Appreciate it, operator, and hello everyone. Glad to have you on Bitdeer's Q1 2025 earnings call. Here with me right now are Jihan Wu, our Chairman and CEO; Matt Kong, Chief Business Officer; Haris Basit, Chief Strategy Officer; and Jeff LaBerge, who leads Capital Markets and Strategic Initiatives. Haris is going to kick things off by giving a broad look at how Bitdeer performed in the first quarter of 2025, and after that he'll walk through our strategy along with a thorough business update. Following him, Jeff will dig deeper into the financials for Q1, and once that's done, we'll take your questions. Alongside this call, we've posted a supplemental investor presentation, which you can access on Bitdeer's Investor Relations site in the Webcasts and Presentations section. Before the team delivers their prepared comments, we want to remind all of you that we might make forward-looking statements on this call. Those are built on what management currently expects and carry risks and uncertainties that could lead actual outcomes to differ materially; if you want a fuller picture of our forward-looking statements and the risks and uncertainties tied to Bitdeer's business, take a look at the filings we've made with the SEC. Also, besides going over figures reported under International Financial Reporting Standards, or IFRS, we'll reference some non-IFRS financial measures, including adjusted EBITDA and adjusted profit or loss; for more specifics on those non-IFRS measures, check our earnings release, which came out earlier today and is available on Bitdeer's Investor Relations website. Thanks. I'll hand things over now to Haris. Haris?

