded total revenue of $62 million. Gross profit came in at $2.8 million, while adjusted EBITDA was negative $8.5 million; this weaker outcome relative to Q3 of the prior year stemmed mainly from the consequences of the 2024 halving, an elevated global network cash rate, reduced revenue from hosting and cloud mining, plus increased R&D expenses tied to the one-off development cost for our SEAL02 chip; these adverse effects were partly counterbalanced by a modestly greater average self-mining hashrate during the quarter alongside stronger Bitcoin prices. Although numerous competitors chose a path of expanding self-mining hashrate, our approach has been more long-term, prioritizing resources initially toward creating our proprietary ASIC technology. We think this sets our operation apart considerably from others in the sector regarding strategic positioning, revenue and cost structure; simultaneously, we deliberately grew our energy infrastructure pipeline so it would be operational when our mining rigs become ready; this empowers us to swiftly boost our self-mining hashrate leveraging our in-house ASIC technology over the upcoming months and years; this emphasis on technology as a strategic priority has remained central to our approach and stems from the DNA of our leadership, which possesses a demonstrated history of establishing and growing prosperous tech enterprises. As we look ahead, commoditization is likely to become the norm across this industry, and that will push Bitcoin miners to branch out and set their business models apart if they want to remain competitive. To get there, we're focused on building a vertically integrated operation by developing best-in-class hardware and software across both our ASICs and AI cloud business lines, while at the same time ensuring geographic diversification throughout our operations and supply chain worldwide. We're placing priority on strategic expansion rooted in substantial R&D to establish a robust competitive moat surrounding our operation; concerning the ASIC business, we've achieved notable progress on our product road map during this year and are accelerating toward commercializing our sophisticated SEALMINER ASICs to disrupt what industry experts estimate as a $4 billion to $5 billion annual market over the next 5 years. We observe robust demand for varied ASIC solutions and suppliers. Bringing our SEALMINER ASICs to market will let us access this expanding market, diversify our revenue streams and greatly speed up expansion of our self-mining operation. Possessing our own ASIC mining rig represents a major move toward complete vertical integration and will grant us clear benefits, such as a diversified revenue stream, reduced cost structure, enhanced capital efficiency and vastly better supply chain relative to the remainder of the industry. Back in early June, we laid out the R&D technology road map for our SEALMINER product, and the first batch of SEALMINER A1 mining rigs, running on the SEAL01 chip, is already energized. Performance of these chips is meeting what we expected; mass production started in October, and between December of this year and Q1 2025 we intend to install 3.7 exahash in phases. This launch coincides with powering up the initial stage at our Tydal, Norway site, as well as the water-based cooling operations at our Rockdale, Texas location. During October, we also completed the successful incorporation of the SEAL02 chip into our SEALMINER A2 mining machines, spanning the air-cooled version and the hydro-cooled version. When tested, SEALMINER A2 units achieved 226 terahash per second with air cooling and 446 terahash per second with hydro cooling, while reaching 16.5 joules per terahash in efficiency across both configurations. Full-scale manufacturing of the SEALMINER A2 is now underway, and the initial batch is expected to produce 18 exahash per second, intended for our own mining operations and for selling to outside buyers. A key event here is that we're now selling the SEALMINER A2 commercially, with shipments to buyers scheduled to start in the first quarter of 2025. We want everyone involved — shareholders, suppliers, and most of all the clients who depend on straightforward information to make their business choices — to have visibility, so we'll continue providing updates on how our hashrate production is coming along. In addition, we've completed the tape-out of our third-generation chip, which carries a target efficiency of 10 joules per terahash, the best in the industry, and we anticipate the first sample wafers during the second quarter of 2025. Looking ahead, we remain entirely focused on achieving a strong entry into the multibillion-dollar ASIC market