Haris Basit

executive
#2

Thanks, Yujia, and hello, everyone. I appreciate you all being here for our first quarter 2025 earnings call. It's a pleasure to talk about the numerous things taking place at Bitdeer and to take you through what we've accomplished since the previous quarter. Before we get into it, let me quickly call out our Q1 financial results, and Jeff will give you more specifics on those in just a few minutes. Beginning on Slide 3, for Q1, total revenue came in at $70.1 million, gross profit was negative $3.2 million, and adjusted EBITDA was negative $56.1 million. The weaker performance versus Q1 of last year was mainly caused by the impact of the 2024 halving, a higher global network hashrate, reduced hosting and cloud mining revenue, and increased R&D costs tied to the one-off development and tape-out costs of our SEAL03 chip. Those negative effects were partly offset by a higher average self-mining hashrate, which rose to 11.5 exahash per second at the close of the quarter, along with higher bitcoin prices. During the last year, we made the strategic choice to put priority on developing our own ASIC technology. Although that temporarily slowed the growth of our hashrate, it gave us long-term advantages that fundamentally set our business apart. Building our own machines lets us scale with a significant cost advantage and keep greater control over our growth trajectory. Now that our SEALMINERs are rapidly rolling off the production line, we anticipate a swift acceleration in self-mining hashrate over the coming quarters. At the same time, we are bringing online close to 500 megawatts of new self-mining power capacity by mid-year, which lifts our total global capacity to almost 1.6 gigawatts. Over half of that power sits in Norway and Bhutan, and our early emphasis on geographic diversification is now paying off. So in the near-term, we are prioritizing deployments of our A2 mining machines to Bhutan and Norway, which we expect will push our self-mining hashrate to 40 exahash per second by October 2025. On the commercialization side, we're encouraged by the recent trade negotiations, which have brought a de-escalation in tariffs. Going forward, we expect U.S. tariff policies to spur more Bitcoin mining-related manufacturing in the U.S. and foresee a continued shift toward more balanced trade measures. We intend to move a portion of our manufacturing to the U.S. in the second half of 2025, and we'll share more details about this in future calls. Over the longer-term, we expect demand for Bitcoin mining rigs to keep rising. Owning the most efficient chip will be essential to capture this multi-billion dollar TAM. Turning now to our ASIC roadmap, which is highlighted on Slide 5 of our supplemental presentation. Beginning with SEALMINER A1, at the end of Q1, we completed the mass production of 3.7 exahash per second of our SEALMINER A1 mining rigs and finished installation and energization as of the end of April 2025; for SEALMINER A2, mass production of the previously announced 35 exahash per second remains on track to be completed in October 2025. By the close of April, we had finished producing 3.3 exahash per second of SEALMINER A2 mining machines, while another 1.2 exahash per second sat in assembly. Out of that 3.3 exahash per second of finished rigs, 1.3 exahash per second have gone to outside buyers and been shipped, and 0.5 exahash per second are now installed and powered up at Bitdeer data centers located in Texas and Tydal, Norway, while the rest are either in transit or getting ready to ship. Also, at the close of Q1, we rolled out a pro series of SEALMINER A2 mining rigs, offering both an air-cooled version and a hydrocooled version, each delivering an impressive power efficiency of 14.9 Joules per Terahash; as for SEALMINER A3, during April we finished rigorous testing on several dozen prototype units, and energy efficiency keeps coming in at our expectations. Machine level testing is now underway, with results due to be finalized by late Q2; we expect mass production of SEALMINER A3 to begin in Q3 of this year. Turning to the second half of this year, our R&D work has shifted toward the SEALMINER A4 project, where we aim for an unprecedented efficiency of roughly 5 Joules per Terahash at the chip level. This chip has been entirely redesigned from scratch, using a new digital architecture and technology that substantially boosts energy efficiency. We think this fresh chip design will transform how Bitcoin mining ASICs get built going forward. We've started filing patents covering this technology, and tape-out remains on schedule for Q4 2025. We believe SEALMINER A4, together with our third generation chip, will establish Bitdeer as the top supplier of the most energy efficient mining rigs globally, considerably reinforcing our market position and unlocking significant value for our customers and shareholders. On Slide 6 of our supplemental investor presentation, we restate our earlier guidance calling for our self-mining hashrate to hit roughly 40 exahash per second by Q4 of this year. With so much power capacity coming online, our near-term plan is to direct our current ASIC output toward self-mining and put most of our new power capacity in Tydal, Norway and Jigmeling, Bhutan to use. Keep in mind that this forecast excludes anticipated additional wafer allocations for SEAL02 or for SEAL03. Depending on the precise manufacturing schedule and actual wafer allocations, our self-mining hashrate might end up well above the 40 exahash per second guidance by Q4 2025. Now I'd like to give a quick update on our energy infrastructure and pipeline, which is highlighted on Slides 7 and 8 of our supplemental investor presentation. During early April, Bitdeer signed an SPA and a turnkey agreement covering the acquisition and construction of a 50 megawatt mining data center in Ethiopia. That transaction involves a local company holding a mining permit, a 33 kV substation interconnection and a four-year power purchase agreement with Ethiopian Electric Power Company. We're collaborating tightly with an EPC contractor focused on Bitcoin mining, and our aim is to have it energized by Q4 2025. That project shows how we keep pursuing low-cost locations, so we can retain older generation machines in operation and get the most ROI out of the fleet we already have. Also, during April, we brought online 202 megawatts of data center capacity for self-mining. Of that, 70 megawatts came from our Tydal, Norway location, while 132 megawatts were in Jigmeling, Bhutan. The remaining 105 megawatts at Tydal and 368 megawatts at Jigmeling should be energized before June ends, which would push our total available power capacity to just under 1.6 gigawatts. Before 2025 finishes, we also remain on schedule to energize another 221 megawatts in Massillon, Ohio, and once our Ethiopia site is included, our overall available power capacity will exceed 1.8 gigawatts. Lastly, in April, because talks with development partners and end users for HPC/AI kept moving forward, we chose strategically to halt Bitcoin mining-related construction at our 570 megawatt site in Clarington, Ohio. Even so, we keep complete optionality to revisit and restart the buildout for Bitcoin mining down the road. On our HPC/AI effort, during March we made formal an engagement with Northland Capital Markets to serve as financial advisor for our HPC/AI data center development strategy. Northland has been helping us in negotiations with prospective development partners by offering guidance about capital providers. As of May, we have moved forward discussions with development partners and possible end users of selected large scale sites in the U.S., among them our Clarington, Ohio site, for HPC and AI. To sum up, plenty of exciting milestones lie ahead. We believe 2025 will be a pivotal year as our work begins to pay off, and we're eager to share updates about our progress. I'll now hand things over to Jeff LaBerge, our Head of Capital Markets and Strategic Initiatives, to walk through our financial results for the quarter.