during 2025. We've already begun talks with several prospective customers. The initial reception has been encouraging, which points to significant enthusiasm for our advanced solutions as well as a broader industry appetite for both technological and supply-chain variety. We look forward to fulfilling that interest and to start generating a distinct, more varied income flow for our investors. One more thing I'd like to highlight: we intend to complete the tape-out of a fourth-generation chip during the latter half of 2025. Our goal for it is an energy efficiency of 5 joules per terahash — a level never achieved before. Together with the third-generation chip, we think this one can make Bitdeer the top supplier of the most energy-efficient mining rigs available on the market. In our view, that will greatly bolster our competitive standing and create considerable value for shareholders. Turning now to the AI cloud side of our business: in September, utilization of our NVIDIA DGX SuperPOD system in Singapore came in at roughly 98%, which cements our position as a premier provider of advanced AI computing solutions across Asia. We have solid know-how when it comes to rolling out AI infrastructure and providing cloud platform offerings, including bare metal, virtual machine, and serverless GPU. Those offerings enable computing in several regions, drawing on assets we own as well as those from third parties; more recently, we brought our GPU cloud capacity into Canada. Because of how our cloud services business is built — both the model and the technology — we can collaborate with partners to scale quickly whenever customers need it. Within our GPU cloud services, demand continues to rise at a steady pace, and we are positioning Bitdeer to address the rapidly expanding market of companies focused on LLM training and inference — serving small and medium-sized businesses as well as large corporations. When it comes to our energy assets, we're actively looking into ways to use our worldwide power capacity of 2.5 gigawatts to take advantage of the huge surge in demand for power from HPC and AI data centers. Back in July, we brought in TLM Group, a top consultant in HPC and AI data center development, to carry out a thorough suitability analysis covering every one of our sites. TLM Group finished its feasibility assessment for our U.S. sites and confirmed that several are suitable for Tier 3 HPC and AI data centers. These locations come with plenty of electricity that could be brought online quickly, plus fiber with low latency and ample water supplies; conversations are already underway with development partners and possible end users about these sites. For the AI data center sector, securing dependable power is one of the biggest obstacles it faces, and our sizable power capacity leaves us in a strong spot to meet that growing need. Right now we're collaborating closely with top data center developers and advisers to finalize long-term partnerships and strategic opportunities that would allow Bitdeer to take on a major role within the fast-changing HPC and AI landscape. Now I'll move on to how we're building out the extra 1.6 gigawatts of electrical capacity and infrastructure. Work at our sites worldwide continues to advance at a steady pace. This quarter, we expanded our monthly production reports with additional detail, giving everyone a clearer picture of how the buildout of our infrastructure is coming along. In Tydal, Norway, the first phase of expansion — 40 megawatts — remains on track to be powered up in December 2024. Over in Rockdale, Texas, the 100-megawatt hydro-cooling conversion has slipped by one month, which we attribute to supply chain effects tied to the U.S. dock workers' strike that took place in early October. Energization, done in phases, is now anticipated to occur sometime from January through March 2025. Meanwhile, things are progressing nicely on the 500-megawatt project located in Jigmeling, Bhutan, where the main substation should wrap up by the first quarter of 2025. Along with those initiatives, and additional ones like the second phase at Tydal in Norway and the first phase at Clarington in Ohio, we are set to add more than 1.1 gigawatts of fresh power capacity during the coming year; all told, plenty of thrilling milestones lie ahead. Our SEALMINER A2 ASICs remain on schedule for delivery, we expect substantial expansion of our self-mining fleet backed by a competitive cost edge, and we will continue capitalizing on our globally leading power portfolio. At this point I'll hand things over to Jeff LaBerge, who leads Capital Markets and Strategic Initiatives for us, so he can walk through the quarter's financial results.