Jeff La Berge

executive
#3

Thanks, Haris. Before I walk through the financial results for Bitdeer's first quarter, I want to remind everybody that every figure I mention today is denominated in U.S. dollars, and every comparison I make is against Q1 of the prior year. Consolidated revenue for Q1 came in at $70.1 million, compared with $119.5 million. Self-mining revenue reached $37.2 million, a drop of 23.1%, driven mainly by the halving event in April 24 along with a rise in global network hashrate, though those were partly offset by a larger self-mining hashrate and stronger bitcoin prices. Cloud hashrate revenue came to $0.1 million, compared with $18.1 million; that decrease resulted from long-term cloud hashrate contracts running out and the hashrate then being reallocated into our self-mining operations. General Hosting revenue totaled $9.6 million, compared with $29 million. Membership Hosting revenue was $16.3 million, compared with $19.5 million. SEALMINER sales revenue in Q1 came to $4.1 million. Two main factors caused the drop in Hosting revenue. First, at our Texas facility we converted 100 megawatts of Hosting capacity into hydro cooling capacity, which we expect to be renovated and fitted with SEALMINER hydrocooled mining rigs that start phasing in during the first quarter of 2025. Second, following the halving in April 2024, certain Hosting customers pulled out less efficient miners. New hosted mining rigs are presently replenishing part of that extra capacity. Gross profit for the quarter was negative $3.2 million, compared with positive $34.1 million, while gross margin was negative 4.6%, compared with 28.6%. The drop in our gross margin came mainly from the April 2024 halving events, its effect on our self-mining, and reduced hosting and cloud hashrate revenues. Operating expenses for the quarter totaled $75.8 million and $37.8 million. The rise came mainly from greater R&D costs tied to the one-off tape-out costs for SEALMINER 03, higher engineering costs tied to the company's ASIC development roadmap, and non-cash amortization expenses on intangible assets tied to the FreeChain acquisition in Q4 2024. Other operating expenses were $7.8 million, mainly because of a non-cash impairment of Bitcoin. As a reminder, IFRS classifies Bitcoin as an intangible asset, measured at cost less any accumulated impairment losses, with no subsequent revaluation allowed. Other net gain for the quarter was $503.1 million, compared with $2.4 million. That net gain stemmed from non-cash derivative gains on the convertible bonds issued in August 2024 and November 2024, plus the Tether warrants, which I'll cover in more detail in the liability section. IFRS net profit was $409.5 million and $0.6 million. Adjusted profit was negative $89.8 million, compared with positive $9.7 million. Adjusted EBITDA was negative $56.1 million, compared with positive $27.3 million. The weak performance this quarter relative to Q1 last year came mainly from the impact of the 2024 halving, a higher global network hashrate, reduced hosting and cloud mining revenue, and greater R&D costs as I described earlier. Those negative effects were partly offset by a higher average self-mining hashrate and stronger Bitcoin prices during the quarter. Operating activities consumed $284 million in net cash, mostly because of SEALMINERs along with supply chain and manufacturing. Investing activities took up $73.6 million in net cash, which breaks down into $45.7 million of capital expenditures tied to infrastructure construction and mining rigs, $18.2 million spent buying cryptocurrencies, $21.9 million to purchase the Alberta site and gas-fired power project, and $12.3 million in proceeds coming from disposing of cryptocurrencies from the principal business. Financing activities brought in $94.9 million of net cash for the quarter, driven mainly by $118.4 million in net proceeds from share issuance through our ATM facility during January and February, partly offset by $21 million allocated to share repurchases. Turning to what we plan to spend on Bitcoin mining infrastructure in 2025, our expectation for CapEx on continuing to build out global power and data center infrastructure now sits at roughly $260 million to $290 million for calendar year 2025. Reported infrastructure CapEx from Q1 is baked into this update. The drop relative to our earlier guidance comes from about $80 million in savings tied to pausing Bitcoin mining infrastructure construction at the Clarington, Ohio, site that Haris mentioned earlier. Keep in mind this guidance covers only power and data center spending for Bitcoin mining and excludes CapEx on SEALMINERs deployed for self-mining; on the balance sheet side, we closed the quarter financially strong, holding $215.6 million in cash and cash equivalents, $131.1 million in cryptocurrencies, and $215.4 million in borrowing excluding derivative liabilities. Derivative liabilities stood at $256.8 million, tied to the Tether warrants plus the August 2024 and November 2024 convertible notes, marking a $507.2 million decrease versus the prior quarter. Once more, that reflects a non-cash fair value adjustment caused by our stock price falling, and it has no effect on liquidity or operations. IFRS requires certain derivative instruments, including warrants and convertible debt, to be revalued at fair market value every reporting period. When our stock price goes up, the fair value of those instruments climbs, producing a larger reported liability, and the reverse holds true as well. The liability on the books will eventually be netted out at settlement, whether through conversion into equity or expiration, and it does not reflect real cash going out. During April 2025, we signed a loan agreement with Matrix Finance and Technology Holding Company for a financing facility worth up to $200 million. Draws under this facility carry a variable interest rate of 90% plus a market-based reference rate. Every drawdown gets repaid through fixed monthly installments across 24 months and is secured by a pledge of SEALMINERs. As of today 2025, we have drawn roughly $90 million from this facility. Lastly, on our outstanding ATM facility, we haven't sold any further shares since the middle of February 2025 because of the broader market correction. Thank you, everyone; that wraps up the prepared remarks portion of our earnings call. Operator, please open the call for questions.