Jeff LaBerge

executive
#3

Thank you, Haris. Before I walk through Bitdeer's financial results for the third quarter, I want to remind everybody that every figure I mention today is denominated in U.S. dollars, and that each comparison is being made against Q3 of the prior year. Consolidated revenue for Q3 came in at $62 million, compared with $87.3 million. Self-mining revenue reached $31.5 million, a rise of 4.7%, mainly driven by our average self-mining hashrate for the quarter climbing to 7.8 exahash from 6.1 exahash, along with stronger Bitcoin prices relative to a year earlier. Those favorable factors were largely canceled out by the April 2024 halving and a higher global network hashrate. Cloud hashrate revenue totaled $7.1 million, compared with $15.6 million; the drop stemmed mainly from long-term cloud hashrate contracts coming to an end. That hashrate was afterward redirected into our self-mining operations. General hosting revenue came to $9.6 million, compared with $22.2 million. Membership hosting revenue was $9.9 million, compared with $16 million. Two main factors caused the decline in hosting revenue. First, at our Texas facility we are converting 100 megawatts of hosting capacity — hydro-cooling capacity — which we expect to be completely renovated and fitted with SEALMINER hydro-cooled mining rigs by the first quarter of 2025. Second, following the halving in April 2024, certain hosting customers pulled out less efficient miners. New hosted mining rigs are presently replenishing that additional capacity. Total gross profit for the quarter was $2.8 million, compared with $21.1 million, while gross margin was 4.5%, compared with 24.2%. The fall in our gross margin was chiefly caused by lower hosting and cloud hashrate revenues and by higher average power prices, mainly at our Rockdale, Texas facility. Total operating expenses for the quarter were $42.9 million, compared with $27.3 million. The rise was chiefly caused by higher R&D costs, including a $13.4 million one-off incremental development expense tied to the SEAL02 chip, along with higher stock-based compensation and noncash amortization expenses of intangible assets connected to the acquisition of FreeChain. Other net gain/loss for the quarter was a net loss of $14.7 million, compared with a net gain of $0.9 million. That net loss resulted from a $14 million noncash derivative gain on the Tether warrants, offset by a $29 million noncash derivative loss on the convertible bond issued in August. IFRS net loss was $50.1 million, compared with $1.8 million. Adjusted profit was negative $26.2 million, compared with positive $10.5 million. Adjusted EBITDA was negative $8.5 million, compared with positive $28 million. This quarter's losses stemmed chiefly from the year-over-year revenue declines in our cloud hashrate and hosting businesses, lower gross profit margins in our self-mining businesses resulting from halving, and higher R&D as described earlier. Net cash used for operating activities was $90.7 million. Net cash generated from investing activities was $10.2 million, including $30.1 million of capital expenditure for infrastructure construction and mining machines, plus proceeds from disposal of cryptocurrencies of $39.9 million received from our principal business. Net cash generated from finance activities for the quarter was $168.1 million, chiefly as a result of $166.3 million raised from our convertible note issued in August. Looking ahead, we anticipate that CapEx spending will speed up as we keep expanding our worldwide power and data center infrastructure. From Q4 2024 through 2025, we expect infrastructure CapEx to fall somewhere around $250 million to $275 million. Keep in mind that this infrastructure investment presumes those sites get built for Bitcoin mining, and it excludes any CapEx for SEALMINERs that we'd use in self-mining. And to wrap up, we closed out the quarter financially strong, holding $291.3 million in cash and cash equivalents, $39.7 million in cryptocurrencies, and $92.7 million in borrowing, derivatives excluded. Thanks to all of you; that wraps up the prepared remarks portion of today's earnings call. Operator, would you please open the line for questions.

Greg Lewis

analyst
#4

Fellas, I appreciate the detail on the TLM. I was wondering if you might expand on that a bit — the process, and how it sets you up to maybe land some HPC partners across the coming couple of quarters.

Haris Basit

executive
#5

Greg, thanks for asking. So yes, as we mentioned on the call, the TLM engagement is more or less wrapped up. And we've got very positive reports regarding our U.S. sites, particularly 3 of them — the 2 Ohio sites plus Rockdale. What we're doing right now is something we really can't say much about. We do have plenty of ongoing discussions, even today and across the last few weeks; so I think we won't be ready to announce anything for a little bit; and we're simply talking with folks who are — will make good partners for us as we proceed in an area here that's new for us; so we're really trying to find the right partnerships. And I don't know, Jeff, did you want to add to that?

Jeff LaBerge

executive
#6

Yeah, I'd say we've been — there have been quite a few discussions on our end, particularly with prospective partners. What we're really doing, I think, is putting more emphasis on what this partnership would be structured like and how it ought to come together from a financing standpoint as well as an operating one; we believe these sites will draw interest, in light of what the TLM report brought to light. And in the end, I think how it gets financed and actually structured is going to be a primary factor behind returns over the long term. So that's the piece we've been concentrating on heavily. We can report that multiple parties have shown considerable interest in expressing it.

Greg Lewis

analyst
#7

All right, that's great. And next, I was hoping we could discuss how the SEALMINER is being brought to market. I mean, quite a bit is happening in that area, particularly regarding how efficient the machines are. I understand you currently have a substantial amount of infrastructure already in place that is hashing for Bitcoin, and if we take it as a given that this situation largely continues, is there any way you could help us frame how those more efficient rigs will be introduced, and also help us consider the potential expansion of your worldwide hashrate as these new machines get rolled out and put into service?

Jihan Wu

executive
#8

Matt, go ahead.

Linghui Kong

executive
#9

Yeah. I believe at this point we can see quite clearly how to handle self-mining as well as selling mining machines into the market. Technically speaking, I'd say we're in a strong position for that. A great deal of power has been locked in, and on top of that, our mining machines are quite solid and are now entering mass production. So looking ahead, we've already stated publicly that we will reach 18 exahash of hash power. That hash power is going to be distributed, I'd say primarily toward self-mining, while a portion will be directed to the market as a demonstration of how far our technology has come. So as we move forward, I think we should — with our data center finished, we'll have additional capacity. That means deploying more of our A2, or perhaps even A3, mining machines into the data center so that our self hash rate climbs higher.

Greg Lewis

analyst
#10

All right. Great. Then one final thing from my side. During, say, the past two quarters or so, given where the Bitcoin price stood, it appeared that as many of those hosting agreements reached their end, that sort of infrastructure returned to Bitdeer, and at that point you could — not could, you actually did — put additional rigs onto that infrastructure. Considering the genuine spike in Bitcoin across, I believe, the most recent two months, has that shifted things when it comes to Bitdeer's capacity to take back a portion of that already-existing hosting infrastructure and turn it toward self-mining?