Darren Aftahi

analyst
#4

Morning, everyone. Appreciate you fielding my questions, and it's great to watch all the momentum. Two items. First, previously you mentioned outside parties being interested in A2, and I believe the figure was around 7 exahash. Later, earlier in this year, you discussed moving that capacity internally for self-mining. Obviously things evolve quickly, so I'm wondering how interest has shifted—perhaps not specifically in A2, but in your chips overall—over the recent weeks. Does third-party demand remain at similar levels? Has it moved at all since you stated you'd shift that production internally? Second, regarding the 40 exahash goal for year-end: you, Haris, noted possible upside there. What factors are being weighed with respect to that goal? Is it purely rigs and power that's available, or is there a more subtle element involved? Thanks.

Haris Basit

executive
#5

I'll handle this one. Broadly speaking, we believe appetite for buying mining ASICs from us has risen considerably following the climb in Bitcoin's price. That's entirely expected. As you can observe, we shifted a portion of sales related to Bitcoin mining rate, yet regardless—self-mining remains our top priority. We intend to complete our Bitcoin mining farm that will be constructed over the course of this year. On the second point, about upside to our goal: given the present trading environment, substantial uncertainty exists regarding capacity availability, since everybody might seek additional capacity from TSMC and build up inventory, and some could potentially walk away. We can't predict what their choices and forecasts will be, but our confidence in TSMC as both our capacity and technology partner stays strong, and we remain in communication with them. So I believe we can, at minimum, assure the earlier target <<inaudible>>.

Darren Aftahi

analyst
#6

Great, thank you.

Ben Summers

analyst
#7

Hello, good morning everyone, and I appreciate you taking my question. To start, regarding the choice to halt Bitcoin mining development at Clarington — could you share any details about which kinds of customers you're hearing from, and where the robust demand for that location is coming from?