Linghui Kong

executive
#11

Yes. All right. I'll respond to that. Once AI began competing for power within the data center space and Bitcoin's price climbed substantially, naturally. As a result, the worth we perceive in power supply has risen considerably. Therefore bringing that hosting capacity back serves our interests; yet simultaneously, we must guarantee that those customers who signed on with us previously for hosting services continue to trust us and maintain some feeling of dependability toward us. So we won't apply excessive pressure. Instead, we'll simply seize those chances and openings when customers generate them in order to recover that hosting capacity.

Jeff LaBerge

executive
#12

Greg, let me just tack something onto that point. The bulk of those general hosting clients were simply agreements set up to expire right around now, and they just didn't get renewed. So as you put it, that capacity is going to return to us, and we'll be able to make it available for self-mining deployment.

Brett Knoblauch

analyst
#13

I'd like to get a little more detail on what you said about CapEx — I believe it's $250 million to $275 million across roughly the coming year. Could you lay out where that money is headed, which locations, and what those locations will eventually be doing? Is it additional hosting capacity? Will it be self-mining?

Jeff LaBerge

executive
#14

Sure, Brett, I'll take that one; so the figure we gave in the earnings release, $250 million to $275 million, is — mainly relates to the sites we've already announced that are under construction at present. That means the Tydal, Norway site, Texas hydro conversion, Jigmeling, Bhutan. And it also takes into account Massillon, Ohio, assuming that one does go to the Bitcoin mining. Plus it includes part of the Clarington Phase 1 upgrades too. So those are the figures built into that; and from a mining perspective, once again, those figures presume that the — the sites are going to be used for mining. And once again, going forward in most cases, we'll put more emphasis on self-mining than hosting capacity, though that doesn't mean we wouldn't consider further hosting discussions, depending on, once again, market cycles, market conditions.

Brett Knoblauch

analyst
#15

And whenever you mention, sort of, the locations for Bitcoin mining, does that cover the entire electrical infrastructure plus the powered shell? So the sole remaining piece would simply be rigs getting connected? Or does this refer only to the electrical infrastructure constructed at those locations and to getting those locations energized, from that standpoint?

Jeff LaBerge

executive
#16

The electrical infrastructure would be covered, along with the build-out. So basically, all of it apart from the rigs.

Brett Knoblauch

analyst
#17

Great, that's genuinely useful. Now turning to the ASIC segment. I noticed inventory rose quite sharply versus the prior quarter on the balance sheet. Maybe that stemmed from the acquisition, or possibly it reflects working capital you've invested ahead of those machines entering mass production. Either way, could you walk us through what working capital dynamics are required for you to mass produce these chips? What amount of extra capital or inventory is necessary? And how should we think about the timing there?

Jihan Wu

executive
#18

Sure, okay. On working capital, I'll take that question. TSMC takes a highly conservative stance toward the crypto sector. As a result, payment must be made upfront once wafer fabrication begins. Then, after the wafer returns to us, we require another 2 months before mining rigs can be mass produced. So across the ASIC and mining rig operations, we generally need a working capital cycle of 6 months to cover the cost of the mining rigs.

Brett Knoblauch

analyst
#19

If you needed to put a figure on what that might come to for SEAL01 and SEAL02, is there a rough guess you can offer? Or is it still too early to say?

Jeff LaBerge

executive
#20

For SEAL01, no additional wafers of that kind are being produced by us. As for SEAL02, that's the 18 exahashes we've already made public. You probably remember the capital needed for it. So yes, the CapEx needed there would land somewhere around $100 million — I can offer a range, perhaps $125 million to $175 million that we would want to have.

Brett Knoblauch

analyst
#21

Great, that really helps a lot. Now, one more thing I want to get straight. Regarding the resistance around switching Rockdale over to hydro-cooling, my understanding is that you folks had initially anticipated 3.4 exahash from your own machines — meaning the SEAL01 rigs — would be installed there by the end of the year. Is the holdup there the cause of that getting moved back? Or do I have that correct?

Jihan Wu

executive
#22

Yeah, the main reason is the construction of the mining farms running behind schedule, plus the strike by workers at the port.

Kevin Cassidy

analyst
#23

Just to clarify a bit — TLM had mentioned that this works for Tier 3 data centers. Could you explain how a Tier 3 differs from, let's say, a Tier 2 or Tier 1 data center? And what types of customers do you think you'd go after?

Jeff LaBerge

executive
#24

What we're looking at — and really, the guidance we handed TLM was whether it's appropriate for a top-tier AI-style data center and that use case. So we never actually specified Tier 3, though that does fall within that kind of characterization. There are needs here that go well beyond what, say, a Bitcoin mining operation requires, certainly. And even considerations such as whether you're adjacent to a railroad track carrying hazardous materials, where the 100-year floodplain sits, and similar factors — so lots of extra criteria that really center on safeguarding the enormous investment made in a modern AI or high-performance computing data center. So we instructed them to locate every scrap of air across the sites. They then worked through quite a thorough list. There are various minor items we've either resolved or could resolve with a fairly modest sum of money or time, yet nothing major turned up that would block or truly postpone those sites from being used for AI or HPC. I should emphasize, however, that we haven't decided anything yet about whether those sites will serve AI or Bitcoin mining.

Kevin Cassidy

analyst
#25

Got it, got it. And so perhaps while you're in the process of reaching that decision, could you share some sort of estimate comparing how profitable the HPC AI data center is against mining?

Jeff LaBerge

executive
#26

Kevin, would you mind saying that again?

Haris Basit

executive
#27

Are you referring to the likelihood that Bitcoin...

Kevin Cassidy

analyst
#28

When you're weighing whether to turn any of these sites over, wouldn't co-hosting the HPC data center bring in more profit than mining?

Jeff LaBerge

executive
#29

There are several angles from which that can be examined, and the answer truly hinges on the way you build out the Bitcoin mining scale and what you plug in for hash price across the coming few years; the result is that the model can be made to land on whichever side you like. So it could be that one option wins on profitability, or the other does. It's — and so — but there's also value in spreading out where our revenue comes from and having a — so our thinking isn't limited to straight ROI; we also weigh what this could mean for our shareholders and the consequences of a dependable, relatively high-margin income stream stretching over the next 15 years, plus how that shapes our share price and affects our shareholders, and that's on our minds too. So this equation includes a balancing of projected revenue-stream diversification alongside pure ROI, particularly because projecting Bitcoin's future is so hard to do.

Darren Aftahi

analyst
#30

I have a couple of questions, if that's okay. To start, when it comes to your ASIC operations and manufacturing those machines, with the new administration coming in, is there any shift in your competitive standing, or around possible tariffs? Any perspective you could share on that?

Jihan Wu

executive
#31

Would you mind asking that once more?

Jeff LaBerge

executive
#32

If the incoming administration changes anything we're doing with regards to our ASIC manufacturing?

Jihan Wu

executive
#33

That's not how I see it.

Jeff LaBerge

executive
#34

Correct. My view is that we'll keep moving forward just as we've done up to now, and honestly, no meaningful effect is apparent to me.

Darren Aftahi

analyst
#35

Great. Then regarding your sites, if you're thinking about eventually going ahead with a Tier 3 data center, there are two things. First, how essential is it to bring in people with that expertise on staff? Second, when you settle on a model, do you want to own and run it yourselves? Or would you rather have it handled by a third party under a cost-plus arrangement, with you making the final calls? I'm just trying to get a sense of how you view the economics and who would hold ownership.

Jeff LaBerge

executive
#36

I'd say we're open to several of those options, and it hinges heavily on whom we ultimately partner with for this, as well as who the final customer turns out to be. So I realize I'm not truly giving you an answer, since as of now, we remain open to those options. We're talking with various parties, and each of those would lead to a different model. Eventually, I do believe we'll need to bring additional people into the company; but precisely what expertise those new hires must provide hinges heavily on the model we select, naturally. I don't have a particularly exact answer for you at this moment, because we're still keeping our options open.

Darren Aftahi

analyst
#37

Let me fit in one final question, if that's okay. Considering how different places regulate things, what's your take on which market in the U.S. — Texas or Ohio — would be the more probable location for — and I don't mean based on what this particular site offers, but rather which one would secure regulatory clearance more quickly, Texas or Ohio.

Haris Basit

executive
#38

Yeah. Well, we believe both are excellent places to operate a business. Take our facility in Clarington, Ohio — a few weeks back, we sat in a meeting with essentially the full council for that entire county. They are extremely friendly toward business there. Everyone with whom we've spoken there has shown a lot of enthusiasm for this chance. So from a broader regulatory perspective, I suppose, both markets look quite appealing. And in my view, the regulatory aspect won't truly be a big driver behind the choice. My sense is that commercial considerations will matter more.

Jeff LaBerge

executive
#39

In each of those places, we've built strong ties with both the local governments and the communities.