Haris Basit

executive
#8

Sure, I can address that. Right now, we are receiving some inquiries from prospective end users or tenants; however, the main focus for us is finding a development partner to collaborate with on building out this site. The folks we're engaging with have solid relationships across every hyperscaler. Right now, though, we haven't reached the point of going after those hyperscalers directly. What's happening is we're receiving a bit of inbound interest—requests that just come to us on their own. Our priority is still getting a contract signed with the development partner.

Ben Summers

analyst
#9

Understood. That's really useful. Now, regarding the loan deal we recently signed — I suppose the question is, why at this point? Also, how are we viewing the capital structure going forward, and perhaps how are we approaching the management of the Bitcoin holdings on our balance sheet as the business keeps growing?

Jeff La Berge

executive
#10

Jihan, would you like to handle that, or would you prefer that I do? I can address it. So, yes, at present, once again, given a wider market pullback, we halted our use of the ATM back in February, when prices fell fairly sharply. Thus, we have always remained highly mindful of dilution in our — when it comes to how we raise capital; and we believe the business is able to — is capable of carrying some level of debt to fund, particularly on the mining rig side, where there's a particular payback opportunity tied to how the proceeds get used. So it seemed to us that a prudent, sensible level of debt might be employed to fund the chip acquisitions.

Ben Summers

analyst
#11

Great, appreciate you fellows fielding my questions.

Kevin Cassidy

analyst
#12

Hello, and thanks for allowing me to ask something, plus congrats on how well things are going. Regarding that SEAL A4 ASIC you're aiming at for Q4, and afterward, once the SEALMINER A4 becomes available, what plan do you have in mind? It looks like demand will be really strong for that kind of equipment among other miners. Will you keep it mostly in-house, or is there sufficient capacity to both sell it outside and deploy it internally?

Haris Basit

executive
#13

As our current capacity gets filled by A2s plus a portion of A3s, the shift toward selling more externally will happen on its own; thus for A4, assuming tape-out occurs in Q4 like we anticipate, the machines won't be mass-production ready until a minimum of 2 quarters later, possibly a bit beyond that. So at that point my expectation — though certainty isn't possible — is that we'll mostly be selling to outside buyers, since our own capacity ought to be nearly maxed out. And should TSMC give us the amount of capacity we're hoping for, meaningful external sales ought to be achievable.

Kevin Cassidy

analyst
#14

All right, that's excellent. And that really raises the issue of how the changeover happens — say you move from the SEALMINER A2 over to A3; would you expect the A3 to remain in production for roughly another year once the A4 has launched?

Haris Basit

executive
#15

The A4 hasn't been taped out at this point. Should the A4 get taped out and we receive the chip, my belief is that would happen at the close of the year, and then it would reach the point of being ready for mass production. Following that, I think the A3 and the A4 are going to sit side by side for a fairly lengthy period, since the A3, in my view, will come in at a lower cost measured as dollars per Terahash compared with the A4; so it's going to be — it's going to hinge on varying circumstances, specifically which mining racks, which users, and we ourselves prefer to pick. And it's going to hinge on additional elements as well. Were we to enjoy truly plentiful capacity, then I think the A4 could become the favored option. Yet if the overall capacity we're able to secure from TSMC turns out to be constrained, then I think the A3 might in fact be the superior choice, given that it can produce considerably more hashrate out of the wafers.

Kevin Cassidy

analyst
#16

All right, that's excellent. Having those choices available is a plus. Thank you.

Nick Giles

analyst
#17

Thank you, operator. Morning, everybody. Folks, sorry in case I overlooked this, yet it seems power expenses came in a bit higher during 1Q. I figure that stemmed from certain severe weather conditions earlier in the year, but could you briefly discuss the way electricity costs might move going forward?