Mike Colonnese

analyst
#40

Starting with my first question. I value the information you provided about the ASIC market opportunity reaching multibillion dollar scale across the next several years; however, I'd like to know, what target do you have regarding market share when we project forward a few years? Also, what's your strategy for taking share away from big, entrenched competitors such as Bitmain and MicroBT? And please address your capacity to expand production volume in that segment as time goes on.

Jihan Wu

executive
#41

My belief is that we'll obtain market share through our technology plus the reliability of our mining rigs. Additionally, we'll offer highly transparent figures regarding the quantity of mining rigs we intend to manufacture in the near future, along with the aggregate purchasing patterns of our clients when considered as a whole. Consequently, each customer will base their choices on logical figures and forecasts about what lies ahead. As for market shares, I don't think we can predict them, since they're somewhat hard to anticipate given that the production capability of Samsung and TSMC is yet to be determined. We lack certainty on that. At present, semiconductors at the advanced node are at maximum utilization. Therefore, how capacity gets allocated remains very much up in the air at this moment. Still, we hold this sort of assurance that our chip design will be essential, along with general reliability and total cost throughout the entire manual.

Mike Colonnese

analyst
#42

Understood. It seems the hosting segment continues to experience somewhat of a transitional stretch across the recent pair of quarters; and in October, it appears you hosted roughly 9.5 exahash, more or less. Once more contracts actually drop away from the standard hosting operation, where should we anticipate that figure landing?

Jeff LaBerge

executive
#43

Really difficult to predict. What I'd say is we don't expect it to rise meaningfully beyond its current level. Like we mentioned, since we now build our own ASICs, we will definitely prioritize self-mining ahead of hosting. So a portion of that capacity will — it might get refilled; however, I believe it's fair to state that most of our spare capacity going forward will go toward self-mining.

John Todaro

analyst
#44

Thanks. I've got two things for you folks. The first concerns the HPC chance, and then the next one is about the mining rig side. To start, regarding development partners, can you expand on that a little? Does that mean somebody actually steps in and takes a share of the equity in those sites? And along those lines, would there be divided economics in that sort of development partnership? Or is it mainly — just on the building side? Then once that's done, I'll move to my second question.

Haris Basit

executive
#45

So yes, that's a possibility, and a number of the people we're in discussions with would fit into that group. Like I mentioned earlier, we still haven't settled on a business model or picked a partner for this. That means I can't precisely state which model it will end up being. However, we're evaluating models involving an equity split of some kind, and that's among the things being discussed.

Jeff LaBerge

executive
#46

Yeah, John, there are a few different paths that could take. Clearly, one option is bringing in an infrastructure fund simply to provide financial backing for the project, and then we'd build out that team using a mix of outsourcing and people from within. Alternatively, we could go the partnership direction, meaning we'd basically team up with a party that already possesses that development capacity. So, as Haris mentioned, no model has been finalized at this point; we're still looking into those options.

John Todaro

analyst
#47

Okay, that makes sense. Thanks, that's useful, guys. Moving to the second point, when we consider the mining rig business and take a broader view, how do you see the ASIC cycle lining up with the Bitcoin cycle? And at what point — or when — would you anticipate rig prices rising and margins widening in connection with a Bitcoin cycle?

Jihan Wu

executive
#48

Typically, whenever the Bitcoin price climbs high, I get the sense that semiconductors are likewise in a strong bull cycle. As a result, when we look at mining rig supply, in most instances it's very likely to be severely constrained. And the per-unit price of mining rigs will be pushed higher by the hash price. For a fairly long stretch, we've observed a rather steady hash price near $40, $45. Lately, though, you've noticed the hash price ticking up somewhat. At present it sits at roughly $40 — $55 per petahash per day, a modest increase. However, many older fleets haven't been powered on owing to poor energy efficiency. Yet if the Bitcoin price rises, perhaps a large number of older-generation fleets will come online. So we'd need to watch for the Bitcoin price to gain maybe another 20% or 30% before the hash price climbs more meaningfully. The encouraging part, though, is that even in the event the Bitcoin price falls, the older-generation mining fleet currently operating would also shut down. Therefore, it's quite unlikely the hash price would decline if the Bitcoin price declines.

Nick Giles

analyst
#49

Nick Giles here, filling in for Lucas. I wanted to ask about TLM's assessment. Are they still looking at locations beyond the U.S.? And can you give us a reminder about the schedule for that? Also, might that assessment have an effect on your buildout in Norway and the way you approach it?

Jeff LaBerge

executive
#50

Right, so TLM isn't in fact reviewing the Norwegian sites; we'll probably bring in a different local outfit for that work. What we're aware of, clearly, is that once our expansion wraps up, the Norway sites are going to have roughly 300 total megawatts. From a latency perspective, Norway is in fact extremely well linked, with quite a few submerged sea cables running across the entire country. So Norway has connected to the rest of the EU quite effectively. Clearly, water is available, power is available, and it's all hydropower. So from an HPC standpoint, we'd expect those to be highly appealing sites. But as I mentioned, we'll bring in a local firm for a more thorough analysis.