Jeff La Berge

executive
#18

Sure. Q1 has traditionally been the priciest power period we see across the entire year; that mostly comes from a few factors. First off, within Bhutan, we hold a nine-month PPA priced at roughly $0.04 and $0.0425 per kilowatt hour, which covers Q2 through Q4. Q1 counts as the dry season there. Because of that, across that quarter we generally buy power out of the Indian market. We're exploring alternatives, power purchase agreements plus other forward power pricing opportunities, to cover that need going forward; we couldn't arrange it in time for Q1, so Bhutan's prices ran elevated. Beyond that, Rockdale's prices were somewhat elevated simply on a historical basis. So that was what mainly drove the recent Q1 power price. Looking ahead, Q2 and Q3 tend to be cheaper quarters for us. We're rolling out a far more aggressive power supply strategy, and we anticipate a portion of that beginning to pay off during the coming quarter, perhaps Q3.

Nick Giles

analyst
#19

I appreciate that, it's quite useful. For my follow-up, it's obvious that your ASIC units could potentially sit at the front of the pack, yet analysts haven't had enough time to actually observe how they perform and how much they get used. So when do you think the market first gets a real look at the overall efficiency of your fleet, especially regarding a few of the newer generations?

Haris Basit

executive
#20

Despite the fact that we want those machines badly for our own mining operation, we're still allocating a portion of what we can produce to buyers. That way they can put them through their paces. And up to this point things look good; I believe the quality of our equipment is already becoming apparent, we have a great deal of confidence in it, and that concerns A2 and A4. Shipping A3 units out to our buyers will happen in October. Which means the soonest buyers get to trial A3s is October.

Nick Giles

analyst
#21

Understood, everyone. Thanks for all the details. Good luck out there.

John Todaro

analyst
#22

Hi everyone, I appreciate you answering my question. Nice work on the advances. My first question is, I suppose, simply attempting to grasp what level we ought to aim for regarding average fleet efficiency. Clearly, a number of these deployments will bring that efficiency down substantially. I'm just curious, for roughly the latter half of 2025, and after that, 2026, what would that average approximately come out to? Then I have a follow-up regarding the HPC.

Jeff La Berge

executive
#23

Yeah. John, I'll handle that one. So given our — clearly our average has declined since the prior quarter, likely sitting somewhere in the high-20s right now, versus around 31 that has been roughly the historical figure for our legacy fleet. Once we move toward that 40 exahash level, we ought to land in the lower-20s, within the 22 to 24 Joules per Terahash band. That holds true provided we maintain all of our current hashrate running, which is what we intend to do at present. Down the road, clearly, we'll begin retiring certain older machines. A portion of those could be relocated to cheaper power markets such as Ethiopia, and perhaps Canada later on; yet once those begin getting retired or offset by newer — by certain of our more recent generation rigs, we'd anticipate that efficiency figure falling into those — into the teams.

John Todaro

analyst
#24

Got it, that helps. Now, regarding HPC, it seems that if you bring in a development partner, you'd aim for either a powered shell or possibly the whole stack. Still, I did see that Massillon wasn't halted while Clarington was. Are you still considering both locations for HPC, or will Massillon be dedicated to Bitcoin mining while the 266 megawatts at Clarington go toward HPC?

Haris Basit

executive
#25

At this moment, Clarington is where our attention lies. And that means not only the initial 266 megawatts, but all 570 megawatts available at Clarington. As for Massillon, we're proceeding with Bitcoin mining at that site right now.

John Todaro

analyst
#26

Understood. Alright. That's great. Thanks. I appreciate it, everyone.

Brett Knoblauch

analyst
#27

Hey everyone, thanks for taking my question. Perhaps just regarding the ASIC side, I recall previously you guys mentioned that you would allocate approximately 7 exahash toward external sales. Should we still anticipate 7 exahash of sales for this year? And concerning the $4.1 million in ASIC sale revenue this year, was that tied, or this quarter, was that tied to 1.3 exahash that got shipped?

Haris Basit

executive
#28

I will ask Jihan to respond regarding the volume of sales we're going to allocate for this year.

Jihan Wu

executive
#29

Okay, so this is really a decision that shifts with circumstances. The actual way things work is that I give the green light to each request that comes in through the sales emails, one message at a time. Usually, my preference is to send units to our own mining farm and run self-mining there, and that really hinges on the buyers and on whether we honestly believe they have genuine interest and an actual trial in mind for the mining rigs. Because of that, I'm not in a position to hand you a highly accurate forecast of what we'll decide.

Brett Knoblauch

analyst
#30

Then, regarding the ASIC revenue or the sale this quarter, does that originate from the 1.3 that was shipped?

Haris Basit

executive
#31

That's right. Yes. So a piece of that got recognized during the quarter. There could be some more recognized in Q2.

Brett Knoblauch

analyst
#32

And is an average selling price of roughly $15 per tariff still what we should anticipate?

Haris Basit

executive
#33

Jihan, pricing is not going to move at all. That's not my expectation.

Jihan Wu

executive
#34

Okay, since the market itself is competitive, we’ll have to give our customers pricing that can compete. As far as I recall, the latest price point is $12.8 per exahash. When it comes to A2 and A2 Pro, we’ll simply respond to what the market does. Should rivals cut their prices, my expectation is that we’ll do the same. In any case, the volume we’re selling is constrained. Right now, we aren’t in a position where we can afford to sit out any pricing battles.

Brett Knoblauch

analyst
#35

Got it completely. Then, regarding expansion in self-mining, I believe I caught that you folks anticipated 40 exahash by October. Does that mean by October, or by the close of the year?

Haris Basit

executive
#36

By October.

Brett Knoblauch

analyst
#37

So that would be by October. All right. That's great. We truly appreciate it, everyone. Thanks.

Haris Basit

executive
#38

Thanks as well.

Mike Grondahl

analyst
#39

Hi everyone, thanks. I've got two things to ask. First, with your CapEx outlook now reduced to a range of $260 million to $290 million, can you point out where that money is headed during this year? Second, could you give us additional specifics regarding the SEALMINER loan facility? Is it meant for the chips, for inventory, for financing, for finished goods — just assist us in grasping how it functions from a mechanical standpoint.

Jeff La Berge

executive
#40

Yeah, absolutely. Mike, I'll handle the opening portion. The CapEx mostly concerns completing the Tydal, Norway location and the Jigmeling location, plus our Massillon, Ohio, location; those three together come to roughly $120 million. We've also got funds allocated in there to wrap up Texas, a bit for Canada, and a minor portion for the Ethiopia project. And once more, that $260 million covers the whole year. So what I just mentioned was essentially what's left over, perhaps $190 million remaining for the balance of the year; and pardon me, what was your other question, Mike?

Mike Grondahl

analyst
#41

Regarding that SEALMINER loan facility you mentioned putting in place not long ago — mechanically speaking, what's the structure? Does it cover chips, inventory, or finished goods?

Jeff La Berge

executive
#42

Right. The purpose is funding chip purchases, and the loan is secured by those chips throughout the entire process, right up to the final SEALMINER.

Mike Grondahl

analyst
#43

Understood — so in a way, those miners are functioning as collateral, a sort of presale, if you like.

Jeff La Berge

executive
#44

That's right, or in this instance, for self-mining purposes.

Mike Grondahl

analyst
#45

Understood. Alright, I appreciate it.

Brian Kinstlinger

analyst
#46

Excellent, many thanks. I'd like to know: if tariffs reached a certain threshold, when would Bitdeer choose to sell to outside buyers instead, thereby shifting its current approach? Is 30% a level you'd feel at ease with, particularly in the event that semiconductors aren't exempted? I'm just wondering how that could shape your call, assuming 30% is the figure.