Nick Giles

analyst
#51

Understood, that's useful. You've got quite a few expansion projects going on inside your existing footprint, clearly, but I wanted to ask whether you could address any chances beyond that? Are you currently evaluating any possible new locations? Or have you hit pause on things, simply because of how many projects are underway?

Jeff LaBerge

executive
#52

We never stop looking. New sites and new opportunities come our way constantly; we review every one of them. Clearly, we currently have a substantial pipeline in place to build a very appealing asset. So for us, any fresh acquisition would have to be highly strategic. Clearly, price would factor in too. So we remain open and on the lookout for new opportunities, yet we don't believe we're in a spot where we must push anything new, considering the extensive pipeline already in our hands.

Nick Giles

analyst
#53

That makes sense. One final question from me. When it comes to those 18 exahash, how should we think about the division between mining for ourselves and selling to outside buyers?

Jihan Wu

executive
#54

At this moment, self-mining comes first, because looking at the years ahead, many of our mining facilities are going to finish being built; leaving those facilities sitting idle afterward wouldn't be ideal. At the same time, though, we have to think about the long run for our ASIC sales operation; that business is substantial, and we do feel a kind of duty to get our mining rigs out across the entire ecosystem, rather than letting too much hash rate pile up in one place, so that the Bitcoin network stays decentralized too. And should long-term customers want to place a really large order with us, we'd need to be selling mining rigs starting now, so those customers can try out our rigs in a test run. So at this point, we have an 18 exahash that we're planning to build. And roughly 30,000 units of air-cooled equivalent of hydro-cooling mining rig have had their capacity locked through our website over the past week. That comes to about 1/3 of the overall hash rate we intend to manufacture as of now. So most of it goes toward our self-mining, and then a portion gets allocated to our customers. That way, potentially, they'll gain the confidence and the sort of mechanism needed to order more from us down the road.

Jeff LaBerge

executive
#55

Nick, one more thing I'd toss in there: once again, a benefit of how we operate — since we both build equipment and mine on our own account — is that it lets our choices track the market very closely. So should the economics of selling mining rigs look better, we'd clearly be in a position to take advantage of that. And if that looked like a worse option, we'd clearly be able to put those rigs to work ourselves. So essentially, it means we can always find the highest and best use for each and every rig we ever produce.

Brian Kinstlinger

analyst
#56

Regarding the A2 moving into mass production, my first question is whether you could tell us your expected monthly output capacity. Perhaps also how that might affect efficiency across the coming 12 months?

Jihan Wu

executive
#57

All right. We have — we've tried to be as open as we can. How much hash rate we plan to produce is already out there, 18 exahash right now. Should additional plans come together, or if we obtain further indications or assurances from the supply chain, then that figure will be revised upward. And at present we foresee no obstacles to producing SEALMINER A2 at scale. As for power efficiency in our own mining operations, it's fairly evident that the rigs we run at our own mining farm belong to a considerably older generation. They were roughly 4 years circles machines. The reason is that our financial resources went toward constructing the mining facilities and creating our own mining chip, our own mining — priority mining ASICs. And we purchased relatively little from other mining rig suppliers, aside from a handful from <<inaudible>>; yet thanks to our SEAL02 and the anticipated SEAL03, the power efficiency of mining hash rate is set to rise substantially. At this moment, it stands above 35 to 40 joule per hash as an average across our mining operations, but over the next coming years it should drop below 20, 16.5, or possibly even to roughly 11 or 12. So our hash rate's power efficiency is going to climb dramatically in the year ahead.

Brian Kinstlinger

analyst
#58

Great. Now for a quick second question about the numbers. Regarding the SEALMINER 3 tape-out, I believe I noticed it in the October press release — should we anticipate another one-time, nonrecurring R&D expense comparable to the one in the third quarter?

Jihan Wu

executive
#59

Yes, when you do chip design, ethical design, that's a large chip; we will share the very precise R&D expense figure.

Mike Grondahl

analyst
#60

I've got two questions about HPC. First, what's the headcount at Bitdeer dedicated to the HPC initiative? Second, from your conversations with financing partners, at a broad level, what do those terms generally look like? Then maybe one about ASICs. In the release, you said you're in talks with a number of potential customers. How near are we to seeing orders come in from those customers?