Jihan Wu

executive
#47

In the end, we think the tariffs will turn out to be fairly sensible. My view is that the bargaining approach being taken won't become the final tariff regime adopted by the U.S. government. Also, chips manufactured in Taiwan are a crucial matter — I doubt they'd be subjected to steep tariffs. That leaves us with plenty of options to keep our operations workable even within the United States. Take one example: we could bring the chips into the United States and carry out sampling there — that's one potential route we're currently assessing. A second option: we also have overseas capacity in Norway, Bhutan, and Ethiopia. Those kinds of products face low tariffs too, so we're able to conduct our self-mining in those locations. Broadly speaking, I'd say tariffs will generate greater economic activity on American soil, though naturally this isn't about efficiency or prosperity. It's driven more by the goal of national self-sufficiency and security, and by generating employment domestically. So everyone, ourselves included, must give up something. Still, on the whole, I believe it'll be fine — particularly during the first few years.

Brian Kinstlinger

analyst
#48

Great. One more thing from me about demand — you folks have been collecting deposits. Roughly what share of that demand for ASICS originates beyond the United States, if you can say?

Jihan Wu

executive
#49

At this point, the bulk comes from the United States.

Brian Kinstlinger

analyst
#50

Great. Thank you.

Bill Papanastasiou

analyst
#51

Morning, everyone, and congratulations on the progress. One quick thing from me. To build on that earlier question about tariffs, maybe you could address how demand from customers has been moving lately for the SEALMINERs that are coming. We have watched quite a few Bitcoin mining firms scale back, capital spending on Bitcoin mining. Also, has the mix of interest shifted at all away from North America toward other regions after the tariff situation as of late? And might you — do you believe you might see a bigger share of customer sales later on originating from that rest-of-world piece. Thanks.

Jihan Wu

executive
#52

Well, on one hand U.S. based Bitcoin miners possess the finest capital market globally. They are able to raise capital to grow their operations. My view is this won't shift anytime soon. Yet simultaneously, dilutions may be somewhat unwelcome in the market. That's my read from those reviews and remarks. So I believe U.S. based Bitcoin miners will begin to seek a method to grow their operations while avoiding dilution of the share base <<inaudible>> essentially expand quickly. So I'd say that points to there being leverage, though it's still leverage, and they're going to need confidence regarding revenues down the road, with particular management consequences pulling in a whole range of issues — that was everything I managed on the capacity side. So in a sense, some transparency is going to be required from the suppliers of mining rigs, and that's something Bitdeer is unable to figure out by itself. So overall, my sense is we feel confident, since the U.S. has become very strong on energy, has a very solid capital market, and has an entrepreneurial culture that lets businesses scale. When it comes to total hashrate market share, the Southern United States holds it; my view is that it will keep expanding from where it is now, going from about 30% perhaps to a level that's even greater. That said, I believe the process will be quite gradual. The rate of expansion won't match what we saw previously. In the U.S., we went from essentially nothing—or a very tiny slice of hashrate—up to 30%, which is impressive movement. My view is that America's portion of the market will keep climbing, though it's going to (inaudible). Right. I don't know whether that actually addressed what you were asking.

Bill Papanastasiou

analyst
#53

No. That's really helpful context. And then, as a sort of follow-up on that point, we have observed a number of miners signing ASIC option and payment arrangements so they can pick up additional capacity. Is there any consideration of possibly pursuing a comparable kind of arrangement at Bitdeer for the A4s or A3s at some point later on?

Jihan Wu

executive
#54

Are you asking whether we extend credit to our customers?

Bill Papanastasiou

analyst
#55

Yeah, pretty much, that's right.

Jihan Wu

executive
#56

At this point, we don't really have that as part of our plans — tapping into market capital out there under really favorable financing terms. So clearly, what we'll do is collaborate with partners on the financial side to address this type of issue. My sense is that there's far more that can be done there than Bitdeer on its own extending that sort of credit. Since there are plenty of negative stories in the finance or business context, if you begin offering that sort of credit to a customer for that sort of capital equipment on your own, it could end up distorting the economic signal quite a bit.

Bill Papanastasiou

analyst
#57

Thanks for the detail — really appreciate it.

Haris Basit

executive
#58

Thanks.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Bitdeer Technologies Group transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Bitdeer Technologies Group earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Bitdeer Technologies Group or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.