Haris Basit

executive
#61

I believe I'll handle the first one. Unfortunately, I can't give you a direct answer on that. There are 3 people examining partnership and deal opportunities on the HPC AI side; nobody has been specifically brought on board with that background or expertise; and we're starting by looking at business development. That said, we do have consultants and other people helping us with it; and your second question...

Jeff LaBerge

executive
#62

On the terms themselves, honestly, there isn't much we're in a position to reveal right now. As I mentioned, I suppose you could sort them into a few distinct categories when it comes to what kinds of terms we're considering. Clearly, one possibility is an infrastructure fund that would basically step in to support the project, putting money in either as equity at the project level, as debt, or both. Another possibility is a development partner joining with equity, plus a portion of the development expense capital too. That said, when it comes to specifics on terms, we can't share anything at this point.

Haris Basit

executive
#63

Mike, did you have an ASIC question also?

Mike Grondahl

analyst
#64

Yeah. Your press release mentions that discussions are happening with several possible ASIC buyers. I'm just wondering how near you might be to landing that initial purchase, or when we could start seeing something materialize there.

Jihan Wu

executive
#65

Right. In fact, over the past 7 days, we kicked off something we call capacity lock-in, meaning that customers who have shown interest in SEALMINER A2 must go ahead and register their demand. What we actually received was interest amounting to 253,000 units, and just 30,000 of that total has been fulfilled. This type of capacity lock-in ordering comes from 64 customers. For each unit, a payment of roughly $200 — $199 to be exact — is required. And up to now, they have — let me verify this. Up to now, they've paid the capacity lock-in fee of $199 on approximately 12,000 units. So I'd say the interest, the demand, the enthusiasm, and the supportive feeling coming from our customer base are quite genuine.

Bill Papanastasiou

analyst
#66

On that first point, I was wondering if you could talk about how viable locations outside the U.S. are for AI HPC, and whether those locations rank as a priority compared with the ones in the U.S. Could you make any comparisons regarding AI HPC demand, along with the main things to consider when it comes to financing, counterparty risk, and economics?

Jeff LaBerge

executive
#67

Sure. On the subject of places beyond the U.S., I can speak to that. As I said earlier, in our opinion the Norway sites are going to be quite appealing because of the renewable energy piece, plus the fiber connectivity, water, and clearly the climate in that area would be perfect for cooling too. Based on the folks we've talked to, the EU is probably 12, maybe 18 months behind the U.S. when it comes to adoption. In our view, though, the EU faces even tighter power constraints than we do in terms of getting new generation online. So we see a major opportunity in Europe, since certain data privacy laws over there mean EU domicile data centers will get preference. That gives us one benefit: it essentially hands us a longer tail on this opportunity. At present, the window for this HPC opportunity in the U.S. is maybe 2 years, maybe 3 years, depending on who you believe. In Europe, though, we believe that tail stretches further out, and possibly in Asia too, with our Bhutan site. So that's roughly how we're viewing it at the moment.

Bill Papanastasiou

analyst
#68

Appreciate that.

Jeff LaBerge

executive
#69

Second part of your question, Bill?

Bill Papanastasiou

analyst
#70

Yeah. I was just — if you could compare things like how the financing works, counterparty risk, the economics, and so on, and how those might look different for outside projects versus U.S. ones.

Haris Basit

executive
#71

My sense is it will be different, but at this point we lack sufficient information. In Europe, I'd expect it to be less different than, obviously, in Bhutan; sometimes the tenant could turn out to be the same big hyperscaler you'd see in the U.S. Still, it's premature for us to give a really informed response on the ways it could differ. We anticipate it being significantly different, though our current focus is the U.S.

Bill Papanastasiou

analyst
#72

Thanks for that. Moving to my second question — I realize this has come up already on today's call — but could you give us a refreshed view of how you're allocating capital, now that the SEALMINERs have made progress and Bitcoin mining economics have improved? Looking at your portfolio of power capacity, which is more than 1 gigawatt, how do you see that blend of Bitcoin mining and HPC shifting across the years, and has anything changed on that front?

Jeff LaBerge

executive
#73

Sure. What I'd say is that it really hasn't moved much. We're approaching this with a very long-term mindset. Clearly, the rationale for bringing some HPC into our power portfolio comes largely from a desire to diversify. And like Jihan said before, it's also about not centralizing the Bitcoin network; so layering that mix of revenue — that steady revenue stream — on top of what Bitcoin mining brings in makes a great deal of sense. So viewed that way, I don't see it shifting a great deal. That said, we definitely are happy to see stronger Bitcoin mining economics at the moment, and I believe that will benefit us over the short term.

Jihan Wu

executive
#74

Thank you.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Bitdeer Technologies Group transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Bitdeer Technologies Group earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Bitdeer Technologies Group or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.